Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for MacArthur, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 279ft / 84.6mTotal length
  • $1,550,000Total costs
  • 144,286Total average daily traffic
  • 21,011Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for MacArthur
  • No street view available for this location

New bridges in MacArthur, WV - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11940-1949
  • 11960-1969
  • 161980-1989
  • 12000-2009
Reconstructed bridges in MacArthur, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in MacArthur, WV
Average Bridge Truck Traffic in MacArthur, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.2%Very good
  • 36.4%Satisfactory
  • 45.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 54.5%Satisfactory
  • 36.4%Fair
  • 9.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 45.5%Satisfactory
  • 45.5%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Very good
  • 40.0%Good
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 41A087,  Location: 0.01 MI EAST OF CO 19/38 (Lat: 37.756911,  Lng: -81.169750),  Route carried "on" structure: County highway 1910,  Year Built: 1910,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 1,400 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,764 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: WHITESTICK CREEK,  Facility Carried by Structure: CO 19/10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.283,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.2m (30.2ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2019),  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A096,  Location: 0.40 MI S OF CR 19/10 (Lat: 37.751719,  Lng: -81.169431),  Route carried "on" structure: County highway 1938,  Year Built: 1940,  Year Reconstructed: 1974,  Status: Posted for load,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 55 (year 2039),  Features Intersected: PINEY CREEK,  Facility Carried by Structure: CR 19/38
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $650,000 ( Estimate for 2017),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 41A154,  Location: 0.04 MI S OF CR 19/10 (Lat: 37.756731,  Lng: -81.168519),  Route carried "on" structure: County highway 1949,  Year Built: 1960,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 2.52m (8.27ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 55 (year 2039),  Design Load: HS 20,  Features Intersected: PINEY CREEK,  Facility Carried by Structure: CR 19/49
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 25.30m (83.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 41A167,  Location: 0.01 MI N OF CR 16/16 (Lat: 37.760761,  Lng: -81.209519),  Route carried "on" structure: County highway 338,  Year Built: 1983,  Status: Open,  Structure Length: 10.63m (34.88ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 276 (year 2039),  Design Load: HS 20,  Features Intersected: WV 16,  Facility Carried by Structure: CR 3/38
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 33.4m (109.6ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A184,  Location: 0.14 MI S OF CR 20 (Lat: 37.731800,  Lng: -81.192169),  Route carried "on" structure: County highway 1941,  Year Built: 1984,  Status: Open,  Structure Length: 11.96m (39.24ft),  Average Daily Traffic: 20 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 25 (year 2038),  Design Load: HS 20,  Features Intersected: I 64 Ramps A B C D,  Facility Carried by Structure: CR 19/41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.040,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 51.5m (169.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A189,  Location: 1.12 MI. E. FORM I-77 (Lat: 37.731031,  Lng: -81.193381),  Route carried "on" structure: Interstate 6400,  Year Built: 1985,  Status: Open,  Structure Length: 11.29m (37.04ft),  Average Daily Traffic: 1,220 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 37,632 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: I-77 SB ramp,  Facility Carried by Structure: I-64 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 193.540,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 50.6m (166.0ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A221,  Location: 1.05 MI N OF I-64 I/C (Lat: 37.743289,  Lng: -81.207881),  Route carried "on" structure: Interstate 7700,  Year Built: 1985,  Status: Open,  Structure Length: 11.80m (38.71ft),  Average Daily Traffic: 20,658 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 41,317 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: PINEY CREEK and CSX RR,  Facility Carried by Structure: I-77 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.710,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 52.1m (170.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A222,  Location: AT I-64, I-77 I/C (Lat: 37.728931,  Lng: -81.192989),  Route carried "on" structure: Interstate 7700,  Year Built: 1985,  Status: Open,  Structure Length: 11.31m (37.11ft),  Average Daily Traffic: 10,303 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 19,320 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: I-64W TO I-77S CONNECTOR,  Facility Carried by Structure: I-77 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.456,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 50.6m (166.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A223,  Location: AT I-64, I-77 I/C (Lat: 37.730061,  Lng: -81.195961),  Route carried "on" structure: Interstate 7700,  Year Built: 1985,  Status: Open,  Structure Length: 9.59m (31.46ft),  Average Daily Traffic: 9,200 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 19,320 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: I-77S TO I-64E CONNECTOR,  Facility Carried by Structure: I-77 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.746,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A225,  Location: 2.28 MI N OF I-64 I/C (Lat: 37.758400,  Lng: -81.212911),  Route carried "on" structure: Interstate 7700,  Year Built: 1985,  Status: Open,  Structure Length: 10.94m (35.89ft),  Average Daily Traffic: 35,075 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 56,120 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: WV Rt 16 & Pemberton Rd,  Facility Carried by Structure: I-77 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.592,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 27.3m (89.6ft),  Curb-To-Curb Width: 17.3m (56.8ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A289,  Location: 0.23 MILE E OF CO 20/1 (Lat: 37.742981,  Lng: -81.190469),  Route carried "on" structure: County highway 2000,  Year Built: 2002,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 100 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 126 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: PINEY CREEK,  Facility Carried by Structure: COUNTY ROUTE 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.203,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A167,  Location: 0.01 MI N OF CR 16/16 (Lat: 37.760761,  Lng: -81.209519),  Route carried "under" structure: State highway 1600,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 20,500 (year 0009),  Truck Traffic: 6%,  Features Intersected: WV 16,  Facility Carried by Structure: CR 3/38
Minimum Vertical Clearance: 14.71m (48.26ft),  Kilometerpoint: 25.943,  Lanes on structure: 2,  Lanes under structure: 6,  Length of Maximum Span: 33.4m (109.6ft)

Find on map >>   Show street view

Structure Number: 41A184,  Location: 0.14 MI S OF CR 20 (Lat: 37.731961,  Lng: -81.192881),  Route carried "under" structure: Ramp Interstate 6400,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 7,800 (year 0009),  Truck Traffic: 17%,  Features Intersected: I 64 Ramps A B C D,  Facility Carried by Structure: CR 19/41
Minimum Vertical Clearance: 10.36m (33.99ft),  Kilometerpoint: 193.250,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 51.5m (169.0ft)

Find on map >>   Show street view

Structure Number: 41A184,  Location: 0.14 MI S OF CR 20 (Lat: 37.731961,  Lng: -81.192881),  Route carried "under" structure: Ramp Interstate 6400,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 800 (year 0009),  Truck Traffic: 17%,  Features Intersected: I 64 Ramps A B C D,  Facility Carried by Structure: CR 19/41
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 193.234,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 51.5m (169.0ft)

Find on map >>   Show street view

Structure Number: 41A184,  Location: 0.14 MI S OF CR 20 (Lat: 37.731961,  Lng: -81.192881),  Route carried "under" structure: Ramp Interstate 6400,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 7,700 (year 0009),  Truck Traffic: 17%,  Features Intersected: I 64 Ramps A B C D,  Facility Carried by Structure: CR 19/41
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 193.234,  Lanes on structure: 2,  Lanes under structure: 3,  Length of Maximum Span: 51.5m (169.0ft)

Find on map >>   Show street view

Structure Number: 41A184,  Location: 0.14 MI S OF CR 20 (Lat: 37.731961,  Lng: -81.192881),  Route carried "under" structure: Ramp Interstate 6400,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 900 (year 0009),  Truck Traffic: 17%,  Features Intersected: I 64 Ramps A B C D,  Facility Carried by Structure: CR 19/41
Minimum Vertical Clearance: 11.58m (37.99ft),  Kilometerpoint: 193.250,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 51.5m (169.0ft)

Find on map >>   Show street view

Structure Number: 41A189,  Location: 1.12 MI. E. FORM I-77 (Lat: 37.731031,  Lng: -81.193381),  Route carried "under" structure: Ramp Interstate 6400,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 0006),  Truck Traffic: 25%,  Features Intersected: I-77 SB ramp,  Facility Carried by Structure: I-64 EB
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 193.540,  Lanes on structure: 3,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Length of Maximum Span: 50.6m (166.0ft)

Find on map >>   Show street view

Structure Number: 41A222,  Location: AT I-64, I-77 I/C (Lat: 37.730061,  Lng: -81.195961),  Route carried "under" structure: Ramp Interstate 6400,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,700 (year 0006),  Truck Traffic: 25%,  Features Intersected: I-64W TO I-77S CONNECTOR,  Facility Carried by Structure: I-77 NB
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 192.848,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Length of Maximum Span: 50.6m (166.0ft)

Find on map >>   Show street view

Structure Number: 41A223,  Location: AT I-64, I-77 I/C (Lat: 37.728931,  Lng: -81.192989),  Route carried "under" structure: Ramp Interstate 6400,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,700 (year 0006),  Truck Traffic: 25%,  Features Intersected: I-77S TO I-64E CONNECTOR,  Facility Carried by Structure: I-77 NB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 193.234,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: On Interstate toll segment,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 41A225,  Location: 2.28 MI N OF I-64 I/C (Lat: 37.758400,  Lng: -81.212911),  Route carried "under" structure: State highway 1600,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 17,500 (year 0006),  Truck Traffic: 6%,  Features Intersected: WV Rt 16 & Pemberton Rd,  Facility Carried by Structure: I-77 SB
Minimum Vertical Clearance: 7.06m (23.16ft),  Kilometerpoint: 25.074,  Lanes on structure: 3,  Lanes under structure: 7,  Toll: On Interstate toll segment,  Length of Maximum Span: 27.3m (89.6ft)

Discuss MacArthur, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.