Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Moorhead, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 289ft / 87.8mTotal length
  • $2,232,776,000Total costs
  • 30,140Total average daily traffic
  • 3,816Total average daily truck traffic
  • 32,020Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Moorhead
  • No street view available for this location

New bridges in Moorhead, MS - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 61940-1949
  • 21950-1959
  • 11960-1969
  • 91970-1979
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Moorhead, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Very good
  • 28.6%Good
  • 14.3%Satisfactory
  • 7.1%Fair
  • 21.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Very good
  • 21.4%Good
  • 14.3%Satisfactory
  • 7.1%Fair
  • 28.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 21.4%Good
  • 28.6%Satisfactory
  • 14.3%Poor
  • 21.4%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 42.9%Very good
  • 38.1%Good
  • 9.5%Satisfactory
  • 9.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Very good
  • 85.7%Good
Find on map >>   Show street view

Structure Number: 21000820670383A,  Location: 3.9 MI E US 49W (Lat: 33.462336,  Lng: -90.561894),  Route carried "on" structure: US 82,  Year Built: 1933,  Status: Open,  Structure Length: 12.01m (39.40ft),  Average Daily Traffic: 3,700 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 3,950 (year 2040),  Design Load: H 15,  Features Intersected: SUNFLOWER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.147,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 8,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.01m (39.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 30 months,  Inspection Date: May 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $459,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $882,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21000820670383B,  Location: 3.9 MI E US 49W (Lat: 33.462175,  Lng: -90.563214),  Route carried "on" structure: US 82,  Year Built: 1976,  Status: Open,  Structure Length: 12.65m (41.50ft),  Average Daily Traffic: 3,700 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 3,950 (year 2040),  Design Load: HS 20,  Features Intersected: SUNFLOWER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.167,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 8,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: October 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21000820670408,  Location: 6.4 MI E US 49W (Lat: 33.461764,  Lng: -90.518719),  Route carried "on" structure: US 82,  Year Built: 1978,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 7,400 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 7,900 (year 2040),  Design Load: HS 20,  Features Intersected: MOOREHEAD BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.302,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 8,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 32.9m (107.9ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Very good,  Culverts: Good,  Inventory Rating: 88.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 31000030670885,  Location: 4.2 MI N US 49W (Lat: 33.414447,  Lng: -90.545903),  Route carried "on" structure: State highway 3,  Year Built: 1949,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 990 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 990 (year 2040),  Design Load: H 15,  Features Intersected: DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.191,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 31000030670907,  Location: 6.5 MI N US 49W (Lat: 33.433506,  Lng: -90.515006),  Route carried "on" structure: State highway 3,  Year Built: 1949,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 990 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 990 (year 2040),  Design Load: H 15,  Features Intersected: DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.759,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 3100003067092,  Location: 0.9 MI S US 82 (Lat: 33.447881,  Lng: -90.505397),  Route carried "on" structure: State highway 3,  Year Built: 1951,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 2,200 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,200 (year 2040),  Design Load: HS 15,  Features Intersected: MOORHEAD BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.766,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $95,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $360,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31000030670928,  Location: 0.2 MI S US 82 (Lat: 33.458161,  Lng: -90.506828),  Route carried "on" structure: State highway 3,  Year Built: 1947,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 5,200 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,200 (year 2040),  Design Load: H 15,  Features Intersected: CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.923,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 31000030670941,  Location: 1.0 MI N US 82 (Lat: 33.476236,  Lng: -90.514261),  Route carried "on" structure: State highway 3,  Year Built: 1947,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: H 15,  Features Intersected: CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.049,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 3100003067095,  Location: 1.9 MI N US 82 (Lat: 33.488467,  Lng: -90.518592),  Route carried "on" structure: State highway 3,  Year Built: 1947,  Status: Posted for load,  Structure Length: 13.44m (44.09ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: HS 15,  Features Intersected: QUIVER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.465,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 13.44m (44.09ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $522,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $985,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000030670955,  Location: 2.4 MI N US 82 (Lat: 33.495308,  Lng: -90.521017),  Route carried "on" structure: State highway 3,  Year Built: 1947,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: H 15,  Features Intersected: ROUNDAWAY BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.257,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: SA4200000000019,  Location: SEC_ 6_T18N_R 2W B (Lat: 33.452250,  Lng: -90.452556),  Route carried "on" structure: County highway 547,  Year Built: 1958,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 80 (year 2015),  Average Future Daily Traffic: 120 (year 2035),  Design Load: H 15,  Features Intersected: UNNAMED STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $230,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA6700000000027,  Location: SEC 4 T18N R 3W B (Lat: 33.450278,  Lng: -90.509167),  Route carried "on" structure: County highway 138,  Year Built: 1986,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 1,200 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,800 (year 2030),  Design Load: H 15,  Features Intersected: MOORHEAD BAYOU,  Facility Carried by Structure: WASHINGTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.713,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $639,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA6700000000028,  Location: SEC 4 T18N R 3W (Lat: 33.458056,  Lng: -90.507778),  Route carried "on" structure: County highway 432,  Year Built: 1976,  Status: Temporarily open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 60 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 90 (year 2033),  Design Load: H 15,  Features Intersected: MOORHEAD BAYOU,  Facility Carried by Structure: EAST DELTA AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.804,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Wood or Timber,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.96m (9.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $440,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA6700000000029,  Location: SEC 9 T18N R 3W (Lat: 33.446667,  Lng: -90.522778),  Route carried "on" structure: County highway 179,  Year Built: 1975,  Status: Temporarily open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 40 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 60 (year 2033),  Design Load: H 15,  Features Intersected: WIXON SLOUGH,  Facility Carried by Structure: S. SHEFFIELD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.471,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Critical,  Channel: Good,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $48,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $71,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA6700000000031,  Location: SEC 10 T18N R 3W (Lat: 33.447881,  Lng: -90.503958),  Route carried "on" structure: County highway 852,  Year Built: 1997,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 150 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 225 (year 2030),  Features Intersected: MOORHEAD BAYOU,  Facility Carried by Structure: JOHNNY RUSSELL DR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: SA6700000000032,  Location: SEC 14 T18N R 3W (Lat: 33.421944,  Lng: -90.478889),  Route carried "on" structure: County highway 196,  Year Built: 1969,  Status: Temporarily open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 40 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 60 (year 2033),  Design Load: H 15,  Features Intersected: DRAINAGE CANAL,  Facility Carried by Structure: HOBBS BRICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.379,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Critical,  Channel: Good,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $52,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $76,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA6700000000033,  Location: SEC 24 T18N R 3W B (Lat: 33.409969,  Lng: -90.457786),  Route carried "on" structure: County highway 12,  Year Built: 1978,  Status: Closed,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 30 (year 2013),  Average Future Daily Traffic: 45 (year 2033),  Design Load: H 15,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: MCCOY LAKE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Critical,  Channel: Good,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $72,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $105,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA6700000000058,  Location: SEC 23 T19N R 3W (Lat: 33.496389,  Lng: -90.487778),  Route carried "on" structure: County highway 205,  Year Built: 1975,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 40 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 60 (year 2030),  Design Load: HS 20,  Features Intersected: QUIVER RIVER,  Facility Carried by Structure: PREACHERS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.40m (43.96ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $1,540,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,640,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA6700000000059,  Location: SEC 32 T19N R 3W (Lat: 33.476389,  Lng: -90.522500),  Route carried "on" structure: County highway 179,  Year Built: 1970,  Status: Temporarily open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 30 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 45 (year 2033),  Design Load: H 15,  Features Intersected: DRAINAGE CANAL,  Facility Carried by Structure: NORTH SHEFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.851,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $602,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $702,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: SA670000000006,  Location: SEC 33 T19N R 3W (Lat: 33.463867,  Lng: -90.522453),  Route carried "on" structure: County highway 179,  Year Built: 1978,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 50 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 75 (year 2033),  Design Load: H 15,  Features Intersected: MOORHEAD BAYOU,  Facility Carried by Structure: NORTH SHEFFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.402,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $163,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA6700000000065,  Location: SEC 25 T19N R 4W (Lat: 33.468086,  Lng: -90.564850),  Route carried "on" structure: County highway 172,  Year Built: 1974,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 40 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 60 (year 2030),  Design Load: HS 20,  Features Intersected: QUIVER RIVER,  Facility Carried by Structure: NORTH NOBILE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.00m (36.09ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $1,260,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,360,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Moorhead, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.