Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New Hampton, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 135ft / 40.8mTotal length
  • $34,562,000Total costs
  • 104,037Total average daily traffic
  • 8,898Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New Hampton
  • No street view available for this location

New bridges in New Hampton, NH - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 101960-1969
  • 21990-1999
Reconstructed bridges in New Hampton, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 41990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in New Hampton, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 80.0%Good
  • 10.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 10.0%Very good
  • 50.0%Good
  • 30.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 90.0%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 66.7%Good
Find on map >>   Show street view

Structure Number: 184003100032,  Location: 0.13 MI FR BLAKE HILL RD (Lat: 43.546125,  Lng: -71.701139),  Route carried "on" structure: Other road ,  Year Built: 1920,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 81 (year 2020),  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: PRESCOTT BROOK,  Facility Carried by Structure: COOLIDGE WOODS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.420,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 184005500074,  Location: 85 FEET FR BROOK ROAD (Lat: 43.579203,  Lng: -71.714469),  Route carried "on" structure: Other road ,  Year Built: 1940,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 81 (year 2020),  Average Future Daily Traffic: 119 (year 2042),  Design Load: HL 93,  Features Intersected: BLAKE BROOK,  Facility Carried by Structure: COOLIDGE WOODS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.954,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.1m (26.6ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.84m (2.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 184006600061,  Location: 0.8 MI FR OLD BRISTOL RD (Lat: 43.579464,  Lng: -71.695294),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 126 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 186 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: BLAKE BROOK,  Facility Carried by Structure: BLAKE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.089,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 71.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 184013400051,  Location: 1.1 MI MEREDITH TL (Lat: 43.607508,  Lng: -71.639211),  Route carried "on" structure: Other road ,  Year Built: 1963,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 126 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 186 (year 2042),  Design Load: H 20,  Features Intersected: I-93,  Facility Carried by Structure: PINNACLE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.671,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18401370006,  Location: 1.05 MI N MERIDITH T.L. (Lat: 43.613211,  Lng: -71.642575),  Route carried "on" structure: Interstate 93,  Year Built: 1963,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 17,342 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,666 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NH104,NH132
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 100.764,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 18401380006,  Location: 1.1 MI MEREDITH TL (Lat: 43.613453,  Lng: -71.642119),  Route carried "on" structure: Interstate 93,  Year Built: 1963,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 12,484 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 18,476 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NH104,NH132
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.223,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 184014700082,  Location: 3.0 MI FROM MEREDITH TL (Lat: 43.633019,  Lng: -71.652772),  Route carried "on" structure: Interstate 93,  Year Built: 1963,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 9,522 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,092 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NH132
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.384,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 184014800081,  Location: 3.0 MI FROM MEREDITH TL (Lat: 43.632578,  Lng: -71.652353),  Route carried "on" structure: Interstate 93,  Year Built: 1963,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 9,519 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,088 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NH132
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 113.534,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 184018600118,  Location: 5.2 MI MEREDITH TL (Lat: 43.663819,  Lng: -71.649236),  Route carried "on" structure: Interstate 93,  Year Built: 1964,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 9,519 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,088 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NH132
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 117.109,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 184018600119,  Location: 5.2 MI MEREDITH TL (Lat: 43.663589,  Lng: -71.649733),  Route carried "on" structure: Interstate 93,  Year Built: 1964,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 9,522 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,092 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NH132
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.879,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 184022300117,  Location: 450 FEET FR WINONA ROAD (Lat: 43.685378,  Lng: -71.618483),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 415 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 614 (year 2042),  Features Intersected: NHRR,  Facility Carried by Structure: DANA HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.596,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 184013400051,  Location: 1.1 MI MEREDITH TL (Lat: 43.607508,  Lng: -71.639211),  Route carried "under" structure: Interstate 93,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2014),  Truck Traffic: 9%,  Features Intersected: I-93,  Facility Carried by Structure: PINNACLE HILL ROAD
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 18401380006,  Location: 1.1 MI MEREDITH TL (Lat: 43.613453,  Lng: -71.642119),  Route carried "under" structure: State highway 104,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,900 (year 2015),  Truck Traffic: 5%,  Features Intersected: NH104,NH132,  Facility Carried by Structure: I-93 NB
Minimum Vertical Clearance: 4.89m (16.04ft),  Kilometerpoint: 1.588,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 184018600118,  Location: 5.2 MI MEREDITH TL (Lat: 43.663819,  Lng: -71.649236),  Route carried "under" structure: State highway 132,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 1,400 (year 2015),  Truck Traffic: 5%,  Features Intersected: NH132,  Facility Carried by Structure: I-93 NB
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 2.500,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Discuss New Hampton, New Hampshire (NH) on our hugely popular New Hampshire forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.