Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Monticello, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 259ft / 79.5mTotal length
  • $322,000Total costs
  • 83,574Total average daily traffic
  • 18,907Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Monticello
  • No street view available for this location

New bridges in Monticello, FL - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 41950-1959
  • 21960-1969
  • 81970-1979
  • 11990-1999
  • 12000-2009
  • 22020-2022
Average Bridge Daily Traffic in Monticello, FL
Average Bridge Truck Traffic in Monticello, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 58.3%Good
  • 25.0%Satisfactory
  • 8.3%Fair
  • 8.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 58.3%Good
  • 25.0%Fair
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Very good
  • 54.5%Good
  • 27.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 540005,  Location: 3.9 mi EAST OF US19, SR57 (Lat: 30.531544,  Lng: -83.812581),  Route carried "on" structure: US 90,  Year Built: 1947,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 2,600 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,511 (year 2042),  Design Load: HS 20,  Features Intersected: Wolf Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.914,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Underwater Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 540008,  Location: 3.4 Mi South of US90 (Lat: 30.496217,  Lng: -83.880561),  Route carried "on" structure: US 19,  Year Built: 1962,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 2,950 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,118 (year 2042),  Design Load: HS 20,  Features Intersected: FG&A RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.070,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540021,  Location: 4.7 Miles S OF US90(SR10) (Lat: 30.475639,  Lng: -83.889625),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 7.42m (24.34ft),  Average Daily Traffic: 12,250 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 21,254 (year 2042),  Design Load: HS 20,  Features Intersected: US19 SR57
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 14.922,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $161,000,  Total Project Cost: $161,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540025,  Location: 2.4 Mi North of US90/SR10 (Lat: 30.557689,  Lng: -83.823578),  Route carried "on" structure: County highway 146,  Year Built: 1951,  Status: Posted for load,  Structure Length: 3.06m (10.04ft),  Average Daily Traffic: 2,000 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,200 (year 2039),  Design Load: HS 15,  Features Intersected: Wolf Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.7m (25.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540027,  Location: 1.8 Mi West of US19/SR 57 (Lat: 30.510250,  Lng: -83.899269),  Route carried "on" structure: County highway 259,  Year Built: 1956,  Status: Posted for load,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,530 (year 2040),  Features Intersected: Abandoned Scl Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.606,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540048,  Location: 1.5 Mi North of I10 SR8 (Lat: 30.496172,  Lng: -83.880342),  Route carried "on" structure: US 19,  Year Built: 1951,  Status: Open,  Structure Length: 9.39m (30.81ft),  Average Daily Traffic: 2,950 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,118 (year 2042),  Design Load: H 15,  Features Intersected: FG&A RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.068,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540052,  Location: 4.7 mile S of US90/SR10 (Lat: 30.475408,  Lng: -83.889731),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 7.42m (24.34ft),  Average Daily Traffic: 12,250 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 21,254 (year 2042),  Design Load: HS 20,  Features Intersected: US19 SR57
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.922,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 81.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $161,000,  Total Project Cost: $161,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540053,  Location: 2.2 M. East of US19 SR57 (Lat: 30.472906,  Lng: -83.853264),  Route carried "on" structure: Interstate 10,  Year Built: 1973,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 10,250 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 17,784 (year 2042),  Design Load: HS 20,  Features Intersected: Abandon Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.466,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540055,  Location: 4 Miles N OF MONTICELLO (Lat: 30.600111,  Lng: -83.871194),  Route carried "on" structure: US 19,  Year Built: 1954,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 3,900 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 6,766 (year 2042),  Design Load: H 15,  Features Intersected: Ward Creek Trib 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.844,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.5m (57.4ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 540059,  Location: 0.9 Mi West of US19/SR57 (Lat: 30.570306,  Lng: -83.880444),  Route carried "on" structure: County highway 259,  Year Built: 1960,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 440 (year 2039),  Design Load: HS 20,  Features Intersected: Unnamed Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.146,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 540062,  Location: 3.5 Mi West of US19/SR57 (Lat: 30.489225,  Lng: -83.914906),  Route carried "on" structure: County highway 259,  Year Built: 1977,  Status: Open,  Structure Length: 5.53m (18.14ft),  Average Daily Traffic: 1,600 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,776 (year 2042),  Design Load: HS 20,  Features Intersected: SCL Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.823,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.2m (69.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Serious,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: August 2020,  Other Special Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540074,  Location: 2.0 Miles W of Monticello (Lat: 30.542497,  Lng: -83.904319),  Route carried "on" structure: US 90,  Year Built: 1996,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 4,600 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,981 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: No Name Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.449,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5402,  Location: 4.1Mi east of SR57 US19 (Lat: 30.531528,  Lng: -83.808500),  Route carried "on" structure: US 90,  Year Built: 2021,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 2,600 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,511 (year 2040),  Design Load: HL 93,  Features Intersected: Stream
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.311,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 62.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 540941,  Location: 2.2 M. East of US19 SR57 (Lat: 30.473147,  Lng: -83.853275),  Route carried "on" structure: Interstate 10,  Year Built: 1973,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 10,250 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 17,784 (year 2042),  Design Load: HS 20,  Features Intersected: Abandon Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.466,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 544035,  Location: 1.36 Miles West of CR259 (Lat: 30.563064,  Lng: -83.896706),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 220 (year 2039),  Features Intersected: Unnamed Branch,  Facility Carried by Structure: CR 3-W Lake Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.176,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 36.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 544081,  Location: 2.2 Miles South of CR 142 (Lat: 30.564097,  Lng: -83.908969),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 14.72m (48.29ft),  Average Daily Traffic: 650 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 715 (year 2039),  Design Load: HL 93,  Features Intersected: Ward Creek,  Facility Carried by Structure: West Lake Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.389,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54409,  Location: 0.33MI S Drifton-Aucilla (Lat: 30.487000,  Lng: -83.856444),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 24 (year 2018),  Average Future Daily Traffic: 26 (year 2038),  Design Load: HL 93,  Features Intersected: Buggs Creek,  Facility Carried by Structure: Curtis Mill Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.643,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.5m (8.2ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 540021,  Location: 4.7 Miles S OF US90(SR10) (Lat: 30.475639,  Lng: -83.889625),  Route carried "under" structure: US 19,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 5,900 (year 2020),  Truck Traffic: 17%,  Features Intersected: US19 SR57,  Facility Carried by Structure: I10 SR8
Minimum Vertical Clearance: 4.58m (15.03ft),  Kilometerpoint: 7.659,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 540052,  Location: 4.7 mile S of US90/SR10 (Lat: 30.475408,  Lng: -83.889731),  Route carried "under" structure: US 19,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 5,900 (year 2020),  Truck Traffic: 17%,  Features Intersected: US19 SR57,  Facility Carried by Structure: I10 SR8
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 7.630,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Discuss Monticello, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.