Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mexico, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 105ft / 32.1mTotal length
  • $3,585,000Total costs
  • 63,669Total average daily traffic
  • 13,188Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mexico
  • No street view available for this location

New bridges in Mexico, PA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11950-1959
  • 151970-1979
Reconstructed bridges in Mexico, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 61990-1999
  • 12000-2009
Average Bridge Daily Traffic in Mexico, PA
Average Bridge Truck Traffic in Mexico, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Good
  • 37.5%Satisfactory
  • 25.0%Fair
  • 25.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 44.4%Satisfactory
  • 44.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Satisfactory
  • 66.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Good
  • 40.0%Satisfactory
  • 40.0%Fair
Find on map >>   Show street view

Structure Number: 19927,  Location: 1 MI E MIFFLINTOWN (Lat: 40.574389,  Lng: -77.368836),  Route carried "on" structure: US 22,  Year Built: 1974,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 6,671 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 9,979 (year 2041),  Design Load: HS 20,  Features Intersected: SR 2006
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.189,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $34,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $458,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 19928,  Location: 1 MI E MIFFLINTOWN (Lat: 40.574522,  Lng: -77.368478),  Route carried "on" structure: US 22,  Year Built: 1974,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 7,021 (year 2021),  Truck Traffic: 22%,  Average Future Daily Traffic: 10,502 (year 2041),  Design Load: HS 20,  Features Intersected: SR 2006
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.163,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $34,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $453,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19931,  Location: MEXICO (Lat: 40.544278,  Lng: -77.350147),  Route carried "on" structure: US 22,  Year Built: 1972,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 7.59m (24.90ft),  Average Daily Traffic: 6,671 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 9,979 (year 2041),  Design Load: HS 20,  Features Intersected: SR 2003 AND DOE RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.012,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 19933,  Location: MEXICO (Lat: 40.544472,  Lng: -77.350058),  Route carried "on" structure: US 22,  Year Built: 1972,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 7,021 (year 2021),  Truck Traffic: 22%,  Average Future Daily Traffic: 10,502 (year 2041),  Design Load: HS 20,  Features Intersected: SR 2003 AND DOE RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.028,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $58,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $783,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 19936,  Location: 4 MI W THOMPSONTOWN (Lat: 40.547778,  Lng: -77.313292),  Route carried "on" structure: US 22,  Year Built: 1972,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 6,671 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 9,979 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: SR 2005
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.936,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $32,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $431,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 19937,  Location: 4 MI W THOMPSONTOWN (Lat: 40.547969,  Lng: -77.313606),  Route carried "on" structure: US 22,  Year Built: 1972,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 7,021 (year 2021),  Truck Traffic: 22%,  Average Future Daily Traffic: 10,502 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: SR 2005
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.849,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $32,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $431,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2022,  Location: MEXICO (Lat: 40.536103,  Lng: -77.351517),  Route carried "on" structure: State highway ,  Year Built: 1928,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 3,047 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,508 (year 2041),  Design Load: H 15,  Features Intersected: DOE RUN,  Facility Carried by Structure: SR 3002
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.114,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $27,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $363,000
Find on map >>   Show street view

Structure Number: 20354,  Location: 1 MILE N.OF MEXICO (Lat: 40.551681,  Lng: -77.356719),  Route carried "on" structure: ServiceCity street ,  Year Built: 1973,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 500 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 700 (year 2031),  Design Load: HS 20,  Features Intersected: CEDAR SPRING RUN,  Facility Carried by Structure: T-351 DEERVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20355,  Location: 600 FT NORTH OF SR 2005 (Lat: 40.567917,  Lng: -77.308550),  Route carried "on" structure: City street ,  Year Built: 1955,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 50 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 63 (year 2034),  Design Load: HL 93,  Features Intersected: DOE RUN,  Facility Carried by Structure: T-455 RED ROCK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 73.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $49,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $666,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19927,  Location: 1 MI E MIFFLINTOWN (Lat: 40.574389,  Lng: -77.368836),  Route carried "under" structure: State highway ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 1,873 (year 2021),  Truck Traffic: 2%,  Features Intersected: SR 2006,  Facility Carried by Structure: SR 22-US 22
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 2.272,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 19928,  Location: 1 MI E MIFFLINTOWN (Lat: 40.574522,  Lng: -77.368478),  Route carried "under" structure: State highway ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 1,873 (year 2021),  Truck Traffic: 2%,  Features Intersected: SR 2006,  Facility Carried by Structure: SR 22-US 22
Minimum Vertical Clearance: 4.86m (15.94ft),  Kilometerpoint: 2.272,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 19931,  Location: MEXICO (Lat: 40.544278,  Lng: -77.350147),  Route carried "under" structure: State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 189 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 2003 AND DOE RUN,  Facility Carried by Structure: SR 22-US 22
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 0.766,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 19933,  Location: MEXICO (Lat: 40.544472,  Lng: -77.350058),  Route carried "under" structure: State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 189 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 2003 AND DOE RUN,  Facility Carried by Structure: SR 22-US 22
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.766,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 19936,  Location: 4 MI W THOMPSONTOWN (Lat: 40.547778,  Lng: -77.313292),  Route carried "under" structure: State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 590 (year 2022),  Truck Traffic: 9%,  Features Intersected: SR 2005,  Facility Carried by Structure: SR 22-US 22
Minimum Vertical Clearance: 4.28m (14.04ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 19937,  Location: 4 MI W THOMPSONTOWN (Lat: 40.547969,  Lng: -77.313606),  Route carried "under" structure: State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 590 (year 2022),  Truck Traffic: 9%,  Features Intersected: SR 2005,  Facility Carried by Structure: SR 22-US 22
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 2004,  Location: 2 MI NE PORT ROYAL (Lat: 40.555344,  Lng: -77.361647),  Route carried "under" structure: US 22,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 7,021 (year 2021),  Truck Traffic: 22%,  Features Intersected: SR 22-US 22,  Facility Carried by Structure: SR 75-PA 75
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 15.504,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Frame,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 2004,  Location: 2 MI NE PORT ROYAL (Lat: 40.555344,  Lng: -77.361647),  Route carried "under" structure: US 22,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 6,671 (year 2021),  Truck Traffic: 25%,  Features Intersected: SR 22-US 22,  Facility Carried by Structure: SR 75-PA 75
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 15.479,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Frame,  Length of Maximum Span: 37.8m (124.0ft)

Discuss Mexico, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.