Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Jacksonburg, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 89ft / 27.1mTotal length
  • $5,090,000Total costs
  • 7,221Total average daily traffic
  • 577Total average daily truck traffic
  • 9,618Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jacksonburg
  • No street view available for this location

New bridges in Jacksonburg, WV - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 11920-1929
  • 21930-1939
  • 21970-1979
  • 21980-1989
  • 22000-2009
  • 22010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 70.0%Good
  • 10.0%Satisfactory
  • 20.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 46.2%Good
  • 15.4%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 53.8%Good
  • 15.4%Satisfactory
  • 23.1%Fair
  • 7.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.8%Good
  • 23.1%Satisfactory
  • 38.5%Fair
  • 7.7%Poor
Find on map >>   Show street view

Structure Number: 52A043,  Location: 0.01 MI WEST JCT CR 60 (Lat: 39.580119,  Lng: -80.630350),  Route carried "on" structure: County highway 15,  Year Built: 1989,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 343 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MAUD RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.012,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.2m (20.3ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $155,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $308,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52A045,  Location: 0.01 mi. East jct CR19 (Lat: 39.579450,  Lng: -80.591811),  Route carried "on" structure: County highway 15,  Year Built: 1984,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 300 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 420 (year 2039),  Design Load: HS 20,  Features Intersected: Willey Fork
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.567,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $75,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $85,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52A046,  Location: 0.02 mi. South jct CR 15 (Lat: 39.568350,  Lng: -80.582481),  Route carried "on" structure: County highway 152,  Year Built: 1917,  Status: Posted for load,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 61 (year 2040),  Features Intersected: North Fork Fishing Creek,  Facility Carried by Structure: County Route 15/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.341,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $583,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 52A062,  Location: 0.10 mi North jct CR20/10 (Lat: 39.521989,  Lng: -80.627069),  Route carried "on" structure: State highway 20,  Year Built: 1938,  Status: Posted for load,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 1,700 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,074 (year 2040),  Design Load: H 15,  Features Intersected: South Fork Fishing Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.850,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.4m (50.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $551,000,  Roadway Improvement Cost: $534,000,  Total Project Cost: $1,194,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52A063,  Location: 0.07 mi. South jct C20/10 (Lat: 39.525861,  Lng: -80.631389),  Route carried "on" structure: State highway 20,  Year Built: 1938,  Status: Posted for load,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 1,700 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,380 (year 2040),  Design Load: H 15,  Features Intersected: South Fork Fishing Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.429,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $551,000,  Roadway Improvement Cost: $534,000,  Total Project Cost: $1,194,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52A09,  Location: 0.01 mi. South jct CR56 (Lat: 39.515769,  Lng: -80.694161),  Route carried "on" structure: County highway 5601,  Year Built: 1974,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 61 (year 2038),  Design Load: HS 20,  Features Intersected: Piney Fork,  Facility Carried by Structure: County Route 56/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.6m (31.5ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $322,000 ( Estimate for 2018),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 52A095,  Location: 0.03 mi. East CR15/2 (Lat: 39.534550,  Lng: -80.609889),  Route carried "on" structure: County highway 76,  Year Built: 1918,  Status: Temporarily open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 61 (year 2040),  Features Intersected: North Fork Richwood Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.251,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $417,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 52A099,  Location: 0.01 mi. South jct CR 82 (Lat: 39.491611,  Lng: -80.635031),  Route carried "on" structure: County highway 821,  Year Built: 1920,  Status: Posted for load,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 69 (year 2039),  Features Intersected: Buffalo Run,  Facility Carried by Structure: County Route 82/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $237,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $659,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 52A112,  Location: 2.00 mi. East jct WV20 (Lat: 39.553889,  Lng: -80.624239),  Route carried "on" structure: County highway 204,  Year Built: 1979,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 61 (year 2039),  Design Load: HS 20,  Features Intersected: Upper Run,  Facility Carried by Structure: County Route 20/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $165,000,  Roadway Improvement Cost: $163,000,  Total Project Cost: $328,000 ( Estimate for 2019),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 52A14,  Location: 0.03 mi. South jct WV20 (Lat: 39.532431,  Lng: -80.642439),  Route carried "on" structure: County highway 82,  Year Built: 2004,  Status: Open,  Structure Length: 4.71m (15.45ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 548 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: South Fork Fishing Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52A143,  Location: 0.08 mi. South jct CR 76 (Lat: 39.527281,  Lng: -80.638561),  Route carried "on" structure: State highway 20,  Year Built: 2006,  Status: Open,  Structure Length: 2.18m (7.15ft),  Average Daily Traffic: 1,900 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,660 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Richwood Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.089,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52A155,  Location: 0.03 mi. East jct CR62 (Lat: 39.586989,  Lng: -80.618031),  Route carried "on" structure: County highway 15,  Year Built: 2011,  Status: Open,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 305 (year 2040),  Design Load: HL 93,  Features Intersected: Four Mile Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.799,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 52A157,  Location: 0.32 mi. South jct WV 20 (Lat: 39.529481,  Lng: -80.644239),  Route carried "on" structure: County highway 82,  Year Built: 2012,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 471 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 575 (year 2037),  Design Load: HL 93,  Features Intersected: Buffalo Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Jacksonburg, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.