Bridge Statistics for Kingsbury, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 154ft / 46.8mTotal length
  • $38,272,000Total costs
  • 28,092Total average daily traffic
  • 1,955Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kingsbury
  • No street view available for this location

New bridges in Kingsbury, NY - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 11920-1929
  • 41930-1939
  • 11940-1949
  • 11980-1989
  • 11990-1999
  • 22000-2009
Reconstructed bridges in Kingsbury, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Kingsbury, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 10.0%Very good
  • 30.0%Good
  • 20.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 20.0%Very good
  • 30.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 40.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
  • 10.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 30.0%Very good
  • 30.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
Find on map >>   Show street view

Structure Number: 103981,  Location: 2.2 MI E JCT US 4 & SH196 (Lat: 43.304703,  Lng: -73.544039),  Route carried "on" structure: State highway 196,  Year Built: 2001,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 6,059 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,360 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: DELAWARE & HUDSON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.540,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.5m (80.4ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $341,000,  Total Project Cost: $923,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103983,  Location: 3.85 MI E JCT RTE 4 & 196 (Lat: 43.309656,  Lng: -73.512944),  Route carried "on" structure: State highway 196,  Year Built: 1930,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 4,104 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,281 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WOOD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.162,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,267,000,  Roadway Improvement Cost: $742,000,  Total Project Cost: $2,008,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 109578,  Location: 2.05 MI E JCT RTE 4 & 196 (Lat: 43.305189,  Lng: -73.547217),  Route carried "on" structure: State highway 196,  Year Built: 2001,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 7,750 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,827 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BOND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.266,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $458,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33058,  Location: 1 MILE SOUTH OF GRANVILLE (Lat: 43.356461,  Lng: -73.487278),  Route carried "on" structure: County highway ,  Year Built: 1928,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 684 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 958 (year 2038),  Design Load: H 20,  Features Intersected: BIG CREEK,  Facility Carried by Structure: ADAMSVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.695,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $417,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $661,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330605,  Location: IN PATTEN MILLS (Lat: 43.377794,  Lng: -73.607533),  Route carried "on" structure: County highway ,  Year Built: 1931,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 1,139 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,409 (year 2040),  Features Intersected: HALFWAY CREEK,  Facility Carried by Structure: CR 35, VAUGHN RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.555,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $598,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330673,  Location: AT PATTENS MILLS (Lat: 43.383003,  Lng: -73.604936),  Route carried "on" structure: Other road ,  Year Built: 1942,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 580 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 812 (year 2037),  Design Load: H 20,  Features Intersected: HALFWAY BROOK,  Facility Carried by Structure: PATTENS MILLS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 90.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 69.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $682,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330678,  Location: 5M NE-HUDSON FALLS-OFF196 (Lat: 43.327603,  Lng: -73.504919),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 47 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 66 (year 2040),  Design Load: HS 20,  Features Intersected: WOOD CREEK,  Facility Carried by Structure: NEW SWAMP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $394,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $625,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 403847,  Location: JCT SH 149 & CHAMP CANAL (Lat: 43.357914,  Lng: -73.493906),  Route carried "on" structure: State highway 149,  Year Built: 1994,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 1,293 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,348 (year 2040),  Design Load: HS 20,  Features Intersected: CHAMPLAIN CANAL
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 17.297,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 83.8m (274.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.47m (27.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $5,491,000,  Roadway Improvement Cost: $3,215,000,  Total Project Cost: $8,706,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 403982,  Location: JCT SH 196 & CHAMP CANAL (Lat: 43.304072,  Lng: -73.539525),  Route carried "on" structure: State highway 196,  Year Built: 1938,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 6,059 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,360 (year 2040),  Design Load: H 20,  Features Intersected: DIKE ROAD, CHAMPLAIN CAN
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 3.878,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.7m (22.0ft), Horizontal Clearance: 51.8m (169.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 56.4m (185.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.63m (34.88ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $9,671,000,  Roadway Improvement Cost: $5,663,000,  Total Project Cost: $15,334,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 441808,  Location: SOUTH OF FORT ANN (Lat: 43.390064,  Lng: -73.486342),  Route carried "on" structure: Other road ,  Year Built: 1911,  Year Reconstructed: 2017,  Status: Posted for load,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 293 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 410 (year 2037),  Features Intersected: CHAMPLAIN CANAL,  Facility Carried by Structure: BALDWIN CORNERS RD
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 0.531,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Navigation Control: Yes ( Vertical Clearance: 4.8m (15.7ft), Horizontal Clearance: 13.7m (44.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.52m (24.67ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $2,429,000,  Roadway Improvement Cost: $1,422,000,  Total Project Cost: $3,851,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 441809,  Location: JCT N SWAMP RD & CHAMP C (Lat: 43.331703,  Lng: -73.510442),  Route carried "on" structure: Other road ,  Year Built: 1911,  Status: Posted for load,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 47 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 66 (year 2040),  Features Intersected: CHAMPLAIN CANAL,  Facility Carried by Structure: NEW SWAMP ROAD
Minimum Vertical Clearance: 4.11m (13.48ft),  Kilometerpoint: 2.832,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Navigation Control: Yes ( Vertical Clearance: 4.8m (15.7ft), Horizontal Clearance: 13.7m (44.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 55.1m (180.8ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 8.59m (28.18ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $2,792,000,  Roadway Improvement Cost: $1,635,000,  Total Project Cost: $4,426,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 403982,  Location: JCT SH 196 & CHAMP CANAL (Lat: 43.304072,  Lng: -73.539525),  Route carried "under" structure: ServiceOther road ,  Year Built: 1938,  Structure Length: 0. m,  Average Daily Traffic: 37 (year 1985),  Features Intersected: DIKE ROAD, CHAMPLAIN CAN,  Facility Carried by Structure: RTE 196
Minimum Vertical Clearance: 4.01m (13.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 56.4m (185.0ft)