Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lancaster, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 112ft / 34.1mTotal length
  • $31,581,000Total costs
  • 143,931Total average daily traffic
  • 3,474Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lancaster
  • No street view available for this location

New bridges in Lancaster, NY - historical statistics
  • New bridges - historical statistics
  • 51950-1959
  • 11970-1979
  • 51980-1989
  • 21990-1999
  • 22000-2009
  • 52010-2019
Average Bridge Daily Traffic in Lancaster, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Excellent
  • 11.1%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Excellent
  • 22.2%Very good
  • 44.4%Good
  • 11.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Excellent
  • 22.2%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 45.5%Very good
  • 27.3%Good
  • 27.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Excellent
  • 50.0%Good
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 101558,  Location: 1.3 MI E JCT US20 & NY130 (Lat: 42.899650,  Lng: -78.672958),  Route carried "on" structure: US 20,  Year Built: 2002,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 12,882 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,942 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CAYUGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.106,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.6m (116.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,879,000,  Roadway Improvement Cost: $2,271,000,  Total Project Cost: $6,150,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221331,  Location: CENTER OF LANCASTER (Lat: 42.900500,  Lng: -78.667025),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,838 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,573 (year 2037),  Design Load: H 20,  Features Intersected: PLUM BOTTOM CREEK,  Facility Carried by Structure: SCHOOL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $470,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221332,  Location: 0.1 MI NE RT 20 & CENTRAL (Lat: 42.901319,  Lng: -78.668819),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 535 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 749 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: PLUM BOTTOM CREEK,  Facility Carried by Structure: CLARK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $675,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227041,  Location: 0.8 Mi. S. of US20 in Vil (Lat: 42.870661,  Lng: -78.675728),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 364 (year 2020),  Average Future Daily Traffic: 510 (year 2040),  Design Load: H 20,  Features Intersected: SLATE BOTTOM CREEK,  Facility Carried by Structure: AMERICO COURT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $285,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 321325,  Location: CENTER OF LANCASTER VILL. (Lat: 42.901111,  Lng: -78.673281),  Route carried "on" structure: Other road ,  Year Built: 1982,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 6,603 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,244 (year 2037),  Design Load: HS 20,  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: AURORA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,841,000,  Roadway Improvement Cost: $1,663,000,  Total Project Cost: $4,504,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 321327,  Location: VILLAGE OF LANCASTER (Lat: 42.894689,  Lng: -78.667997),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 4,905 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,068 (year 2040),  Design Load: HS 20,  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: LAKE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,837,000,  Roadway Improvement Cost: $1,076,000,  Total Project Cost: $2,913,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332687,  Location: .2 MI S OF EAST LANCASTER (Lat: 42.889647,  Lng: -78.643083),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 8,708 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,195 (year 2040),  Design Load: HS 20,  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: BOWEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,475,000,  Roadway Improvement Cost: $864,000,  Total Project Cost: $2,339,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332695,  Location: 1 MI E OF LANCASTER LINE (Lat: 42.898167,  Lng: -78.638100),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 4,087 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,056 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: N BR PLUM BOTTOM,  Facility Carried by Structure: CEMETERY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $418,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332712,  Location: 1.3 MI NE JCT SH354 &SH78 (Lat: 42.870278,  Lng: -78.676369),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 7,385 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,798 (year 2040),  Design Load: HS 20,  Features Intersected: N SLATE BOTTOM CK,  Facility Carried by Structure: AURORA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.271,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $420,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332872,  Location: 1.5 MI E JCT SH78 & SH33 (Lat: 42.933667,  Lng: -78.642606),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 2,544 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,147 (year 2040),  Design Load: HL 93,  Features Intersected: ELLICOTT CREEK,  Facility Carried by Structure: STONY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.62m (11.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,913,000,  Roadway Improvement Cost: $1,120,000,  Total Project Cost: $3,033,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 33625,  Location: 3.1 MI E JCT SH 78 & US20 (Lat: 42.902908,  Lng: -78.637992),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 4,087 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,056 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ERIE STREET, NORFOLK SOU,  Facility Carried by Structure: CEMETERY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.788,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.9m (117.8ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.62m (11.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,263,000,  Roadway Improvement Cost: $1,911,000,  Total Project Cost: $5,174,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 336254,  Location: 1.7 MI S JCT SH33 & CR105 (Lat: 42.919578,  Lng: -78.622647),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 6,679 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,053 (year 2040),  Design Load: HL 93,  Features Intersected: CSX TRANS/ AMTRAK,  Facility Carried by Structure: PAVEMENT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.880,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $765,000,  Roadway Improvement Cost: $448,000,  Total Project Cost: $1,213,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336735,  Location: .2 MI E JCT CR155 & CR343 (Lat: 42.910514,  Lng: -78.622706),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 4,916 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,191 (year 2040),  Design Load: HS 20,  Features Intersected: BR PLUM BOTTOM CK,  Facility Carried by Structure: PAVEMENT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $226,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $358,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336769,  Location: .2 MI S JCT WAL AVE&CR341 (Lat: 42.917539,  Lng: -78.637606),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 4,125 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,103 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANS/ AMTRAK, EX-LE,  Facility Carried by Structure: CEMETERY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.397,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $534,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $847,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 770852,  Location: 1.5 MI NE JCT SH130 &SH78 (Lat: 42.912781,  Lng: -78.672128),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 1,153 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,614 (year 2036),  Features Intersected: CENTRAL AVENUE,  Facility Carried by Structure: COMMERCE PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Inventory Rating: 85.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2020,  Bridge Improvement Cost: $1,755,000,  Roadway Improvement Cost: $1,028,000,  Total Project Cost: $2,782,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33625,  Location: 3.1 MI E JCT SH 78 & US20 (Lat: 42.902908,  Lng: -78.637992),  Route carried "under" structure: Other road ,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 600 (year 2021),  Features Intersected: ERIE STREET, NORFOLK SOU,  Facility Carried by Structure: CEMETERY ROAD
Minimum Vertical Clearance: 7.70m (25.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.9m (117.8ft)

Find on map >>   Show street view

Structure Number: 77085,  Location: 1.3 MI E JCT RTS 130 & 78 (Lat: 42.904825,  Lng: -78.670922),  Route carried "under" structure: City street ,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 17,400 (year 2021),  Features Intersected: CENTRAL AVENUE,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 770851,  Location: 1.4 MI NE JCT RTS 130& 78 (Lat: 42.910442,  Lng: -78.671933),  Route carried "under" structure: County highway ,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 17,500 (year 2021),  Features Intersected: CENTRAL AVE-CR 57,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 770852,  Location: 1.5 MI NE JCT SH130 &SH78 (Lat: 42.912781,  Lng: -78.672128),  Route carried "under" structure: Other road ,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 15,620 (year 1989),  Features Intersected: CENTRAL AVENUE,  Facility Carried by Structure: COMMERCE PARKWAY
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 770853,  Location: 1.5 MI NE JCT RTS 130& 78 (Lat: 42.913608,  Lng: -78.672131),  Route carried "under" structure: County highway ,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 2021),  Features Intersected: CENTRAL AVE -CR57,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Discuss Lancaster, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.