Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Kutztown University, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 79ft / 24.1mTotal length
  • $2,573,000Total costs
  • 78,046Total average daily traffic
  • 12,665Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kutztown University
  • No street view available for this location

New bridges in Kutztown University, PA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 91970-1979
Reconstructed bridges in Kutztown University, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Kutztown University, PA
Average Bridge Truck Traffic in Kutztown University, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 80.0%Good
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Good
  • 60.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 60.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Good
  • 50.0%Poor
Find on map >>   Show street view

Structure Number: 4797,  Location: S.END OF KUTZTOWN BYPASS (Lat: 40.500167,  Lng: -75.807806),  Route carried "on" structure: US 222,  Year Built: 1934,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 27,221 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 31,347 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB.TO MOSELEM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.009,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $1,109,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 48,  Location: 2 MI.S.OF KUTZTOWN (Lat: 40.507556,  Lng: -75.801961),  Route carried "on" structure: US 222,  Year Built: 1972,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 10,579 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 13,967 (year 2032),  Design Load: HL 93,  Features Intersected: SR 8009SB ON RAMP TO 222
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.867,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.90m (19.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4811,  Location: NORTH END OF BY-PASS (Lat: 40.497311,  Lng: -75.809097),  Route carried "on" structure: US 222,  Year Built: 1972,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 9,731 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 13,969 (year 2032),  Design Load: HS 20,  Features Intersected: SR 8015(RAMP G)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.132,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $23,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $315,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4955,  Location: US 222 INTERCHANGE (Lat: 40.504575,  Lng: -75.805053),  Route carried "on" structure: State highway ,  Year Built: 1972,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 9.63m (31.59ft),  Average Daily Traffic: 2,377 (year 2022),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,029 (year 2032),  Design Load: HS 20,  Features Intersected: US 0222(LR 157),  Facility Carried by Structure: SR 1006 (LR 06139)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.100,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.60m (34.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $1,149,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 544,  Location: 200 FT. S.OF RT.222 (Lat: 40.493236,  Lng: -75.816358),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 200 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 230 (year 2019),  Design Load: HS 20,  Features Intersected: TRIB.TO MOSELEM CREEK,  Facility Carried by Structure: SCHULER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4799,  Location: 2 MI S OF KUTZTOWN (Lat: 40.508000,  Lng: -75.800633),  Route carried "under" structure: Ramp State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 2,162 (year 2022),  Truck Traffic: 7%,  Features Intersected: SR 8009SB ON RAMP TO 222,  Facility Carried by Structure: US 222NB(LR 157)
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 48,  Location: 2 MI.S.OF KUTZTOWN (Lat: 40.507556,  Lng: -75.801961),  Route carried "under" structure: Ramp State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 2,162 (year 2022),  Truck Traffic: 7%,  Features Intersected: SR 8009SB ON RAMP TO 222,  Facility Carried by Structure: US 222SB(LR157)
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 4811,  Location: NORTH END OF BY-PASS (Lat: 40.497311,  Lng: -75.809097),  Route carried "under" structure: Ramp State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 2,442 (year 2022),  Truck Traffic: 7%,  Features Intersected: SR 8015(RAMP G),  Facility Carried by Structure: US 222 SB(LR 157)
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 4955,  Location: US 222 INTERCHANGE (Lat: 40.504575,  Lng: -75.805053),  Route carried "under" structure: US 222,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 10,593 (year 2020),  Truck Traffic: 20%,  Features Intersected: US 0222(LR 157),  Facility Carried by Structure: SR 1006 (LR 06139)
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 41.013,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 4955,  Location: US 222 INTERCHANGE (Lat: 40.504575,  Lng: -75.805053),  Route carried "under" structure: US 222,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 10,579 (year 2020),  Truck Traffic: 22%,  Features Intersected: US 0222(LR 157),  Facility Carried by Structure: SR 1006 (LR 06139)
Minimum Vertical Clearance: 4.79m (15.72ft),  Kilometerpoint: 41.014,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Discuss Kutztown University, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.