Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New Market, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 220ft / 67.5mTotal length
  • $18,722,000Total costs
  • 24,824Total average daily traffic
  • 333Total average daily truck traffic
  • 35,398Total future (year 2034) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for New Market
  • No street view available for this location

New bridges in New Market, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 51930-1939
  • 71940-1949
  • 51950-1959
  • 61960-1969
  • 11980-1989
  • 11990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in New Market, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 11970-1979
  • 11980-1989
Average Bridge Daily Traffic in New Market, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 17.6%Excellent
  • 5.9%Good
  • 47.1%Satisfactory
  • 29.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.8%Excellent
  • 5.9%Very good
  • 47.1%Satisfactory
  • 35.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 17.6%Excellent
  • 5.9%Good
  • 23.5%Satisfactory
  • 47.1%Fair
  • 5.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.6%Excellent
  • 7.1%Very good
  • 7.1%Good
  • 39.3%Satisfactory
  • 39.3%Fair
  • 3.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Very good
  • 9.1%Good
  • 63.6%Satisfactory
  • 18.2%Fair
Find on map >>   Show street view

Structure Number: 1142,  Location: 0.5 MI SO JCT CO RD 487 (Lat: 34.952747,  Lng: -86.482350),  Route carried "on" structure: County highway 257,  Year Built: 1934,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,138 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,365 (year 2034),  Design Load: H 15,  Features Intersected: SWAMP BRANCH,  Facility Carried by Structure: BUTLER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 19.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $267,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1677,  Location: 0.5 W JCT CO RD 305 (Lat: 34.880433,  Lng: -86.455142),  Route carried "on" structure: County highway 453,  Year Built: 1937,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 600 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 730 (year 2034),  Design Load: H 15,  Features Intersected: RICE BRANCH,  Facility Carried by Structure: OSCAR PATTERSON R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $551,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1679,  Location: 2.3 MI JCT CO RD FAP116 (Lat: 34.836675,  Lng: -86.421261),  Route carried "on" structure: County highway 469,  Year Built: 1937,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 600 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 780 (year 2040),  Design Load: H 15,  Features Intersected: ELDER BRANCH,  Facility Carried by Structure: COUNTY LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $320,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2079,  Location: 2.0 MI N JCT CO RD 415 (Lat: 34.820919,  Lng: -86.363222),  Route carried "on" structure: County highway 416,  Year Built: 1939,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 35 (year 1992),  Average Future Daily Traffic: 55 (year 2040),  Design Load: H 15,  Features Intersected: MOLDER CREEK,  Facility Carried by Structure: SHARPES COVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $245,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 208,  Location: 0.2 MI EAST CO RD 1468 (Lat: 34.801858,  Lng: -86.403397),  Route carried "on" structure: County highway 433,  Year Built: 1939,  Status: Posted for load,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 927 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,112 (year 2040),  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: COUNTY LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 7.47m (24.51ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,076,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,184,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2486,  Location: 0.7 MI SO CO RD 1469 (Lat: 34.832139,  Lng: -86.455364),  Route carried "on" structure: County highway 258,  Year Built: 1940,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 600 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 890 (year 2035),  Design Load: H 15,  Features Intersected: BURDINE CREEK,  Facility Carried by Structure: MAYSVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $370,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $407,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2501,  Location: 0.5 MI FAP 116 (Lat: 34.843528,  Lng: -86.454297),  Route carried "on" structure: County highway 469,  Year Built: 1940,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 520 (year 1990),  Truck Traffic: 1%,  Average Future Daily Traffic: 780 (year 2040),  Design Load: H 15,  Features Intersected: SO FORK LAWLER BRANCH,  Facility Carried by Structure: COUNTY LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $256,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2502,  Location: 0.3 MI W CO RD 480 (Lat: 34.987056,  Lng: -86.410636),  Route carried "on" structure: County highway 477,  Year Built: 1940,  Status: Posted for load,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 195 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 210 (year 2035),  Design Load: H 15,  Features Intersected: JENNY RIVER,  Facility Carried by Structure: STEEL LA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.88m (9.45ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $493,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $542,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 262,  Location: 0.2 MI SO CO. RD 1448 (Lat: 34.845411,  Lng: -86.453953),  Route carried "on" structure: County highway 258,  Year Built: 1941,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 600 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 800 (year 2040),  Design Load: H 15,  Features Intersected: LOCUST GROVE BRANCH,  Facility Carried by Structure: MAYSVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $366,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2977,  Location: 1.0 MI SOUTH TENN ST LI (Lat: 34.982433,  Lng: -86.404550),  Route carried "on" structure: County highway 305,  Year Built: 1946,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,500 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,900 (year 2035),  Design Load: H 15,  Features Intersected: PRATER SPRING BR,  Facility Carried by Structure: WINCHESTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $256,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3942,  Location: 0.3 MI NE JCT CO RD 485 (Lat: 34.977739,  Lng: -86.451636),  Route carried "on" structure: County highway 486,  Year Built: 1950,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 75 (year 1992),  Average Future Daily Traffic: 62 (year 2035),  Features Intersected: HESTER CREEK,  Facility Carried by Structure: PHILLIPS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Fair,  Channel: Fair,  Operating Rating: 82.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $356,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4501,  Location: 0.1 MI E JCT CO RD 468 (Lat: 34.878972,  Lng: -86.387164),  Route carried "on" structure: County highway 436,  Year Built: 1915,  Year Reconstructed: 1953,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 125 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 225 (year 2040),  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: SHARPES HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $384,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4708,  Location: 0.4 MI N CO RD 1436 (Lat: 34.862092,  Lng: -86.405297),  Route carried "on" structure: County highway 468,  Year Built: 1953,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 450 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 710 (year 2040),  Features Intersected: STILLHOUSE CREEK,  Facility Carried by Structure: HURRICANE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 20.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $250,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5372,  Location: 1.6 MI NW OF PLEVNA (Lat: 34.984878,  Lng: -86.423233),  Route carried "on" structure: County highway 480,  Year Built: 1955,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 125 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 115 (year 2040),  Design Load: H 15,  Features Intersected: JENNY RIVER,  Facility Carried by Structure: J B WALKER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 17.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.15m (10.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $499,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5684,  Location: 0.8 MI EAST CO ROAD1468 (Lat: 34.837117,  Lng: -86.402989),  Route carried "on" structure: County highway 434,  Year Built: 1956,  Status: Posted for load,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 250 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 325 (year 2040),  Design Load: H 15,  Features Intersected: HURRICANE CREEK RELIEF,  Facility Carried by Structure: COUNTY LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 19.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $431,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $474,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5686,  Location: 0.2 MI S TN STATE LINE (Lat: 34.987981,  Lng: -86.399561),  Route carried "on" structure: County highway 481,  Year Built: 1956,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 100 (year 1992),  Average Future Daily Traffic: 92 (year 2042),  Design Load: H 15,  Features Intersected: JENNY RIVER,  Facility Carried by Structure: HONEY DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.15m (10.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $497,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $547,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7184,  Location: 0.5 MI EAST CO RD 1468 (Lat: 34.837111,  Lng: -86.402997),  Route carried "on" structure: County highway 434,  Year Built: 1960,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 250 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 325 (year 2040),  Design Load: H 15,  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: COUNTY LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $373,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $410,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7185,  Location: 0.7 MI E JCT CO RD 468 (Lat: 34.852853,  Lng: -86.398656),  Route carried "on" structure: County highway 436,  Year Built: 1960,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 100 (year 1992),  Average Future Daily Traffic: 165 (year 2040),  Design Load: H 15,  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: RAY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.12m (10.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $432,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $475,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8093,  Location: 2.6 MI W JCT FAP 116 (Lat: 34.961183,  Lng: -86.463144),  Route carried "on" structure: County highway 487,  Year Built: 1963,  Year Reconstructed: 1993,  Status: Posted for load,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 705 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 825 (year 2040),  Design Load: H 15,  Features Intersected: HESTER CREEK,  Facility Carried by Structure: BUDDY WILLIAMSON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 10.29m (33.76ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $2,046,000,  Roadway Improvement Cost: $205,000,  Total Project Cost: $2,251,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8922,  Location: 0.2 MI N CO RD 1469 (Lat: 34.845903,  Lng: -86.459408),  Route carried "on" structure: County highway 305,  Year Built: 1965,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 4,000 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,274 (year 2035),  Design Load: H 15,  Features Intersected: LAWLER BRANCH,  Facility Carried by Structure: WINCHESTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 20.2m (66.3ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $510,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $561,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9819,  Location: 0.4 MI S CO RD 1453 (Lat: 34.875656,  Lng: -86.450142),  Route carried "on" structure: County highway 305,  Year Built: 1968,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,900 (year 1990),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,710 (year 2035),  Design Load: H 15,  Features Intersected: RICE BRANCH,  Facility Carried by Structure: WINCHESTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 77.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $383,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $421,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9825,  Location: 1.9 MI NW OF PLEVNA (Lat: 34.985344,  Lng: -86.428564),  Route carried "on" structure: County highway 483,  Year Built: 1968,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 125 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 103 (year 2035),  Design Load: H 15,  Features Intersected: JENNY RIVER,  Facility Carried by Structure: SCHOOL HOUSE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $643,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $707,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12671,  Location: 1.5 MI NW NEW MARKET (Lat: 34.917997,  Lng: -86.401222),  Route carried "on" structure: County highway 466,  Year Built: 1948,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 175 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 95 (year 2040),  Design Load: H 15,  Features Intersected: MOUNTAIN FORK CREEK,  Facility Carried by Structure: OLD MTN FORK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $448,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $493,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16104,  Location: 3.0 MI W OF PLEVNA (Lat: 34.954044,  Lng: -86.468533),  Route carried "on" structure: County highway 256,  Year Built: 1989,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 420 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 620 (year 2035),  Design Load: HS 20,  Features Intersected: SWAMP BRANCH,  Facility Carried by Structure: MINT SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $495,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $545,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16391,  Location: 0.3 MI W NEW MARKET (Lat: 34.910261,  Lng: -86.437383),  Route carried "on" structure: County highway 462,  Year Built: 1995,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 1,330 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,600 (year 2034),  Design Load: HS 20,  Features Intersected: MTN FORK CREEK,  Facility Carried by Structure: NEW MARKET RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 65.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.57m (37.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,540,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $2,794,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1872,  Location: NEW MARKET,AL???????????? (Lat: 34.914053,  Lng: -86.427556),  Route carried "on" structure: County highway 305,  Year Built: 2003,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 3,805 (year 1992),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,230 (year 2035),  Design Load: HS 20,  Features Intersected: MOUNTAIN FORK CREEK,  Facility Carried by Structure: WINCHESTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,402,000,  Roadway Improvement Cost: $240,000,  Total Project Cost: $2,642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 20702,  Location: 0.25 MI. WEST OF BUTLER (Lat: 34.961467,  Lng: -86.488492),  Route carried "on" structure: County highway 487,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 100 (year 2012),  Average Future Daily Traffic: 200 (year 2035),  Features Intersected: SWAMP BRANCH CREEK,  Facility Carried by Structure: BUDDYWILLIAMSONRD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 13.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $223,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21519,  Location: 3 mi. NE Jct.CO RD 468_ (Lat: 34.919233,  Lng: -86.358861),  Route carried "on" structure: County highway 437,  Year Built: 2019,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 74 (year 2003),  Average Future Daily Traffic: 100 (year 2041),  Design Load: HS 20,  Features Intersected: Hurricane Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $296,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other
Discuss New Market, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.