Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ludlow, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 387ft / 118mTotal length
  • $98,988,000Total costs
  • 703,270Total average daily traffic
  • 71,942Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ludlow
  • No street view available for this location

New bridges in Ludlow, MA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11920-1929
  • 41930-1939
  • 181950-1959
  • 11990-1999
Reconstructed bridges in Ludlow, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 21980-1989
  • 131990-1999
  • 12000-2009
Average Bridge Daily Traffic in Ludlow, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 52.4%Good
  • 38.1%Satisfactory
  • 4.8%Fair
  • 4.8%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Good
  • 50.0%Satisfactory
  • 36.4%Fair
  • 4.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.7%Good
  • 59.1%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
  • 10.0%Poor
Find on map >>   Show street view

Structure Number: L160020MAMUNNBI,  Location: AT WILBRAHAM LINE (Lat: 42.175364,  Lng: -72.412367),  Route carried "on" structure: City street ,  Year Built: 1937,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 5.20m (17.06ft),  Average Daily Traffic: 5,172 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,210 (year 2032),  Design Load: HS 20,  Features Intersected: WATER CHICOPEE RIVER,  Facility Carried by Structure: HWY EAST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.336,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: November 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $2,299,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $3,449,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160030M6MUNNBI,  Location: AT WILBRAHAM LINE (Lat: 42.156900,  Lng: -72.423431),  Route carried "on" structure: City street ,  Year Built: 1939,  Year Reconstructed: 2006,  Status: Posted for load,  Structure Length: 11.55m (37.89ft),  Average Daily Traffic: 18,363 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,728 (year 2031),  Design Load: HS 20,  Features Intersected: WATER CHICOPEE RIVER,  Facility Carried by Structure: HWY MILLER ST
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 97.5m (319.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 34.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.60m (38.06ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2020,  Bridge Improvement Cost: $5,559,000,  Roadway Improvement Cost: $556,000,  Total Project Cost: $8,339,000 ( Estimate for 2022),  Deck Structure Type: Closed Grating
Find on map >>   Show street view

Structure Number: L160074JEDOTNBI,  Location: MM 55.2 ON I-90 EB (Lat: 42.168889,  Lng: -72.462722),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 4.71m (15.45ft),  Average Daily Traffic: 28,500 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 41,093 (year 2033),  Design Load: HS 20,  Features Intersected: HWY CHAPIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.833,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $776,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160074JFDOTNBI,  Location: MM 55.2 ON I-90 WB (Lat: 42.169206,  Lng: -72.463228),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 4.71m (15.45ft),  Average Daily Traffic: 28,890 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 41,093 (year 2033),  Design Load: HS 20,  Features Intersected: HWY CHAPIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.833,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $776,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L1600811YDOTNBI,  Location: AT SPRINGFIELD CITY LINE (Lat: 42.156500,  Lng: -72.484708),  Route carried "on" structure: State highway 21,  Year Built: 1930,  Status: Open,  Structure Length: 13.27m (43.54ft),  Average Daily Traffic: 23,427 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 36,998 (year 2032),  Design Load: HS 20,  Features Intersected: WATER CHICOPEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.989,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 15.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 14.10m (46.26ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $13,959,000,  Roadway Improvement Cost: $1,396,000,  Total Project Cost: $20,939,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L160094JGDOTNBI,  Location: MM 54.8 ON I-90 (Lat: 42.168092,  Lng: -72.472211),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1957,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 7.98m (26.18ft),  Average Daily Traffic: 14,740 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 175 (year 2032),  Design Load: HS 20,  Features Intersected: I 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.190,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,965,000,  Roadway Improvement Cost: $497,000,  Total Project Cost: $7,448,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160104JHDOTNBI,  Location: MM 54.3 ON I-90 EB (Lat: 42.166994,  Lng: -72.481806),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 59,670 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 67,005 (year 2032),  Design Load: HS 20,  Features Intersected: ST 21 CENTER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.385,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $68,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $103,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160104JJDOTNBI,  Location: MM 54.3 ON I-90 WB (Lat: 42.167181,  Lng: -72.481794),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 59,670 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 67,005 (year 2032),  Design Load: HS 20,  Features Intersected: ST 21 CENTER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.385,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $68,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $103,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160125NAMUNNBI,  Location: 0.1 MI W. OF BROOK STREET (Lat: 42.220194,  Lng: -72.500064),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 6,975 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,579 (year 2033),  Design Load: H 20,  Features Intersected: WATER STONY BROOK,  Facility Carried by Structure: HWY WEST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $256,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $385,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L160144JKDOTNBI,  Location: MM 54.1 ON I-90 EB (Lat: 42.166589,  Lng: -72.485769),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 54,569 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 67,005 (year 2032),  Design Load: HS 20,  Features Intersected: HWY FULLER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.063,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $106,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160144JLDOTNBI,  Location: MM 54.1 ON I-90 WB (Lat: 42.166764,  Lng: -72.485758),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 54,569 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 67,005 (year 2032),  Design Load: HS 20,  Features Intersected: HWY FULLER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.063,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $106,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160150M9MUNNBI,  Location: 1 MI E OF CHICOPEE (Lat: 42.179542,  Lng: -72.497528),  Route carried "on" structure: City street ,  Year Built: 1901,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 10,474 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 14,296 (year 2032),  Features Intersected: WATER HIGHER BROOK,  Facility Carried by Structure: HWY HOLYOKE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $590,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L160160M7MUNNBI,  Location: .2 MI S OF RTE 90 (Lat: 42.160542,  Lng: -72.510556),  Route carried "on" structure: City street ,  Year Built: 1939,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 13,750 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,717 (year 2032),  Design Load: HS 20,  Features Intersected: WATER CHICOPEE RIVER,  Facility Carried by Structure: HWY WEST ST
Minimum Vertical Clearance: 4.31m (14.14ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 55.5m (182.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $1,823,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $2,735,000 ( Estimate for 2022),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160174JMDOTNBI,  Location: MM 52.8 ON I-90 EB (Lat: 42.164000,  Lng: -72.510111),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 54,569 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 67,005 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY WEST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 84.971,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.6m (54.5ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $194,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $292,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160174JNDOTNBI,  Location: MM 52.8 ON I-90 WB (Lat: 42.164314,  Lng: -72.510103),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 54,569 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 67,005 (year 2032),  Design Load: HS 20,  Features Intersected: HWY WEST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 84.971,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.6m (54.5ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $388,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $583,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160180M8MUNNBI,  Location: .5 MI N OF RTE 90 (Lat: 42.171053,  Lng: -72.512506),  Route carried "on" structure: City street ,  Year Built: 1929,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 10,474 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,168 (year 2032),  Features Intersected: WATER HIGHER BROOK,  Facility Carried by Structure: HWY WEST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.159,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 44.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $578,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L160224JADOTNBI,  Location: MM 56.9 ON I-90 (Lat: 42.165228,  Lng: -72.431389),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 27,180 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 61,436 (year 2033),  Design Load: HS 20,  Features Intersected: HWY MILLER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.569,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,884,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,827,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160224JBDOTNBI,  Location: MM 56.9 ON I-90 (Lat: 42.165797,  Lng: -72.431736),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 27,552 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 61,436 (year 2033),  Design Load: HS 20,  Features Intersected: HWY MILLER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.569,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,884,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,827,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160234JCDOTNBI,  Location: MM 56.1 ON I-90 (Lat: 42.170158,  Lng: -72.447550),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 27,180 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 31,744 (year 2033),  Design Load: HS 20,  Features Intersected: HWY EAST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 90.282,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.9m (104.7ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,911,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $2,867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160234JDDOTNBI,  Location: MM 56.1 ON I-90 (Lat: 42.170486,  Lng: -72.446731),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 27,552 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 31,744 (year 2033),  Design Load: HS 20,  Features Intersected: HWY EAST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 90.282,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.3m (99.4ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,857,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,786,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160244J9DOTNBI,  Location: MM 58.2 ON I-90 (Lat: 42.157269,  Lng: -72.409403),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 25.69m (84.28ft),  Average Daily Traffic: 55,437 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 61,436 (year 2032),  Design Load: HS 20,  Features Intersected: COMB CHICOPEE RIVER/MAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.661,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 51.2m (168.0ft),  Curb-To-Curb Width: 23.4m (76.8ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.70m (84.32ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Underwater Inspection Date: December 2018,  Bridge Improvement Cost: $25,844,000,  Roadway Improvement Cost: $2,585,000,  Total Project Cost: $38,767,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L160260QXMUNNBI,  Location: 410' E OF INT ALDEN ST (Lat: 42.201572,  Lng: -72.404750),  Route carried "on" structure: City street ,  Year Built: 1952,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 388 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 613 (year 2032),  Features Intersected: WATER BROAD BROOK,  Facility Carried by Structure: HWY PINEY LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Poor,  Culverts: Critical,  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 3 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $717,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,076,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L16027BV4MUNNBI,  Location: .3M EAST OF MILLER STREET (Lat: 42.175056,  Lng: -72.439278),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 100 (year 2018),  Features Intersected: WATER MINECHOAG BROOK,  Facility Carried by Structure: HWY GENOVEVO DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 82.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $530,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L160094JGDOTNBI,  Location: .3MI.E.CENTER ST (Lat: 42.166667,  Lng: -72.466667),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 19,900 (year 0000),  Features Intersected: I 90 WB
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 88.190,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: L160094JGDOTNBI,  Location: .3MI.E.CENTER ST (Lat: 42.166667,  Lng: -72.466667),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 19,600 (year 0000),  Features Intersected: I 90 EB
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 88.190,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Discuss Ludlow, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.