Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lloyd, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 253ft / 76.6mTotal length
  • 171,872Total average daily traffic
  • 40,171Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lloyd
  • No street view available for this location

New bridges in Lloyd, FL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21930-1939
  • 11940-1949
  • 111970-1979
  • 11980-1989
  • 51990-1999
Reconstructed bridges in Lloyd, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Lloyd, FL
Average Bridge Truck Traffic in Lloyd, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Good
  • 66.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 41.7%Good
  • 50.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 41.7%Good
  • 50.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Very good
  • 13.3%Good
  • 40.0%Satisfactory
  • 26.7%Fair
  • 13.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Good
  • 66.7%Fair
  • 16.7%Poor
Find on map >>   Show street view

Structure Number: 540006,  Location: 1 Mile N of Lloyd (Lat: 30.487825,  Lng: -84.025428),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 13,250 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 22,989 (year 2042),  Design Load: HS 20,  Features Intersected: SR59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.543,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Inventory Rating: 69.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540019,  Location: 2.2MI East of County Line (Lat: 30.489592,  Lng: -84.005125),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 12.65m (41.50ft),  Average Daily Traffic: 12,250 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 21,254 (year 2042),  Design Load: HS 20,  Features Intersected: Lloyd Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.486,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540047,  Location: 2 Miles East of SR59 (Lat: 30.489022,  Lng: -83.983022),  Route carried "on" structure: County highway 158,  Year Built: 1974,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,164 (year 2042),  Design Load: HS 20,  Features Intersected: I10 SR8
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 5.975,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540049,  Location: 1Mile N of Lloyd (Lat: 30.487586,  Lng: -84.025375),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 13,250 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 22,989 (year 2042),  Design Load: HS 20,  Features Intersected: SR59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.543,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 69.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54005,  Location: 1.23 Mi E of SR 59 (Lat: 30.489344,  Lng: -84.004933),  Route carried "on" structure: Interstate 10,  Year Built: 1974,  Status: Open,  Structure Length: 14.94m (49.02ft),  Average Daily Traffic: 12,250 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 21,254 (year 2042),  Design Load: HS 20,  Features Intersected: Lloyd Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.486,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540061,  Location: 1.0MI S of SR8 I10 (Lat: 30.474725,  Lng: -84.022036),  Route carried "on" structure: State highway 59,  Year Built: 1977,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 1,381 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 2,396 (year 2042),  Design Load: HS 20,  Features Intersected: Lloyd Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.017,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Underwater Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 540068,  Location: 3.6 Miles South I-10/SR8 (Lat: 30.438972,  Lng: -84.019194),  Route carried "on" structure: State highway 59,  Year Built: 1984,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 1,381 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 2,396 (year 2042),  Design Load: HS 20,  Features Intersected: Polar Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.044,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 540072,  Location: 2.8 Miles East of SR 59 (Lat: 30.528769,  Lng: -83.978208),  Route carried "on" structure: US 90,  Year Built: 1997,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 3,300 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,726 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: Lake Miccosukee
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.170,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Underwater Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 550008,  Location: 7.5 mi East of I10 (Lat: 30.518375,  Lng: -84.041883),  Route carried "on" structure: US 90,  Year Built: 1949,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 4,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,940 (year 2042),  Design Load: HS 20,  Features Intersected: Patty Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.061,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 550012,  Location: 0.48 Miles N of US90/SR10 (Lat: 30.525886,  Lng: -84.048981),  Route carried "on" structure: County highway 59,  Year Built: 1901,  Year Reconstructed: 1955,  Status: Temporarily open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 1,500 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,650 (year 2039),  Design Load: HL 93,  Features Intersected: Unnamed Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.970,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 550043,  Location: 1.0mi West of County Line (Lat: 30.479361,  Lng: -84.058500),  Route carried "on" structure: Interstate 10,  Year Built: 1972,  Status: Open,  Structure Length: 1.48m (4.86ft),  Average Daily Traffic: 26,500 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 45,978 (year 2042),  Design Load: HS 20,  Features Intersected: Black Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.983,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Good,  Culverts: Good,  Inventory Rating: 64.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 550044,  Location: 0.5 mi W. of Countyline (Lat: 30.481694,  Lng: -84.049389),  Route carried "on" structure: Interstate 8,  Year Built: 1972,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 26,500 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 45,978 (year 2042),  Design Load: HS 20,  Features Intersected: Still Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.966,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Fair,  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 550056,  Location: 0.96 Mi. S. of US90/SR10 (Lat: 30.501025,  Lng: -84.080739),  Route carried "on" structure: County highway 364,  Year Built: 1935,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 700 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 770 (year 2039),  Design Load: HS 20,  Features Intersected: Black Creek,  Facility Carried by Structure: Wadesboro Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.998,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Underwater Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 554005,  Location: 0.8 Mi East of Baum Road (Lat: 30.457431,  Lng: -84.079328),  Route carried "on" structure: County highway ,  Year Built: 1938,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 4,400 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,840 (year 2038),  Design Load: HS 20,  Features Intersected: Unnamed Stream,  Facility Carried by Structure: Capitola Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.062,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 554033,  Location: 0.7 Miles E Baum Rd (Lat: 30.454731,  Lng: -84.082058),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 3.01m (9.88ft),  Average Daily Traffic: 5,800 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,380 (year 2040),  Design Load: HS 20,  Features Intersected: Unnamed Branch,  Facility Carried by Structure: Capitola Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.652,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 3.6m (11.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 554034,  Location: 2.34 Miles West of SR 59 (Lat: 30.473922,  Lng: -84.057825),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.45m (4.76ft),  Average Daily Traffic: 5,800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,380 (year 2039),  Design Load: HS 20,  Features Intersected: Black Creek,  Facility Carried by Structure: Capitola Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.867,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 554035,  Location: 2.16 Miles West of SR 59 (Lat: 30.474844,  Lng: -84.055244),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.48m (4.86ft),  Average Daily Traffic: 5,800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,380 (year 2039),  Design Load: HS 20,  Features Intersected: Still Creek,  Facility Carried by Structure: Capitola Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.136,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.5m (24.6ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 554036,  Location: 0.79 Mi E of Baum Rd (Lat: 30.506444,  Lng: -84.067667),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 110 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 120 (year 2040),  Features Intersected: Unnamed Branch,  Facility Carried by Structure: CR1541-WadesboroRd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.268,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 540006,  Location: 1 Mile N of Lloyd (Lat: 30.487825,  Lng: -84.025428),  Route carried "under" structure: State highway 59,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 3,400 (year 2020),  Truck Traffic: 13%,  Features Intersected: SR59,  Facility Carried by Structure: I10 SR8
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 15.548,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 540047,  Location: 2 Miles East of SR59 (Lat: 30.489022,  Lng: -83.983022),  Route carried "under" structure: Interstate 10,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 24,500 (year 2020),  Truck Traffic: 27%,  Features Intersected: I10 SR8,  Facility Carried by Structure: CR158
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 5.658,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 540049,  Location: 1Mile N of Lloyd (Lat: 30.487586,  Lng: -84.025375),  Route carried "under" structure: State highway 59,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 3,400 (year 2020),  Truck Traffic: 13%,  Features Intersected: SR59,  Facility Carried by Structure: I10 SR8
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 15.521,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Discuss Lloyd, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.