Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mabscott, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 105ft / 32.3mTotal length
  • $13,500,000Total costs
  • 127,525Total average daily traffic
  • 17,470Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mabscott
  • No street view available for this location

New bridges in Mabscott, WV - historical statistics
  • New bridges - historical statistics
  • 31960-1969
  • 71980-1989
Average Bridge Daily Traffic in Mabscott, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 60.0%Fair
  • 20.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 80.0%Fair
  • 20.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Satisfactory
  • 40.0%Fair
  • 40.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 41A163,  Location: 0.23 MI N OF CR 16/16 (Lat: 37.765650,  Lng: -81.203889),  Route carried "on" structure: State highway 1600,  Year Built: 1960,  Status: Posted for load,  Structure Length: 12.06m (39.57ft),  Average Daily Traffic: 16,200 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 19,440 (year 2039),  Design Load: H 20,  Features Intersected: WV 16 Ramps, CSX, city,  Facility Carried by Structure: WV 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.297,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.06m (39.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $10,000,000,  Roadway Improvement Cost: $1,000,000,  Total Project Cost: $11,000,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 41A168,  Location: 0.05 MI N OF CR 16/16 (Lat: 37.759931,  Lng: -81.210961),  Route carried "on" structure: State highway 1600,  Year Built: 1983,  Status: Open,  Structure Length: 6.21m (20.37ft),  Average Daily Traffic: 16,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,412 (year 2039),  Design Load: HS 20,  Features Intersected: Ramp Conn. I77 and WV 16,  Facility Carried by Structure: WV RT 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.267,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 30.0m (98.4ft),  Out-to-Out Width: 31.8m (104.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $2,100,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A171,  Location: 0.05 Mi. W Of Co. 16/10 (Lat: 37.776911,  Lng: -81.216219),  Route carried "on" structure: County highway 321,  Year Built: 1987,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 1,400 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,764 (year 2038),  Design Load: HS 20,  Features Intersected: WHITESTICK CREEK,  Facility Carried by Structure: COUNTY RT 3/21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.865,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $400,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 41A178,  Location: 0.36 MI. E. OF CR. 3/18 (Lat: 37.772700,  Lng: -81.220339),  Route carried "on" structure: County highway 321,  Year Built: 1983,  Status: Open,  Structure Length: 7.59m (24.90ft),  Average Daily Traffic: 1,400 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,764 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: CR. 3/21,  Facility Carried by Structure: CR 3/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A227,  Location: 0.27 MI N OF RT 16 I/C (Lat: 37.762281,  Lng: -81.214669),  Route carried "on" structure: Interstate 7700,  Year Built: 1985,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 35,075 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 56,120 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 16 CONNECTOR,  Facility Carried by Structure: I-77 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.075,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A163,  Location: 0.23 MI N OF CR 16/16 (Lat: 37.765611,  Lng: -81.203889),  Route carried "under" structure: Ramp State highway 1616,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 0009),  Features Intersected: WV 16 Ramps, CSX, city,  Facility Carried by Structure: WV 16
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 1.754,  Lanes on structure: 4,  Lanes under structure: 2,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 41A163,  Location: 0.23 MI N OF CR 16/16 (Lat: 37.765661,  Lng: -81.202519),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 1,200 (year 0009),  Truck Traffic: 6%,  Features Intersected: WV 16 Ramps, CSX, city,  Facility Carried by Structure: WV 16
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 26.297,  Lanes on structure: 4,  Lanes under structure: 2,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 41A168,  Location: 0.05 MI N OF CR 16/16 (Lat: 37.760289,  Lng: -81.210761),  Route carried "under" structure: Ramp Interstate 7700,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 6,500 (year 0009),  Truck Traffic: 17%,  Features Intersected: Ramp Conn. I77 and WV 16,  Facility Carried by Structure: WV RT 16
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 67.592,  Lanes on structure: 5,  Lanes under structure: 4,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 41A178,  Location: 0.36 MI. E. OF CR. 3/18 (Lat: 37.772750,  Lng: -81.220419),  Route carried "under" structure: Interstate 7700,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 46,500 (year 0009),  Truck Traffic: 17%,  Features Intersected: CR. 3/21,  Facility Carried by Structure: CR 3/2
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 69.379,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 41A227,  Location: 0.27 MI N OF RT 16 I/C (Lat: 37.762281,  Lng: -81.214669),  Route carried "under" structure: Ramp State highway 1600,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 0006),  Truck Traffic: 6%,  Features Intersected: ROUTE 16 CONNECTOR,  Facility Carried by Structure: I-77 SB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 25.154,  Lanes on structure: 3,  Lanes under structure: 3,  Toll: On Interstate toll segment,  Length of Maximum Span: 27.7m (90.9ft)

Discuss Mabscott, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.