Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Montecito, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 121ft / 36.9mTotal length
  • $745,000Total costs
  • 474,977Total average daily traffic
  • 26,689Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Montecito
  • No street view available for this location

New bridges in Montecito, CA - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 11940-1949
  • 91950-1959
  • 61960-1969
  • 21970-1979
  • 11980-1989
  • 32000-2009
  • 12010-2019
  • 22020-2022
Reconstructed bridges in Montecito, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Montecito, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 56.5%Good
  • 4.3%Satisfactory
  • 30.4%Fair
  • 4.3%Poor
  • 4.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 52.2%Good
  • 13.0%Satisfactory
  • 26.1%Fair
  • 4.3%Poor
  • 4.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 69.6%Good
  • 17.4%Fair
  • 13.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 23.8%Excellent
  • 9.5%Very good
  • 33.3%Good
  • 28.6%Satisfactory
  • 4.8%Fair
Find on map >>   Show street view

Structure Number: 51 0042,  Location: 05-SB-192-10.53 (Lat: 34.437047,  Lng: -119.605908),  Route carried "on" structure: State highway 192,  Year Built: 1968,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 3,100 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,916 (year 2036),  Design Load: HS 20,  Features Intersected: BUENA VISTA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.530,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51 0047,  Location: 05-SB-101-9.56 (Lat: 34.420978,  Lng: -119.623725),  Route carried "on" structure: US 101,  Year Built: 1915,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 76,000 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 107,011 (year 2042),  Features Intersected: SAN YSIDRO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.560,  Lanes on structure: 5,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 24.0m (78.7ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 24.0m (78.7ft),  Out-to-Out Width: 32.2m (105.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 51 0053,  Location: 05-SB-101-9.34 (Lat: 34.421225,  Lng: -119.619844),  Route carried "on" structure: US 101,  Year Built: 1915,  Year Reconstructed: 1926,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 76,000 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 107,011 (year 2042),  Design Load: HS 15,  Features Intersected: ROMERO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.340,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 35 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 29.1m (95.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 51 0109,  Location: 05-SB-192-R9.68 (Lat: 34.439344,  Lng: -119.620419),  Route carried "on" structure: State highway 192,  Year Built: 1965,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,100 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,055 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: SAN YSIDRO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.680,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51 0185,  Location: 05-SB-101-10.02 (Lat: 34.422253,  Lng: -119.631469),  Route carried "on" structure: ServiceCity street H118,  Year Built: 1956,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 11,000 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 22,847 (year 2036),  Design Load: HS 20,  Features Intersected: US HIGHWAY 101,  Facility Carried by Structure: SAN YSIDRO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 85.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51 0186K,  Location: 05-SB-101-10.49 (Lat: 34.421219,  Lng: -119.638936),  Route carried "on" structure: Ramp US 101,  Year Built: 1956,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 6,402 (year 2010),  Truck Traffic: 8%,  Average Future Daily Traffic: 20,403 (year 2040),  Design Load: HS 20,  Features Intersected: US HIGHWAY 101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.490,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51 0187,  Location: 05-SB-101-10.18 (Lat: 34.422811,  Lng: -119.634575),  Route carried "on" structure: US 101,  Year Built: 1956,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 76,000 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 107,011 (year 2042),  Design Load: HS 20,  Features Intersected: MONTECITO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.180,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 58.0m (190.3ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 58.0m (190.3ft),  Out-to-Out Width: 102.9m (337.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 87.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2020
Find on map >>   Show street view

Structure Number: 51 0189R,  Location: 05-SB-101-9.00 (Lat: 34.421881,  Lng: -119.614017),  Route carried "on" structure: US 101,  Year Built: 1959,  Status: Open,  Structure Length: 3.18m (10.43ft),  Average Daily Traffic: 38,000 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 53,506 (year 2042),  Design Load: HS 20,  Features Intersected: SHEFFIELD DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Poor,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.18m (10.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $777,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51 0355,  Location: 05-SB-192-8.12 (Lat: 34.435892,  Lng: -119.644208),  Route carried "on" structure: State highway 192,  Year Built: 2020,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 3,100 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,055 (year 2042),  Design Load: HL 93,  Features Intersected: MONTECITO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.120,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 51 0357,  Location: 05-SB-192-10.96 (Lat: 34.436078,  Lng: -119.597578),  Route carried "on" structure: State highway 192,  Year Built: 2019,  Status: Open,  Structure Length: 1.72m (5.64ft),  Average Daily Traffic: 3,100 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,032 (year 2041),  Design Load: HL 93,  Features Intersected: ROMERO CANYON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.960,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.6m (54.5ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 51C0041,  Location: 0.65 MI N OF US 101 (Lat: 34.430497,  Lng: -119.641214),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 7,556 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 20,393 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MONTECITO CREEK,  Facility Carried by Structure: HOT SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 88.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C0047,  Location: 0.3 MI E OF SANTA ROSA LN (Lat: 34.425278,  Lng: -119.621372),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,110 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,308 (year 2041),  Features Intersected: SAN YSIDRO CREEK,  Facility Carried by Structure: SAN LEANDRO LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 51C0049,  Location: 0.3 MI N SAN LEANDRO LANE (Lat: 34.426628,  Lng: -119.609881),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 4,330 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,907 (year 2043),  Design Load: HS 20,  Features Intersected: BUENA VISTA CREEK,  Facility Carried by Structure: SHEFFIELD DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 51C0137,  Location: S OF US 101 AT MONTECITO (Lat: 34.420453,  Lng: -119.620908),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Temporarily open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 200 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 212 (year 2043),  Features Intersected: ROMERO CREEK,  Facility Carried by Structure: FERNALD PT LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Poor,  Channel: Good,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $257,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $432,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C0138,  Location: S OF US 101 AT MONTECITO (Lat: 34.420219,  Lng: -119.623997),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 400 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 436 (year 2041),  Features Intersected: SAN YSIDRO CREEK,  Facility Carried by Structure: FERNALD PT LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C02,  Location: NORTH TOLLIS AVE (Lat: 34.442339,  Lng: -119.608353),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 422 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,339 (year 2044),  Design Load: HS 20,  Features Intersected: BUENA VISTA CREEK,  Facility Carried by Structure: LILAC LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $72,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $120,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C0203,  Location: AT RIVEN ROCK RD (Lat: 34.449108,  Lng: -119.646258),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 588 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,636 (year 2041),  Design Load: HS 20,  Features Intersected: HOT SPRINGS CREEK,  Facility Carried by Structure: MOUNTAIN DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $115,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $193,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C0204,  Location: 0.17 MI N OF E VALLEY RD (Lat: 34.439569,  Lng: -119.606808),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 422 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 541 (year 2043),  Design Load: HS 20,  Features Intersected: BUENA VISTA CREEK,  Facility Carried by Structure: OAK GROVE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C0236,  Location: BET OAK DR AND LILAC DR (Lat: 34.440492,  Lng: -119.607333),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 422 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 226 (year 2044),  Design Load: HS 20,  Features Intersected: BUENA VISTA CREEK,  Facility Carried by Structure: ALISOS DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 82.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C0241,  Location: 0.1 MI E OF SAN YSIDRO RD (Lat: 34.428758,  Lng: -119.629911),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 426 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,199 (year 2041),  Design Load: HS 20,  Features Intersected: OAK CREEK,  Facility Carried by Structure: SINALOA DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Excellent,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 51C0341,  Location: 0.7 MI E SAN YSIDRO RD (Lat: 34.421258,  Lng: -119.619944),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 2.70m (8.86ft),  Average Daily Traffic: 3,448 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,692 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: ROMERO CREEK,  Facility Carried by Structure: N JAMESON LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.6m (31.5ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.5m (83.7ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Excellent,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 51C0342,  Location: 0.45 MI E SAN YSIDRO RD (Lat: 34.421028,  Lng: -119.623811),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 2.45m (8.04ft),  Average Daily Traffic: 3,448 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,692 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: SAN YSIDRO CREEK,  Facility Carried by Structure: N JAMESON LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.6m (31.5ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.0m (75.5ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Excellent,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 51C0343,  Location: 0.35 MI E SAN YSIDRO RD (Lat: 34.421117,  Lng: -119.625650),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.72m (5.64ft),  Average Daily Traffic: 2,372 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,760 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: OAK CREEK,  Facility Carried by Structure: N JAMESON LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.6m (31.5ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.7m (51.5ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Excellent,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 51C0392,  Location: 0.6 MI NE OF VALLEY ROAD (Lat: 34.445994,  Lng: -119.651231),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 531 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 875 (year 2042),  Design Load: HL 93,  Features Intersected: COLD SPRINGS CREEK,  Facility Carried by Structure: ASHLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 51 0185,  Location: 05-SB-101-10.02 (Lat: 34.422253,  Lng: -119.631469),  Route carried "under" structure: US 101,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2009),  Truck Traffic: 6%,  Features Intersected: US HIGHWAY 101,  Facility Carried by Structure: SAN YSIDRO ROAD
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 10.020,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 51 0186K,  Location: 05-SB-101-10.49 (Lat: 34.421219,  Lng: -119.638936),  Route carried "under" structure: US 101,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2009),  Truck Traffic: 6%,  Features Intersected: US HIGHWAY 101
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 10.490,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 51 0189R,  Location: 05-SB-101-9.00 (Lat: 34.421881,  Lng: -119.614017),  Route carried "under" structure: County highway ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2010),  Truck Traffic: 5%,  Features Intersected: SHEFFIELD DRIVE,  Facility Carried by Structure: US HIGHWAY 101 NB
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 13.4m (44.0ft)

Discuss Montecito, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.