Bridge Statistics for Lemoyne, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 52ft / 15.7mTotal length
  • $2,261,000Total costs
  • 500,337Total average daily traffic
  • 50,948Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lemoyne
  • No street view available for this location

New bridges in Lemoyne, PA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 51960-1969
  • 51980-1989
  • 11990-1999
Reconstructed bridges in Lemoyne, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Lemoyne, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Good
  • 16.7%Satisfactory
  • 66.7%Fair
Find on map >>   Show street view

Structure Number: 13716,  Location: LEMOYNE BORO (Lat: 40.238472,  Lng: -76.895028),  Route carried "on" structure: State highway 581,  Year Built: 1960,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 85,079 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 74,895 (year 2032),  Design Load: HS 20,  Features Intersected: 83SB,8113 (Ramp to 581WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.910,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $59,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $801,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 13718,  Location: LEMOYNE BORO (Lat: 40.243706,  Lng: -76.885769),  Route carried "on" structure: Interstate 83,  Year Built: 1982,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 102,326 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 112,131 (year 2032),  Design Load: HS 20,  Features Intersected: RAMP X STA 7+35
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.016,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.6m (107.0ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 32.6m (107.0ft),  Out-to-Out Width: 34.6m (113.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13765,  Location: LEMOYNE (Lat: 40.236964,  Lng: -76.897514),  Route carried "on" structure: State highway 581,  Year Built: 1960,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 85,079 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 110,987 (year 2032),  Design Load: HS 20,  Features Intersected: TENTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.910,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 24.2m (79.4ft),  Out-to-Out Width: 26.1m (85.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $289,000,  Total Project Cost: $1,323,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 139,  Location: LEMOYNE (Lat: 40.241900,  Lng: -76.889122),  Route carried "on" structure: State highway ,  Year Built: 1982,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 15,537 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 22,145 (year 2032),  Design Load: HS 20,  Features Intersected: I-83; SR 0083,  Facility Carried by Structure: 2035 3rd St
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.090,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13901,  Location: LEMOYNE BORO (Lat: 40.242108,  Lng: -76.889392),  Route carried "on" structure: State highway ,  Year Built: 1923,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 15,537 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 22,145 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: NORFOLK SO.,  Facility Carried by Structure: SR 2035
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.090,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $137,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40719,  Location: 3rd St Lemoyne over RR (Lat: 40.245956,  Lng: -76.893422),  Route carried "on" structure: State highway ,  Year Built: 1999,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 15,537 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 22,145 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: NORFOLK SO. R.R.,  Facility Carried by Structure: 2035 (3rd St)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.090,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13716,  Location: LEMOYNE BORO (Lat: 40.238472,  Lng: -76.895028),  Route carried "under" structure: Interstate 83,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 38,694 (year 2021),  Truck Traffic: 15%,  Features Intersected: 83SB,8113 (Ramp to 581WB,  Facility Carried by Structure: PA 581
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 2.210,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 13716,  Location: LEMOYNE BORO (Lat: 40.238472,  Lng: -76.895028),  Route carried "under" structure: Ramp State highway ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 13,396 (year 2021),  Truck Traffic: 7%,  Features Intersected: 83SB,8113 (Ramp to 581WB,  Facility Carried by Structure: PA 581
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 13718,  Location: LEMOYNE BORO (Lat: 40.243706,  Lng: -76.885769),  Route carried "under" structure: Ramp State highway ,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 6,826 (year 2021),  Truck Traffic: 7%,  Features Intersected: RAMP X STA 7+35,  Facility Carried by Structure: I-83; SR 0083
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 13765,  Location: LEMOYNE (Lat: 40.236964,  Lng: -76.897514),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 1983),  Truck Traffic: 2%,  Features Intersected: TENTH STREET,  Facility Carried by Structure: ServiceCity street 1
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 139,  Location: LEMOYNE (Lat: 40.241900,  Lng: -76.889122),  Route carried "under" structure: Interstate 83,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 51,408 (year 2022),  Truck Traffic: 16%,  Features Intersected: I-83; SR 0083,  Facility Carried by Structure: 2035 3rd St
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 3.016,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 139,  Location: LEMOYNE (Lat: 40.241900,  Lng: -76.889122),  Route carried "under" structure: Interstate 83,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 50,918 (year 2022),  Truck Traffic: 10%,  Features Intersected: I-83; SR 0083,  Facility Carried by Structure: 2035 3rd St
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 3.137,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.8m (65.0ft)