Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lodgepole, Nebraska (NE)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 125ft / 37.8mTotal length
  • 40,355Total average daily traffic
  • 23,076Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lodgepole
  • No street view available for this location

New bridges in Lodgepole, NE - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11960-1969
  • 51970-1979
  • 11980-1989
  • 52010-2019
Reconstructed bridges in Lodgepole, NE - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Lodgepole, NE
Average Bridge Truck Traffic in Lodgepole, NE
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 62.5%Very good
  • 37.5%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Excellent
  • 37.5%Very good
  • 12.5%Good
  • 12.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Excellent
  • 12.5%Very good
  • 25.0%Good
  • 25.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 57.1%Excellent
  • 28.6%Very good
  • 14.3%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: C001717305,  Location: 2W LODGEPOLE (Lat: 41.133300,  Lng: -102.686700),  Route carried "on" structure: County highway 173,  Year Built: 1935,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 35 (year 2003),  Average Future Daily Traffic: 59 (year 2033),  Features Intersected: LODGEPOLE CREEK,  Facility Carried by Structure: CO RD 143 MI 14322
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 90.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: C001717905,  Location: JCT I80/L-17F .5S (Lat: 41.106600,  Lng: -102.629700),  Route carried "on" structure: County highway 1200,  Year Built: 1981,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 75 (year 2011),  Average Future Daily Traffic: 75 (year 2033),  Design Load: HS 20,  Features Intersected: COW CREEK,  Facility Carried by Structure: CO RD 149 MI 14916
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: S030 07625,  Location: 1W LODGEPOLE (Lat: 41.154500,  Lng: -102.652100),  Route carried "on" structure: US 30,  Year Built: 2012,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,130 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,526 (year 2038),  Design Load: HL 93,  Features Intersected: LODGEPOLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.271,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 42.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019
Find on map >>   Show street view

Structure Number: S030 07892,  Location: 2E LODGEPOLE (Lat: 41.139600,  Lng: -102.604600),  Route carried "on" structure: US 30,  Year Built: 1962,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,045 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,359 (year 2038),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.701,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 42.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: S080 07365,  Location: 3W LODGEPOLE INTERCHNG (Lat: 41.113300,  Lng: -102.686400),  Route carried "on" structure: County highway 181,  Year Built: 1971,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 35 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 45 (year 2033),  Design Load: H 20,  Features Intersected: I80,  Facility Carried by Structure: RD 143
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: S080 07661L,  Location: LODGEPOLE INTERCHNG (Lat: 41.113800,  Lng: -102.629800),  Route carried "on" structure: Interstate 80,  Year Built: 2017,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 7,550 (year 2018),  Truck Traffic: 61%,  Average Future Daily Traffic: 7,550 (year 2038),  Design Load: HL 93,  Features Intersected: LINK 17F & RD 149
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.329,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S080 07661R,  Location: LODGEPOLE INTERCHNG (Lat: 41.113500,  Lng: -102.629800),  Route carried "on" structure: Interstate 80,  Year Built: 1971,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 7,550 (year 2018),  Truck Traffic: 61%,  Average Future Daily Traffic: 7,550 (year 2038),  Design Load: HL 93,  Features Intersected: LINK 17F & RD 149
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.329,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S080 07690L,  Location: 1E LODGEPOLE INTERCHG (Lat: 41.113900,  Lng: -102.624200),  Route carried "on" structure: Interstate 80,  Year Built: 2017,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 7,615 (year 2018),  Truck Traffic: 60%,  Average Future Daily Traffic: 7,615 (year 2038),  Design Load: HS 20,  Features Intersected: COW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.376,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 51.8m (169.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Excellent,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S080 07690R,  Location: 1E LODGEPOLE INTERCHG (Lat: 41.113600,  Lng: -102.624200),  Route carried "on" structure: Interstate 80,  Year Built: 2016,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 7,615 (year 2018),  Truck Traffic: 60%,  Average Future Daily Traffic: 7,615 (year 2038),  Design Load: HS 20,  Features Intersected: COW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.376,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 51.8m (169.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: SL17F00179,  Location: 1S LODGEPOLE (Lat: 41.138300,  Lng: -102.629600),  Route carried "on" structure: Spur State highway L17F,  Year Built: 1971,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 185 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 241 (year 2038),  Features Intersected: LODGEPOLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.288,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: S080 07365,  Location: 3W LODGEPOLE INTERCHNG (Lat: 41.113300,  Lng: -102.686400),  Route carried "under" structure: Interstate 80,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 7,280 (year 2013),  Truck Traffic: 60%,  Features Intersected: I80,  Facility Carried by Structure: RD 143
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 11.853,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: S080 07661L,  Location: LODGEPOLE INTERCHNG (Lat: 41.113800,  Lng: -102.629800),  Route carried "under" structure: Spur State highway L17F,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 120 (year 2012),  Truck Traffic: 13%,  Features Intersected: LINK 17F & RD 149,  Facility Carried by Structure: I80
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: S080 07661R,  Location: LODGEPOLE INTERCHNG (Lat: 41.113500,  Lng: -102.629800),  Route carried "under" structure: Spur State highway L17F,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 120 (year 2012),  Truck Traffic: 13%,  Features Intersected: LINK 17F & RD 149,  Facility Carried by Structure: I80
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.013,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.4m (57.1ft)

Discuss Lodgepole, Nebraska (NE) on our hugely popular Nebraska forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.