  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 210ft / 63.8mTotal length
  • $25,424,000Total costs
  • 65,628Total average daily traffic
  • 10,785Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Montevallo
  • No street view available for this location

New bridges in Montevallo, AL - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11940-1949
  • 11950-1959
  • 21960-1969
  • 31980-1989
  • 81990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Daily Traffic in Montevallo, AL
Average Bridge Truck Traffic in Montevallo, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 27.3%Very good
  • 27.3%Good
  • 36.4%Satisfactory
  • 9.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Very good
  • 18.2%Good
  • 54.5%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Very good
  • 36.4%Good
  • 36.4%Satisfactory
  • 9.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 50.0%Good
  • 36.4%Satisfactory
  • 4.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 81.8%Good
  • 18.2%Satisfactory
Find on map >>   Show street view

Structure Number: 1008,  Location: MONTEVALLO (Lat: 33.094667,  Lng: -86.856950),  Route carried "on" structure: State highway 155,  Year Built: 1936,  Status: Open,  Structure Length: 18.89m (61.98ft),  Average Daily Traffic: 6,370 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 7,773 (year 2042),  Design Load: H 15,  Features Intersected: SOURR*SPRING CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.715,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 19.52m (64.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $3,613,000,  Roadway Improvement Cost: $361,000,  Total Project Cost: $3,974,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1463,  Location: 0.2 MI N DEKALB CO LINE (Lat: 34.583147,  Lng: -85.855903),  Route carried "on" structure: County highway 59,  Year Built: 1936,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 500 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 632 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $341,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $375,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3128,  Location: 1.0 MI N OF MONTEVALLO (Lat: 33.123483,  Lng: -86.844667),  Route carried "on" structure: State highway 119,  Year Built: 1947,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 8,710 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,434 (year 2041),  Design Load: H 15,  Features Intersected: SHOAL CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.355,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $733,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $806,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5517,  Location: 0.5 MI. E JCT. CO. 17 (Lat: 33.149867,  Lng: -86.847375),  Route carried "on" structure: County highway 22,  Year Built: 1956,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,228 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 3,229 (year 2040),  Design Load: H 20,  Features Intersected: SHOAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $493,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $542,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14542,  Location: 0.5 MI. S. DOGWOOD (Lat: 33.139531,  Lng: -86.875911),  Route carried "on" structure: County highway 17,  Year Built: 1988,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,545 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,165 (year 2040),  Design Load: HS 20,  Features Intersected: KING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $460,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $506,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1462,  Location: 1.1 MI. EAST OF US 231 (Lat: 32.157339,  Lng: -86.093997),  Route carried "on" structure: County highway 70,  Year Built: 1988,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 75 (year 1988),  Average Future Daily Traffic: 100 (year 2040),  Design Load: HS 20,  Features Intersected: DRY CREEK RELIEF,  Facility Carried by Structure: CANTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $506,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $557,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 1464,  Location: 0.8 MI S OF AL-74 (Lat: 34.155556,  Lng: -88.059861),  Route carried "on" structure: Interstate 22,  Year Built: 1988,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 11,490 (year 2013),  Truck Traffic: 38%,  Average Future Daily Traffic: 15,567 (year 2040),  Design Load: HS 20,  Features Intersected: Trib. of Watts Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.839,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.0m (78.7ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $4,766,000,  Roadway Improvement Cost: $477,000,  Total Project Cost: $5,243,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1501,  Location: .1 MI N JCT CO RD 12 (Lat: 33.123739,  Lng: -86.815617),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 82 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 112 (year 2040),  Features Intersected: SPRING CREEK,  Facility Carried by Structure: SPR CR CEMETARY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 10.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $235,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $259,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 15034,  Location: CR54 4 M NW DRY VALLEY CH (Lat: 33.062258,  Lng: -86.837042),  Route carried "on" structure: County highway ,  Year Built: 1969,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 400 (year 1990),  Truck Traffic: 1%,  Average Future Daily Traffic: 425 (year 2030),  Design Load: HS 20,  Features Intersected: BRANCH OF DRY CREEK,  Facility Carried by Structure: CR54 CP 1-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $403,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15159,  Location: .1 MI. N. JCT.CO.16 (Lat: 33.128500,  Lng: -86.809083),  Route carried "on" structure: County highway 16,  Year Built: 1990,  Status: Posted for load,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 549 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,367 (year 2040),  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $427,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $470,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15617,  Location: 0.5M. W. JCT. CO. 12 (Lat: 33.165656,  Lng: -86.810956),  Route carried "on" structure: County highway 24,  Year Built: 1992,  Status: Closed,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,540 (year 2040),  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: May 2020,  Underwater Inspection Date: August 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $346,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $381,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15618,  Location: .1M. W. JCT. CO. HWY. 10 (Lat: 33.105497,  Lng: -86.871536),  Route carried "on" structure: County highway 204,  Year Built: 1992,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 640 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,367 (year 2040),  Design Load: HS 20,  Features Intersected: KING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $885,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $974,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16441,  Location: 0.3 MI W MONTEVALLO (Lat: 33.106764,  Lng: -86.873453),  Route carried "on" structure: County highway 10,  Year Built: 1996,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,545 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 2,165 (year 2040),  Design Load: HS 20,  Features Intersected: KING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $459,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $505,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16442,  Location: 1.3 MI W MONTEVALLO (Lat: 33.107564,  Lng: -86.885239),  Route carried "on" structure: County highway 10,  Year Built: 1994,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,545 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 2,165 (year 2040),  Design Load: HS 20,  Features Intersected: DAVIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $524,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $576,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16448,  Location: MORGAN ST * SHOAL CK (Lat: 33.083333,  Lng: -86.883333),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,200 (year 2040),  Design Load: H 20,  Features Intersected: SHOAL CREEK,  Facility Carried by Structure: MORGAN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.14m (23.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,517,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,669,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16449,  Location: SHOAL CK * OVERLAND RD (Lat: 33.083333,  Lng: -86.883333),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 3,000 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,200 (year 2040),  Design Load: H 20,  Features Intersected: SHOAL CREEK,  Facility Carried by Structure: OVERLAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 86.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.34m (10.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $596,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $656,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17284,  Location: .03 KM S. JCT.CO. RD. 10 (Lat: 33.107700,  Lng: -86.876000),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 25 (year 2020),  Average Future Daily Traffic: 35 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH CREEK,  Facility Carried by Structure: TOLBERT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.6m (5.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $332,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18591,  Location: MONTEVALLO (Lat: 33.098839,  Lng: -86.864986),  Route carried "on" structure: State highway 119,  Year Built: 2005,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 7,440 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,767 (year 2041),  Design Load: HS 20,  Features Intersected: SHOAL CREEK
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 83.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,317,000,  Roadway Improvement Cost: $332,000,  Total Project Cost: $3,649,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18953,  Location: 1.1 MI. NO. CR 22 (Lat: 33.166347,  Lng: -86.861525),  Route carried "on" structure: County highway 17,  Year Built: 2005,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 3,736 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 5,231 (year 2041),  Design Load: HS 20,  Features Intersected: CUNNINGHAM BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.5m (8.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $367,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $404,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18954,  Location: 0.3 MI. NO. CR 22 (Lat: 33.154869,  Lng: -86.860014),  Route carried "on" structure: County highway 17,  Year Built: 2005,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 3,736 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 5,231 (year 2041),  Design Load: HS 20,  Features Intersected: WOODS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.75m (5.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $607,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $668,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19937,  Location: 0.3 MI WEST OF AL 119 (Lat: 33.151494,  Lng: -86.828564),  Route carried "on" structure: County highway 22,  Year Built: 2007,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 2,000 (year 2021),  Average Future Daily Traffic: 2,800 (year 2041),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.6m (5.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $413,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $454,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20466,  Location: 1.5 MI EAST AL 25 (Lat: 33.105067,  Lng: -86.838150),  Route carried "on" structure: County highway 12,  Year Built: 2014,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 4,182 (year 2021),  Average Future Daily Traffic: 6,233 (year 2041),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 6.46m (21.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,837,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $2,021,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1008,  Location: MONTEVALLO (Lat: 33.094667,  Lng: -86.856950),  Route carried "under" structure: State highway ,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 2,330 (year 2022),  Truck Traffic: 7%,  Features Intersected: SOURR*SPRING CREEK RD,  Facility Carried by Structure: AL - 155
Minimum Vertical Clearance: 7.52m (24.67ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)