Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for McIntosh, Minnesota (MN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 43ft / 12.9mTotal length
  • 1,822Total average daily traffic
  • 1,822Total future (year 2029) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for McIntosh
  • No street view available for this location

New bridges in McIntosh, MN - historical statistics
  • New bridges - historical statistics
  • 31970-1979
  • 31980-1989
  • 11990-1999
  • 32000-2009
  • 22010-2019
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 58.3%Good
  • 41.7%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 75.0%Good
  • 8.3%Satisfactory
Find on map >>   Show street view

Structure Number: 60J09,  Location: 0.2 mi W of jct CR 203 (Lat: 47.673850,  Lng: -95.816175),  Route carried "on" structure: County highway 622,  Year Built: 2002,  Status: Open,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 45 (year 2002),  Average Future Daily Traffic: 45 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: Hill River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 60K03,  Location: 0.9 mi W of jct CR 103 (Lat: 47.673625,  Lng: -95.828294),  Route carried "on" structure: County highway 622,  Year Built: 2002,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 45 (year 2002),  Average Future Daily Traffic: 45 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: Hill River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 60K89,  Location: 0.4 MI S OF JCT CSAH 35 (Lat: 47.668281,  Lng: -95.885964),  Route carried "on" structure: County highway 8,  Year Built: 2008,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 910 (year 2017),  Average Future Daily Traffic: 910 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: POPLAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018
Find on map >>   Show street view

Structure Number: 60L21,  Location: 0.2 MI S OF JCT CSAH 35 (Lat: 47.685219,  Lng: -95.906861),  Route carried "on" structure: County highway 768,  Year Built: 2011,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 48 (year 2011),  Average Future Daily Traffic: 48 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: POPLAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 60L3,  Location: 0.2 MI S OF JCT CSAH 31 (Lat: 47.569992,  Lng: -95.864394),  Route carried "on" structure: County highway 556,  Year Built: 2012,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 49 (year 2012),  Average Future Daily Traffic: 49 (year 2032),  Design Load: HL 93,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 91511,  Location: 0.2 MI E OF JCT CSAH 8 (Lat: 47.644203,  Lng: -95.879531),  Route carried "on" structure: County highway 30,  Year Built: 1977,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 190 (year 2017),  Average Future Daily Traffic: 190 (year 2039),  Design Load: HS 20,  Features Intersected: POPLAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019
Find on map >>   Show street view

Structure Number: 9188,  Location: 0.5 MI W OF JCT CSAH 8 (Lat: 47.673489,  Lng: -95.896636),  Route carried "on" structure: County highway 622,  Year Built: 1978,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 25 (year 1973),  Average Future Daily Traffic: 25 (year 2029),  Design Load: HS 20,  Features Intersected: POPLAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 95374,  Location: 1.0 MI E OF JCT TH 2 (Lat: 47.629761,  Lng: -95.850486),  Route carried "on" structure: County highway 598,  Year Built: 1981,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 69 (year 1980),  Average Future Daily Traffic: 69 (year 2029),  Design Load: HS 20,  Features Intersected: POPLAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019
Find on map >>   Show street view

Structure Number: 95375,  Location: 0.5 MI E OF JCT TH 2 (Lat: 47.629739,  Lng: -95.863519),  Route carried "on" structure: County highway 598,  Year Built: 1981,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 69 (year 1980),  Average Future Daily Traffic: 69 (year 2029),  Design Load: HS 20,  Features Intersected: POPLAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019
Find on map >>   Show street view

Structure Number: 96587,  Location: 2.2 MI E OF JCT CSAH 8 (Lat: 47.688392,  Lng: -95.833611),  Route carried "on" structure: County highway 35,  Year Built: 1988,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 150 (year 2017),  Average Future Daily Traffic: 150 (year 2039),  Design Load: HS 20,  Features Intersected: HILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 97128,  Location: 1.7 MI W OF JCT CSAH 8 (Lat: 47.687972,  Lng: -95.917703),  Route carried "on" structure: County highway 35,  Year Built: 1995,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 150 (year 2017),  Average Future Daily Traffic: 150 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: POPLAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018
Find on map >>   Show street view

Structure Number: L5787,  Location: 0.1 MI E OF JCT TH 2 (Lat: 47.629753,  Lng: -95.869550),  Route carried "on" structure: County highway 598,  Year Built: 1971,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 72 (year 1973),  Average Future Daily Traffic: 72 (year 2029),  Design Load: HS 20,  Features Intersected: POPLAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.9m (9.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019
Discuss McIntosh, Minnesota (MN) on our hugely popular Minnesota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.