Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mineralwells, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 269ft / 82.1mTotal length
  • $18,896,000Total costs
  • 113,386Total average daily traffic
  • 16,391Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mineralwells
  • No street view available for this location

New bridges in Mineralwells, WV - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 51960-1969
  • 11980-1989
  • 71990-1999
  • 22000-2009
  • 52010-2019
Average Bridge Daily Traffic in Mineralwells, WV
Average Bridge Truck Traffic in Mineralwells, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 52.6%Good
  • 5.3%Satisfactory
  • 31.6%Fair
  • 10.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 65.0%Good
  • 5.0%Satisfactory
  • 15.0%Fair
  • 15.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 60.0%Good
  • 15.0%Satisfactory
  • 20.0%Fair
  • 5.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 54A029,  Location: 0.10 MI. E. OF CR. 13/1 (Lat: 39.170239,  Lng: -81.576050),  Route carried "on" structure: County highway 13,  Year Built: 1995,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 750 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 825 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BRANCH OF SAM'S CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.774,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $200,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A03,  Location: 0.12 MI. W OF CR 13/10 (Lat: 39.183400,  Lng: -81.544461),  Route carried "on" structure: County highway 13,  Year Built: 1990,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 700 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,043 (year 2039),  Design Load: HS 20,  Features Intersected: BADGLEY FK OF TYGART CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.395,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 5.4m (17.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: May 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $460,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $550,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54A033,  Location: 0.01 MI. S. OF CR. 13 (Lat: 39.167339,  Lng: -81.577919),  Route carried "on" structure: County highway 136,  Year Built: 1968,  Status: Posted for load,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 15 (year 2039),  Features Intersected: GREEN VALLEY RUN,  Facility Carried by Structure: COUNTY ROUTE 13/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.200,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $167,000,  Total Project Cost: $167,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 54A035,  Location: 0.05 M. N. OF CR 21 (Lat: 39.182100,  Lng: -81.528431),  Route carried "on" structure: County highway 1449,  Year Built: 1930,  Status: Open,  Structure Length: 2.85m (9.35ft),  Average Daily Traffic: 86 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 95 (year 2039),  Features Intersected: TYGART CREEK,  Facility Carried by Structure: CR 14/49
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $200,000,  Total Project Cost: $200,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54A059,  Location: 0.02 MI. S. OF CR. 21/21 (Lat: 39.177000,  Lng: -81.530589),  Route carried "on" structure: County highway 21,  Year Built: 1928,  Status: Posted for load,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 3,900 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,811 (year 2039),  Features Intersected: LITTLE TYGART CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.884,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.9m (52.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $900,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 54A061,  Location: 0.07 M NORTH OF CR 40/5 (Lat: 39.140550,  Lng: -81.549081),  Route carried "on" structure: County highway 2122,  Year Built: 1966,  Status: Open,  Structure Length: 9.21m (30.22ft),  Average Daily Traffic: 250 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 275 (year 2038),  Design Load: HS 20,  Features Intersected: COUNTY ROUTE 21/22,  Facility Carried by Structure: COUNTY ROUTE 21/22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.554,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.21m (30.22ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $1,500,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54A062,  Location: 0.04 MILE WEST OF CR 21 (Lat: 39.122711,  Lng: -81.543639),  Route carried "on" structure: County highway 2124,  Year Built: 1989,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 300 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 330 (year 2038),  Design Load: HS 20,  Features Intersected: TYGART CREEK,  Facility Carried by Structure: COUNTY ROUTE 21/24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.134,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $750,000 ( Estimate for 2016),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A073,  Location: 0.09 MI. E OF JCT CR 24 (Lat: 39.214511,  Lng: -81.449611),  Route carried "on" structure: County highway 26,  Year Built: 1927,  Status: Posted for load,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 70 (year 2018),  Average Future Daily Traffic: 77 (year 2038),  Features Intersected: LEFT FORK STILLWELL CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.607,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54A09,  Location: 0.15 MILE SOUTH OF CR 13 (Lat: 39.178689,  Lng: -81.545989),  Route carried "on" structure: County highway 405,  Year Built: 1956,  Year Reconstructed: 1976,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 220 (year 2038),  Features Intersected: SAMS CREEK,  Facility Carried by Structure: COUNTY ROUTE 40/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.086,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.4m (37.4ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $140,000 ( Estimate for 2017),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54A097,  Location: 0.15 M WEST OF CR 47/24 (Lat: 39.204950,  Lng: -81.470119),  Route carried "on" structure: State highway 47,  Year Built: 1946,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 8,100 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,424 (year 2038),  Features Intersected: STILLWELL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.897,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $900,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $1,200,000 ( Estimate for 2016)
Find on map >>   Show street view

Structure Number: 54A121,  Location: 4.88 MI S OF WV 14 (Lat: 39.122000,  Lng: -81.546000),  Route carried "on" structure: Interstate 77,  Year Built: 1967,  Status: Open,  Structure Length: 4.65m (15.26ft),  Average Daily Traffic: 3,850 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 5,506 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CR 21/24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 265.783,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.9m (52.2ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $950,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 54A122,  Location: 4.88 MI S OF WV 14 (Lat: 39.122000,  Lng: -81.546319),  Route carried "on" structure: Interstate 77,  Year Built: 1968,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 3,850 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 5,506 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CR 21/24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 265.783,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.8m (48.6ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $950,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 54A175,  Location: 1.66 MILE SOUTH OF WV 14 (Lat: 39.166800,  Lng: -81.540061),  Route carried "on" structure: Interstate 77,  Year Built: 1997,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 6,400 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 8,448 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: TYGART CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 270.965,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $750,000,  Total Project Cost: $750,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A176,  Location: 1.66 MILE SOUTH OF WV 14 (Lat: 39.166861,  Lng: -81.540281),  Route carried "on" structure: Interstate 77,  Year Built: 1997,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 6,400 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 8,448 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: TYGART CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 270.965,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $750,000,  Total Project Cost: $750,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A177,  Location: 0.58 MILE SOUTH OF WV 14 (Lat: 39.181631,  Lng: -81.533131),  Route carried "on" structure: Interstate 77,  Year Built: 1997,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 6,400 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 9,152 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: TYGART CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 272.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.13m (23.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $410,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A178,  Location: 0.58 MILE SOUTH OF WV 14 (Lat: 39.181639,  Lng: -81.533339),  Route carried "on" structure: Interstate 77,  Year Built: 1997,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 6,400 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 9,152 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: TYGART CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 272.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.13m (23.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $410,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A179,  Location: 0.03 MILE N OF CR 42/1 (Lat: 39.158761,  Lng: -81.500850),  Route carried "on" structure: County highway 42,  Year Built: 1997,  Status: Open,  Structure Length: 1.87m (6.14ft),  Average Daily Traffic: 650 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 715 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: LITTLE TYGART CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.826,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.5m (57.4ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $1,000,000,  Total Project Cost: $2,000,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A189,  Location: 0.13 MILE SOUTH OF CR 13 (Lat: 39.188989,  Lng: -81.529831),  Route carried "on" structure: State highway 14,  Year Built: 2001,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 8,700 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,048 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: Interstate 77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.151,  Lanes on structure: 5,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A248,  Location: 0.07 Mi South to CR 14/1 (Lat: 39.185231,  Lng: -81.524011),  Route carried "on" structure: State highway 14,  Year Built: 2012,  Status: Open,  Structure Length: 13.20m (43.31ft),  Average Daily Traffic: 6,900 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,245 (year 2039),  Design Load: HL 93,  Features Intersected: Tygart Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.491,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 54.9m (180.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.20m (43.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,000,000,  Roadway Improvement Cost: $1,000,000,  Total Project Cost: $5,000,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54A256,  Location: 0.01 Mile South of WV 14 (Lat: 39.171189,  Lng: -81.492631),  Route carried "on" structure: County highway 42,  Year Built: 2015,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 650 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 715 (year 2038),  Design Load: HL 93,  Features Intersected: Lockhart Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.403,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $569,000,  Total Project Cost: $569,000 ( Estimate for 2016)
Find on map >>   Show street view

Structure Number: 54A257,  Location: 0.5 Miles West of C.R.21 (Lat: 39.177311,  Lng: -81.534550),  Route carried "on" structure: County highway 2121,  Year Built: 2017,  Status: Open,  Structure Length: 2.05m (6.73ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 15 (year 2039),  Design Load: HL 93,  Features Intersected: Little Tygart Creek,  Facility Carried by Structure: County Route 21/21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 19.4m (63.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A258,  Location: 0.90 MI S of WV 14 (Lat: 39.177439,  Lng: -81.535150),  Route carried "on" structure: Interstate 77,  Year Built: 2017,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 12,800 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 18,304 (year 2039),  Design Load: HL 93,  Features Intersected: CR 21/21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 272.140,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 34.1m (111.9ft),  Out-to-Out Width: 36.6m (120.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54A061,  Location: 0.07 M NORTH OF CR 40/5 (Lat: 39.140550,  Lng: -81.549081),  Route carried "under" structure: Interstate 7700,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 6,000 (year 0007),  Truck Traffic: 15%,  Features Intersected: COUNTY ROUTE 21/22,  Facility Carried by Structure: COUNTY ROUTE 21/22
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 267.907,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 54A189,  Location: 0.13 MILE SOUTH OF CR 13 (Lat: 39.188981,  Lng: -81.529889),  Route carried "under" structure: Interstate 7700,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 0008),  Truck Traffic: 19%,  Features Intersected: Interstate 77,  Facility Carried by Structure: WEST VIRGINIA 14
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 273.637,  Lanes on structure: 5,  Lanes under structure: 4,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 54A258,  Location: 0.90 MI S of WV 14 (Lat: 39.177439,  Lng: -81.535150),  Route carried "under" structure: County highway 2121,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2015),  Features Intersected: CR 21/21,  Facility Carried by Structure: I 77
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.322,  Lanes on structure: 4,  Length of Maximum Span: 9.1m (29.9ft)

Discuss Mineralwells, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.