Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Intercourse, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 79ft / 24.1mTotal length
  • $3,616,000Total costs
  • 24,957Total average daily traffic
  • 2,924Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Intercourse
  • No street view available for this location

New bridges in Intercourse, PA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 21930-1939
  • 11950-1959
  • 31970-1979
  • 21980-1989
  • 11990-1999
  • 12010-2019
Reconstructed bridges in Intercourse, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Intercourse, PA
Average Bridge Truck Traffic in Intercourse, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 11.1%Good
  • 44.4%Satisfactory
  • 11.1%Fair
  • 22.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 11.1%Good
  • 55.6%Satisfactory
  • 11.1%Poor
  • 11.1%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 11.1%Good
  • 33.3%Satisfactory
  • 33.3%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.1%Satisfactory
  • 77.8%Fair
  • 11.1%Poor
Find on map >>   Show street view

Structure Number: 21336,  Location: 1 MI.N.W. INTERCOURSE (Lat: 40.050139,  Lng: -76.123406),  Route carried "on" structure: State highway 772,  Year Built: 1980,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 3,449 (year 2022),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,426 (year 2032),  Design Load: HS 20,  Features Intersected: MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.412,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 21339,  Location: 2 MI S.E. OF INTERCOURSE (Lat: 40.023578,  Lng: -76.070897),  Route carried "on" structure: State highway 772,  Year Built: 1956,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 6,552 (year 2022),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,662 (year 2032),  Design Load: HS 20,  Features Intersected: CAT TAIL RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.027,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21962,  Location: 3/4 MI EAST OF T-692 (Lat: 40.065114,  Lng: -76.134556),  Route carried "on" structure: City street ,  Year Built: 1921,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 365 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 490 (year 2031),  Features Intersected: MILL CREEK,  Facility Carried by Structure: T-535 MSSR SCHL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $42,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21963,  Location: 2 MI SOUTH OF SR 772 (Lat: 40.014669,  Lng: -76.096661),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 1,035 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,385 (year 2031),  Design Load: H 20,  Features Intersected: PEQUEA CREEK,  Facility Carried by Structure: T-540 FROGTOWN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21964,  Location: 1 MI NORTH OF SR 772 (Lat: 40.066494,  Lng: -76.126394),  Route carried "on" structure: City street ,  Year Built: 1917,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 300 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2031),  Features Intersected: MILL CREEK,  Facility Carried by Structure: T-773 GROFFDALE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $14,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $186,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21965,  Location: 1000 FT NORTH OF SR 772 (Lat: 40.064436,  Lng: -76.146967),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 620 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 830 (year 2031),  Features Intersected: MILL CREEK,  Facility Carried by Structure: T-692 HESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $200,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21966,  Location: 3/4 MI NORTH OF SR 340 (Lat: 40.047514,  Lng: -76.145275),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 415 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 555 (year 2031),  Features Intersected: MUDDY RUN,  Facility Carried by Structure: T-774 N HARVEST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22012,  Location: 1200 FT SW OF SR 772 (Lat: 40.017933,  Lng: -76.069789),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Closed,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 680 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2032),  Design Load: HS 20,  Features Intersected: PEQUEA CREEK,  Facility Carried by Structure: PEQUEA VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Imminent failure,  Substructure: Poor,  Channel: Poor,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $174,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31397,  Location: 1.6 MILE NORTH OF TR 281 (Lat: 40.046667,  Lng: -76.060000),  Route carried "on" structure: State highway ,  Year Built: 1972,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 10.70m (35.10ft),  Average Daily Traffic: 1,693 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,084 (year 2032),  Design Load: HS 20,  Features Intersected: US 219,  Facility Carried by Structure: T524 SECHLAR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.40m (43.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $712,000,  Total Project Cost: $3,014,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 52594,  Location: 3/4 mi south of SR 772 (Lat: 40.019464,  Lng: -76.085689),  Route carried "on" structure: City street ,  Year Built: 2015,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 680 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 910 (year 2032),  Design Load: HL 93,  Features Intersected: Pequea Creek,  Facility Carried by Structure: Osceola Mill Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Fair,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31397,  Location: 1.6 MILE NORTH OF TR 281 (Lat: 40.046667,  Lng: -76.060000),  Route carried "under" structure: US 219,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 4,445 (year 2020),  Truck Traffic: 11%,  Features Intersected: US 219,  Facility Carried by Structure: T524 SECHLAR ROAD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 40.887,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 31397,  Location: 1.6 MILE NORTH OF TR 281 (Lat: 40.046667,  Lng: -76.060000),  Route carried "under" structure: US 219,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 4,723 (year 2020),  Truck Traffic: 7%,  Features Intersected: US 219,  Facility Carried by Structure: T524 SECHLAR ROAD
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 40.932,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Discuss Intercourse, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.