Bridge Statistics for McEwensville, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 138ft / 42.1mTotal length
  • $1,360,000Total costs
  • 65,290Total average daily traffic
  • 19,331Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for McEwensville
  • No street view available for this location

New bridges in McEwensville, PA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 41960-1969
  • 71970-1979
  • 11980-1989
  • 11990-1999
  • 12010-2019
Reconstructed bridges in McEwensville, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in McEwensville, PA
Average Bridge Truck Traffic in McEwensville, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 80.0%Good
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 60.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 60.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 11.1%Good
  • 11.1%Satisfactory
  • 44.4%Fair
  • 11.1%Poor
Find on map >>   Show street view

Structure Number: 29021,  Location: 2 MI NE OF MILTON (Lat: 41.039322,  Lng: -76.811475),  Route carried "on" structure: Interstate 80,  Year Built: 1962,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 14,431 (year 2021),  Truck Traffic: 45%,  Average Future Daily Traffic: 19,254 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 1019 & MUDDY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.181,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.90m (19.36ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29022,  Location: 2 MI NE OF MILTON (Lat: 41.039414,  Lng: -76.810908),  Route carried "on" structure: Interstate 80,  Year Built: 1962,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 14,465 (year 2021),  Truck Traffic: 45%,  Average Future Daily Traffic: 19,130 (year 2032),  Design Load: HL 93,  Features Intersected: OVER SR 1019 & MUDDY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.271,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.90m (19.36ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 29073,  Location: 3 MI E OF WATSONTOWN (Lat: 41.074569,  Lng: -76.826439),  Route carried "on" structure: Interstate 180,  Year Built: 1971,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 10.15m (33.30ft),  Average Daily Traffic: 7,055 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 10,603 (year 2032),  Design Load: HS 20,  Features Intersected: SR44, NS RR, WARRIOR RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.858,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.90m (32.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $350,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29075,  Location: 2 MILES NORTH OF MILTON (Lat: 41.061614,  Lng: -76.835319),  Route carried "on" structure: Interstate 180,  Year Built: 1971,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 8,850 (year 2021),  Truck Traffic: 22%,  Average Future Daily Traffic: 10,480 (year 2032),  Design Load: HS 20,  Features Intersected: OVER S.R. 1007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.425,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $221,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29077,  Location: 2 MILES NORTH OF MILTON (Lat: 41.061597,  Lng: -76.834986),  Route carried "on" structure: Interstate 180,  Year Built: 1971,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 8,585 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 10,603 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 1007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.465,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $32,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $429,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29141,  Location: 3 MI NORTH MCEWENSVILLE (Lat: 41.094025,  Lng: -76.803083),  Route carried "on" structure: State highway ,  Year Built: 1983,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 470 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 667 (year 2032),  Design Load: HS 20,  Features Intersected: WARRIOR RUN CREEK,  Facility Carried by Structure: SR 1006
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.046,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29146,  Location: 0.5 MI S OF WARRIOR RUN (Lat: 41.095267,  Lng: -76.807997),  Route carried "on" structure: State highway ,  Year Built: 1957,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,293 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,462 (year 2032),  Features Intersected: TRIBUTARY WARRIOR RUN,  Facility Carried by Structure: SR 1007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.362,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $93,000,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29162,  Location: 3 MI N.W.OF MILTON (Lat: 41.049917,  Lng: -76.784919),  Route carried "on" structure: State highway ,  Year Built: 1934,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 254 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 409 (year 2032),  Features Intersected: OVER MUDDY RUN,  Facility Carried by Structure: SR 1016
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.220,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 2932,  Location: 0.1 MI.N.OF INT.PA44 T608 (Lat: 41.074464,  Lng: -76.833161),  Route carried "on" structure: City street ,  Year Built: 2015,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 100 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 155 (year 2031),  Design Load: HL 93,  Features Intersected: Warrior Run,  Facility Carried by Structure: T-608 (Oakes Lane)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $267,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29371,  Location: 4 MI N OF MILTON (Lat: 41.043583,  Lng: -76.800669),  Route carried "on" structure: City street T364,  Year Built: 1949,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 150 (year 2019),  Average Future Daily Traffic: 232 (year 2041),  Design Load: HS 20,  Features Intersected: OVER MUDDY RUN,  Facility Carried by Structure: T-364 TURBOT TWP.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 40147,  Location: .25MI N OF MCEWENSVILLE (Lat: 41.077631,  Lng: -76.817842),  Route carried "on" structure: State highway ,  Year Built: 1998,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 1,293 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,462 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WARRIOR RUN CREEK,  Facility Carried by Structure: SR 1007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.099,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29021,  Location: 2 MI NE OF MILTON (Lat: 41.039322,  Lng: -76.811475),  Route carried "under" structure: State highway ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 602 (year 2018),  Truck Traffic: 5%,  Features Intersected: OVER SR 1019 & MUDDY RUN,  Facility Carried by Structure: I-80 EB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 2.515,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 29022,  Location: 2 MI NE OF MILTON (Lat: 41.039414,  Lng: -76.810908),  Route carried "under" structure: State highway ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 602 (year 2018),  Truck Traffic: 5%,  Features Intersected: OVER SR 1019 & MUDDY RUN,  Facility Carried by Structure: I-80 WB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 2.515,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 29072,  Location: 3 MI E OF WATSONTOWN (Lat: 41.074575,  Lng: -76.826792),  Route carried "under" structure: State highway 44,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 886 (year 2020),  Truck Traffic: 6%,  Features Intersected: SR44,NORSOUTH,WARRIOR RU,  Facility Carried by Structure: SR 0180 EB
Minimum Vertical Clearance: 7.71m (25.30ft),  Kilometerpoint: 9.461,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 29073,  Location: 3 MI E OF WATSONTOWN (Lat: 41.074569,  Lng: -76.826439),  Route carried "under" structure: State highway 44,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 886 (year 2020),  Truck Traffic: 6%,  Features Intersected: SR44, NS RR, WARRIOR RUN,  Facility Carried by Structure: SR 0180 WB
Minimum Vertical Clearance: 8.15m (26.74ft),  Kilometerpoint: 8.745,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 29075,  Location: 2 MILES NORTH OF MILTON (Lat: 41.061614,  Lng: -76.835319),  Route carried "under" structure: State highway ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 2,684 (year 2022),  Truck Traffic: 9%,  Features Intersected: OVER S.R. 1007,  Facility Carried by Structure: I-180 EASTBOUND
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 1.814,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 29077,  Location: 2 MILES NORTH OF MILTON (Lat: 41.061597,  Lng: -76.834986),  Route carried "under" structure: State highway ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 2,684 (year 2022),  Truck Traffic: 9%,  Features Intersected: OVER SR 1007,  Facility Carried by Structure: I-180 WBL
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 1.814,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Discuss McEwensville, Pennsylvania (PA) on our hugely popular Pennsylvania forum.