Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Jacksons' Gap, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 128ft / 39.5mTotal length
  • $16,769,000Total costs
  • 41,161Total average daily traffic
  • 4,417Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jacksons' Gap
  • No street view available for this location

New bridges in Jacksons' Gap, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 21950-1959
  • 11980-1989
  • 41990-1999
  • 22000-2009
Average Bridge Daily Traffic in Jacksons' Gap, AL
Average Bridge Truck Traffic in Jacksons' Gap, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Fair
  • 25.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Fair
  • 25.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Good
  • 55.6%Satisfactory
  • 11.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Very good
  • 42.9%Good
  • 42.9%Satisfactory
Find on map >>   Show street view

Structure Number: 202,  Location: 2.8 M N US 280 (Lat: 32.896631,  Lng: -85.832681),  Route carried "on" structure: County highway 312,  Year Built: 1922,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 70 (year 2008),  Average Future Daily Traffic: 85 (year 2030),  Features Intersected: GIN HOUSE BRANCH,  Facility Carried by Structure: ABBETT DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $187,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 734,  Location: JACKSONS GAP (Lat: 32.883333,  Lng: -85.820000),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 1,000 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,000 (year 2041),  Design Load: H 15,  Features Intersected: CENTRAL OF GA RAIL-ROAD,  Facility Carried by Structure: MAIN ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $533,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $586,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3931,  Location: 4.5 M N CO RD 308 (Lat: 32.945033,  Lng: -85.789022),  Route carried "on" structure: County highway 396,  Year Built: 1950,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 255 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 395 (year 2030),  Features Intersected: MOORES CREEK,  Facility Carried by Structure: ROCK SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $533,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $586,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6067,  Location: 0.3 M E OF CO RD 308 (Lat: 32.885000,  Lng: -85.800000),  Route carried "on" structure: County highway 303,  Year Built: 1957,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 400 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 600 (year 2041),  Features Intersected: MCNOY CREEK,  Facility Carried by Structure: MANOY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.6m (18.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $393,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13419,  Location: 2 MI N CO RD 305 (Lat: 32.860372,  Lng: -85.818694),  Route carried "on" structure: County highway 319,  Year Built: 1984,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 255 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 395 (year 2030),  Design Load: HS 20,  Features Intersected: MANOY CREEK,  Facility Carried by Structure: MADWIND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $484,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15563,  Location: .4 MI. N.BARBOUR CO.20 (Lat: 31.744567,  Lng: -85.390133),  Route carried "on" structure: State highway 131,  Year Built: 1992,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,130 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,516 (year 2033),  Design Load: HS 20,  Features Intersected: HAMM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.888,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 69.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $774,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $851,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15721,  Location: BETW. WILSON * PRICE AVE (Lat: 30.737158,  Lng: -88.083364),  Route carried "on" structure: ServiceInterstate 165,  Year Built: 1993,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 4,300 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,450 (year 2037),  Design Load: HS 20,  Features Intersected: TOULMINS SPRINGS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.625,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 15.4m (50.5ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.05m (6.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,016,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,118,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15724,  Location: 0.5 M E JCT SR 2 & SR 13 (Lat: 34.707061,  Lng: -87.658086),  Route carried "on" structure: State highway 20,  Year Built: 1993,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 8,645 (year 2020),  Truck Traffic: 23%,  Average Future Daily Traffic: 11,643 (year 2033),  Design Load: HS 20,  Features Intersected: SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.622,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.11m (20.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,760,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,936,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15772,  Location: 1 MI.W. JCT. SR-85 (Lat: 31.305517,  Lng: -85.743767),  Route carried "on" structure: US 84,  Year Built: 1993,  Status: Open,  Structure Length: 21.88m (71.78ft),  Average Daily Traffic: 9,465 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,698 (year 2033),  Design Load: HS 20,  Features Intersected: CLAYBANK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 301.556,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 13,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.88m (71.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $6,303,000,  Roadway Improvement Cost: $630,000,  Total Project Cost: $6,933,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17123,  Location: .5 MI E CHIP MILL-U.S.280 (Lat: 32.873333,  Lng: -85.809139),  Route carried "on" structure: US 280,  Year Built: 2003,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 14,811 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 20,735 (year 2039),  Design Load: HS 20,  Features Intersected: MANOY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 125.257,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,005,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $2,206,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18385,  Location: 0.6 MI N INT AL HWY 49 N (Lat: 32.929383,  Lng: -85.765744),  Route carried "on" structure: County highway 103,  Year Built: 2002,  Status: Open,  Structure Length: 1.93m (6.33ft),  Average Daily Traffic: 180 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 280 (year 2030),  Design Load: HS 20,  Features Intersected: JAYBIRD CREEK,  Facility Carried by Structure: CHURCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.2m (46.6ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.66m (8.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,354,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,489,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 215,  Location: JACKSON'S GAP (Lat: 32.873500,  Lng: -85.804000),  Route carried "under" structure: City street ,  Year Built: 1924,  Structure Length: 0. m,  Average Daily Traffic: 650 (year 1988),  Truck Traffic: 1%,  Features Intersected: CITY STREET,  Facility Carried by Structure: CENTRAL OF GA RR
Minimum Vertical Clearance: 3.91m (12.83ft),  Kilometerpoint: 1.799,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Discuss Jacksons' Gap, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.