Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Marshall, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 43Number of bridges
  • 420ft / 128mTotal length
  • $6,448,000Total costs
  • 368,645Total average daily traffic
  • 172,999Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Marshall
  • No street view available for this location

New bridges in Marshall, IL - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 11940-1949
  • 31950-1959
  • 211960-1969
  • 11970-1979
  • 81980-1989
  • 41990-1999
  • 22000-2009
  • 12020-2022
Reconstructed bridges in Marshall, IL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 01980-1989
  • 111990-1999
Average Bridge Daily Traffic in Marshall, IL
Average Bridge Truck Traffic in Marshall, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.8%Very good
  • 34.6%Good
  • 38.5%Satisfactory
  • 7.7%Fair
  • 15.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.5%Very good
  • 53.8%Good
  • 19.2%Satisfactory
  • 11.5%Fair
  • 3.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 26.9%Very good
  • 46.2%Good
  • 23.1%Satisfactory
  • 3.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.9%Very good
  • 48.3%Good
  • 37.9%Satisfactory
  • 3.4%Fair
  • 3.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 22.2%Very good
  • 22.2%Good
  • 55.6%Satisfactory
Find on map >>   Show street view

Structure Number: 120004,  Location: 1 MI E ILL 1 (Lat: 39.422392,  Lng: -87.672031),  Route carried "on" structure: Interstate 70,  Year Built: 1968,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 14,000 (year 2021),  Truck Traffic: 53%,  Average Future Daily Traffic: 11,142 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 244.646,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.5m (67.3ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.41m (27.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $1,496,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $1,745,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 120005,  Location: 1 MI E ILL 1 (Lat: 39.422372,  Lng: -87.671825),  Route carried "on" structure: Interstate 70,  Year Built: 1968,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 8.40m (27.56ft),  Average Daily Traffic: 14,000 (year 2021),  Truck Traffic: 53%,  Average Future Daily Traffic: 11,142 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 244.662,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.5m (67.3ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.41m (27.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $1,494,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $1,743,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 120006,  Location: 2.5 MI E ILL 1 (Lat: 39.421619,  Lng: -87.646150),  Route carried "on" structure: Interstate 70,  Year Built: 1968,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 7.20m (23.62ft),  Average Daily Traffic: 14,000 (year 2021),  Truck Traffic: 53%,  Average Future Daily Traffic: 11,142 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: E LITTLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 247.011,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.5m (90.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 120007,  Location: 2.5 MI E ILL 1 (Lat: 39.421619,  Lng: -87.645956),  Route carried "on" structure: Interstate 70,  Year Built: 1968,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 7.20m (23.62ft),  Average Daily Traffic: 14,000 (year 2021),  Truck Traffic: 53%,  Average Future Daily Traffic: 11,142 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: E LITTLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 247.028,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.5m (90.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 120013,  Location: 2 MI N MARSHALL (Lat: 39.434031,  Lng: -87.688564),  Route carried "on" structure: State highway 1,  Year Built: 1954,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 5,200 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,055 (year 2032),  Design Load: HS 20,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 251.582,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019,  Bridge Improvement Cost: $967,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $1,128,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 120014,  Location: 0.5 MI N OF US 40 (Lat: 39.410500,  Lng: -87.693636),  Route carried "on" structure: State highway 1,  Year Built: 1940,  Year Reconstructed: 1973,  Status: Temporarily open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 8,900 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,000 (year 2032),  Design Load: HS 20,  Features Intersected: CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 248.894,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: October 2021,  Other Special Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 120021,  Location: 2 MI W MARSHALL (Lat: 39.379597,  Lng: -87.735878),  Route carried "on" structure: US 40,  Year Built: 1952,  Status: Open,  Structure Length: 4.00m (13.12ft),  Average Daily Traffic: 3,300 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,478 (year 2032),  Design Load: HS 20,  Features Intersected: EAST MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 237.983,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.0m (49.2ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,644,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $1,832,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 120028,  Location: 1.75 MI W IL 1 (Lat: 39.411261,  Lng: -87.723169),  Route carried "on" structure: County highway ,  Year Built: 1968,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 7.24m (23.75ft),  Average Daily Traffic: 2,150 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,065 (year 2032),  Design Load: HS 20,  Features Intersected: I-70,  Facility Carried by Structure: CH 8(FAS 688)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.494,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 120041,  Location: .75 MI W IL 1 (Lat: 39.420286,  Lng: -87.706356),  Route carried "on" structure: County highway ,  Year Built: 1969,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 6.96m (22.83ft),  Average Daily Traffic: 525 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 544 (year 2032),  Design Load: HS 15,  Features Intersected: I-70,  Facility Carried by Structure: TR 107
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.4m (70.2ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 120045,  Location: 2 MI E IL 1 (Lat: 39.421933,  Lng: -87.653569),  Route carried "on" structure: County highway ,  Year Built: 1968,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 7.18m (23.56ft),  Average Daily Traffic: 200 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 217 (year 2032),  Design Load: HS 15,  Features Intersected: I-70,  Facility Carried by Structure: TR 272 A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 120054,  Location: N MARSHALL (Lat: 39.421461,  Lng: -87.693444),  Route carried "on" structure: Interstate 70,  Year Built: 1969,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 5.35m (17.55ft),  Average Daily Traffic: 12,700 (year 2021),  Truck Traffic: 52%,  Average Future Daily Traffic: 10,761 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: IL 1(FAP 332)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 242.940,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 120055,  Location: N MARSHALL (Lat: 39.421481,  Lng: -87.693319),  Route carried "on" structure: Interstate 70,  Year Built: 1969,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 5.35m (17.55ft),  Average Daily Traffic: 14,000 (year 2021),  Truck Traffic: 53%,  Average Future Daily Traffic: 11,142 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: IL 1(FAP 332)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 242.956,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 120065,  Location: E OF MARSHALL (Lat: 39.403164,  Lng: -87.656225),  Route carried "on" structure: US 40,  Year Built: 1994,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 5,000 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,892 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 246.062,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 120068,  Location: 1.5 MI E MARSHALL (Lat: 39.407514,  Lng: -87.639836),  Route carried "on" structure: US 40,  Year Built: 2000,  Status: Open,  Structure Length: 3.79m (12.43ft),  Average Daily Traffic: 4,600 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,457 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LITTLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 247.543,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.0m (121.4ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 122008,  Location: MP 143.3 (Lat: 39.402353,  Lng: -87.748447),  Route carried "on" structure: Interstate 70,  Year Built: 1969,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 25,400 (year 2021),  Truck Traffic: 52%,  Average Future Daily Traffic: 21,523 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: E MILL CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 237.645,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 89.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 122009,  Location: MP 144.2 (Lat: 39.405206,  Lng: -87.733900),  Route carried "on" structure: Interstate 70,  Year Built: 1969,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 25,400 (year 2021),  Truck Traffic: 52%,  Average Future Daily Traffic: 21,523 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: E MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 238.949,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 12201,  Location: MP 144.3 (Lat: 39.406250,  Lng: -87.731656),  Route carried "on" structure: Interstate 70,  Year Built: 1969,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 25,400 (year 2021),  Truck Traffic: 52%,  Average Future Daily Traffic: 21,523 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: E MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 239.174,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.9m (9.5ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 94.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 56.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 12202,  Location: 1.5 MI NW MARSHALL (Lat: 39.415608,  Lng: -87.715953),  Route carried "on" structure: Interstate 70,  Year Built: 1971,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 25,400 (year 2021),  Truck Traffic: 52%,  Average Future Daily Traffic: 21,523 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 240.880,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 123007,  Location: 1 MI SE LINCOLN TR P (Lat: 39.330653,  Lng: -87.734881),  Route carried "on" structure: County highway ,  Year Built: 1961,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 5.29m (17.36ft),  Average Daily Traffic: 350 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 353 (year 2032),  Design Load: HS 15,  Features Intersected: MILL CREEK,  Facility Carried by Structure: CH 22(FAS 690)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.716,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 123081,  Location: 2.5 MI W MARSHALL (Lat: 39.387181,  Lng: -87.753906),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 54 (year 2032),  Features Intersected: E MILL CREEK TRIB,  Facility Carried by Structure: TR 206
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.690,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.8m (22.3ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 123101,  Location: 4.6 MI S MARSHALL (Lat: 39.323436,  Lng: -87.690725),  Route carried "on" structure: County highway ,  Year Built: 1909,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 544 (year 2032),  Features Intersected: SNYDER CREEK,  Facility Carried by Structure: TR 262
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 123143,  Location: 1 MI NW MARSHALL (Lat: 39.408250,  Lng: -87.717906),  Route carried "on" structure: County highway ,  Year Built: 1957,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,150 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,065 (year 2032),  Design Load: H 15,  Features Intersected: E MILL CREEK,  Facility Carried by Structure: FAS 688(CH 8)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.105,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 123218,  Location: 3.5 MI S MARSHALL (Lat: 39.334039,  Lng: -87.723556),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 125 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 190 (year 2032),  Design Load: HS 20,  Features Intersected: SANDY BRANCH,  Facility Carried by Structure: FAS 690(TR 231A)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.890,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 123223,  Location: 3.2 MI NE CLARKSVILL (Lat: 39.469378,  Lng: -87.736972),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 82 (year 2032),  Design Load: HS 20,  Features Intersected: W FORK BIG CREEK,  Facility Carried by Structure: TR 105
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.189,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 123224,  Location: 3.0 MI NE LIVINGSTON (Lat: 39.447303,  Lng: -87.636656),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 75 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 54 (year 2032),  Design Load: HS 20,  Features Intersected: CROOKED CREEK,  Facility Carried by Structure: TR 302
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.315,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 123249,  Location: 2 MI SW OF OLIVER (Lat: 39.473942,  Lng: -87.725206),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 54 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB BIG CREEK,  Facility Carried by Structure: TR 31 A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12325,  Location: 2.5 MI NW MARSHALL (Lat: 39.414897,  Lng: -87.731300),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 2,150 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,065 (year 2032),  Design Load: HS 20,  Features Intersected: E MILL CREEK,  Facility Carried by Structure: FAS 688(CH 8)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.721,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 123251,  Location: 3 MI NE MARSHALL (Lat: 39.424814,  Lng: -87.647264),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 125 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 109 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB BIG CREEK,  Facility Carried by Structure: TR 101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.674,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 12326,  Location: 2.5 MI NW MARSHALL (Lat: 39.416069,  Lng: -87.737919),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,000 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,065 (year 2032),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: FAS 688(CH 8)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.142,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 123262,  Location: 4 MI S OF MARSHALL (Lat: 39.332769,  Lng: -87.695803),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 225 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 272 (year 2032),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: FAS 690(TR 231A)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.514,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.9m (9.5ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 123281,  Location: 1 MI SE LIVINGSTON (Lat: 39.397931,  Lng: -87.637500),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.72m (5.64ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 163 (year 2032),  Design Load: HS 20,  Features Intersected: EAST LITTLE CREEK,  Facility Carried by Structure: TR 272 B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.7m (51.5ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 12329,  Location: 4.2 MI N MARSHALL (Lat: 39.450817,  Lng: -87.696533),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 3.89m (12.76ft),  Average Daily Traffic: 150 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 190 (year 2032),  Design Load: HS 20,  Features Intersected: E FORK BIG CREEK,  Facility Carried by Structure: TR 256
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.490,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.5m (67.3ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 123329,  Location: 4 MI N MARSHALL (Lat: 39.447903,  Lng: -87.716614),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 5.54m (18.18ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 190 (year 2032),  Design Load: HS 20,  Features Intersected: W FORK BIG CREEK,  Facility Carried by Structure: TR 242
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 123342,  Location: 3 Mi. SW Marshall (Lat: 39.359278,  Lng: -87.741603),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 150 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 190 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: East Mill Creek,  Facility Carried by Structure: TR 191
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.285,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 233268,  Location: .5 MI W OF OLIVER (Lat: 39.487331,  Lng: -87.691211),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 5.08m (16.67ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 54 (year 2032),  Design Load: HS 20,  Features Intersected: E FORK OF BIG CREEK,  Facility Carried by Structure: TR 7 A(CLARK CO)
Minimum Vertical Clearance: 30.40m (99.74ft),  Kilometerpoint: 2.897,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.3m (63.3ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 120003,  Location: NE OF MARSHALL (Lat: 39.422817,  Lng: -87.676539),  Route carried "under" structure: Interstate 70,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 28,000 (year 2021),  Truck Traffic: 53%,  Features Intersected: I-70,  Facility Carried by Structure: CNRL RR
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 244.292,  Lanes under structure: 4,  Material/Design: Steel,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 120028,  Location: 1.75 MI W IL 1 (Lat: 39.411261,  Lng: -87.723169),  Route carried "under" structure: Interstate 70,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 25,400 (year 2021),  Truck Traffic: 52%,  Features Intersected: I-70,  Facility Carried by Structure: CH 8(FAS 688)
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 240.091,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 120041,  Location: .75 MI W IL 1 (Lat: 39.419611,  Lng: -87.706161),  Route carried "under" structure: Interstate 70,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 25,400 (year 2021),  Truck Traffic: 52%,  Features Intersected: I-70,  Facility Carried by Structure: TR 107
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 241.846,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.4m (70.2ft)

Find on map >>   Show street view

Structure Number: 120043,  Location: 4.5 MI W IL 1 (Lat: 39.399539,  Lng: -87.771131),  Route carried "under" structure: Interstate 70,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 25,400 (year 2021),  Truck Traffic: 52%,  Features Intersected: I-70,  Facility Carried by Structure: TR 198
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 235.650,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.4m (70.2ft)

Find on map >>   Show street view

Structure Number: 120045,  Location: 2 MI E IL 1 (Lat: 39.421681,  Lng: -87.653489),  Route carried "under" structure: Interstate 70,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 28,000 (year 2021),  Truck Traffic: 53%,  Features Intersected: I-70,  Facility Carried by Structure: TR 272 A
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 246.400,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.2m (72.8ft)

Find on map >>   Show street view

Structure Number: 120054,  Location: N MARSHALL (Lat: 39.421481,  Lng: -87.693319),  Route carried "under" structure: State highway 1,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,850 (year 2021),  Truck Traffic: 25%,  Features Intersected: IL 1(FAP 332),  Facility Carried by Structure: I-70 (EB)
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 250.085,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 120055,  Location: N MARSHALL (Lat: 39.421656,  Lng: -87.693306),  Route carried "under" structure: State highway 1,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,850 (year 2021),  Truck Traffic: 25%,  Features Intersected: IL 1(FAP 332),  Facility Carried by Structure: I-70 (WB)
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 250.117,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 123073,  Location: 0.25 MI E MARSHALL (Lat: 39.382611,  Lng: -87.683564),  Route carried "under" structure: County highway ,  Year Built: 1906,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 2021),  Truck Traffic: 1%,  Features Intersected: TR 165,  Facility Carried by Structure: ABANDONED RR
Minimum Vertical Clearance: 3.81m (12.50ft),  Kilometerpoint: 0.451,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 7.6m (24.9ft)

Discuss Marshall, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.