Bridge Statistics for Indiahoma, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 259ft / 79.1mTotal length
  • $19,493,000Total costs
  • 34,882Total average daily traffic
  • 8,348Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Indiahoma
  • No street view available for this location

New bridges in Indiahoma, OK - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 11950-1959
  • 71970-1979
  • 11980-1989
  • 81990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Indiahoma, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Indiahoma, OK
Average Bridge Truck Traffic in Indiahoma, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.3%Very good
  • 26.7%Good
  • 33.3%Satisfactory
  • 26.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Very good
  • 20.0%Good
  • 26.7%Satisfactory
  • 13.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 20.0%Good
  • 26.7%Satisfactory
  • 20.0%Fair
  • 13.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.0%Very good
  • 30.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 5.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 28.6%Very good
  • 42.9%Satisfactory
  • 28.6%Serious
Find on map >>   Show street view

Structure Number: 3183,  Location: 1.1 MI W INDIAHOMA (Lat: 34.622922,  Lng: -98.772906),  Route carried "on" structure: County highway 1620C,  Year Built: 1930,  Status: Posted for load,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 321 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 514 (year 2040),  Design Load: H 15,  Features Intersected: BIG SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.987,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.16m (23.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $365,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $584,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3217,  Location: 1.9 S 4.4 W OF US 62 (Lat: 34.613744,  Lng: -98.708719),  Route carried "on" structure: County highway 6103,  Year Built: 1930,  Status: Posted for load,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 731 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,170 (year 2040),  Design Load: H 15,  Features Intersected: POST OAK CREEK,  Facility Carried by Structure: FAS 1620C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.425,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 28.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 8.82m (28.94ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Critical Feature Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2020,  Bridge Improvement Cost: $451,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $702,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5801,  Location: 1.5 S 7.6 E OF US62-SH115 (Lat: 34.621258,  Lng: -98.765128),  Route carried "on" structure: County highway 1620C,  Year Built: 1938,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 321 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 514 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.633,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5804,  Location: 1.9 S 5.9 W OF US 62-S115 (Lat: 34.614925,  Lng: -98.736558),  Route carried "on" structure: County highway 1603,  Year Built: 1938,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 731 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,170 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: FAS 1620C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.367,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Poor,  Culverts: Serious,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6177,  Location: 1.2 S 9.9 W OF US 62 (Lat: 34.623453,  Lng: -98.806803),  Route carried "on" structure: County highway 1620C,  Year Built: 1938,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 207 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 331 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 14119,  Location: 1.5 MI S INDIAHOMA (Lat: 34.596308,  Lng: -98.755783),  Route carried "on" structure: County highway 1629,  Year Built: 1958,  Status: Posted for load,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 221 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 354 (year 2040),  Design Load: H 15,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: 1686C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.137,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.45m (24.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $648,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18167,  Location: 3.37 MI. E. KIOWA CL (Lat: 34.630525,  Lng: -98.766711),  Route carried "on" structure: US 62,  Year Built: 1972,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 7,840 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.422,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 90.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $365,000,  Roadway Improvement Cost: $601,000,  Total Project Cost: $1,021,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18171,  Location: 4.68 MI. E. KIOWA CL (Lat: 34.630794,  Lng: -98.743611),  Route carried "on" structure: US 62,  Year Built: 1972,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 7,840 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.530,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18173,  Location: 6.59 MI. E. KIOWA CL (Lat: 34.631425,  Lng: -98.710300),  Route carried "on" structure: US 62,  Year Built: 1972,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 5,700 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 9,120 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.602,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 45.1m (148.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18297,  Location: 2.72 MI. E. KIOWA CL (Lat: 34.631092,  Lng: -98.778111),  Route carried "on" structure: US 62,  Year Built: 1972,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 2,550 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 4,080 (year 2040),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.376,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.77m (25.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $644,000,  Roadway Improvement Cost: $1,063,000,  Total Project Cost: $1,805,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 18338,  Location: 3.20 MI. E. KIOWA CL (Lat: 34.631117,  Lng: -98.770008),  Route carried "on" structure: US 62,  Year Built: 1972,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 2,550 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 4,080 (year 2040),  Design Load: HS 20,  Features Intersected: SLWC R.R. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.148,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 16 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $655,000,  Roadway Improvement Cost: $1,080,000,  Total Project Cost: $1,833,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 18339,  Location: 5.94 MI. E. KIOWA CL (Lat: 34.631231,  Lng: -98.721686),  Route carried "on" structure: US 62,  Year Built: 1972,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 4,960 (year 2040),  Design Load: HS 20,  Features Intersected: POST CR & CO RD UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.556,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.95m (32.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $797,000,  Roadway Improvement Cost: $1,315,000,  Total Project Cost: $2,232,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21812,  Location: 4.2 S 4.5 W OFUS62-SH115 (Lat: 34.580025,  Lng: -98.710475),  Route carried "on" structure: County highway E1680,  Year Built: 1988,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Fair,  Culverts: Serious,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23397,  Location: 2.72 MI. E. KIOWA CL (Lat: 34.630792,  Lng: -98.778117),  Route carried "on" structure: US 62,  Year Built: 1993,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 2,450 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 3,920 (year 2040),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.376,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.77m (25.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $644,000,  Roadway Improvement Cost: $1,063,000,  Total Project Cost: $1,805,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23398,  Location: 3.20 MI. E. KIOWA CL (Lat: 34.630817,  Lng: -98.769400),  Route carried "on" structure: US 62,  Year Built: 1993,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 2,450 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 3,920 (year 2040),  Design Load: HS 20,  Features Intersected: SLWC R.R. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.148,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 16 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $655,000,  Roadway Improvement Cost: $1,080,000,  Total Project Cost: $1,833,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24333,  Location: 6.W 4.5 S OF US62-SH115 (Lat: 34.578422,  Lng: -98.738325),  Route carried "on" structure: County highway N2380,  Year Built: 1996,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.33m (27.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $661,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24804,  Location: 3.2 S 5.1 W OF US 62/115 (Lat: 34.594622,  Lng: -98.722642),  Route carried "on" structure: County highway E1670,  Year Built: 1997,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $397,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24931,  Location: 5.94 MI. E. KIOWA CL (Lat: 34.630928,  Lng: -98.721475),  Route carried "on" structure: US 62,  Year Built: 1997,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 2,850 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 4,560 (year 2040),  Design Load: HS 20,  Features Intersected: POST CR & CO RD UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.556,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.98m (32.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $799,000,  Roadway Improvement Cost: $1,318,000,  Total Project Cost: $2,236,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 25092,  Location: 2.2 S 10.2 W OF US62-S115 (Lat: 34.608950,  Lng: -98.809933),  Route carried "on" structure: County highway E1660,  Year Built: 1997,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.26m (13.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $346,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 25097,  Location: 5.W 3.3 S OF US62-SH115 (Lat: 34.593811,  Lng: -98.720653),  Route carried "on" structure: County highway N2390,  Year Built: 1996,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.52m (11.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $285,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27272,  Location: 2N OF US62; 2.5W FT.SILL (Lat: 34.652778,  Lng: -98.798056),  Route carried "on" structure: County highway E1630,  Year Built: 2009,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $286,000,  Total Project Cost: $917,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31018,  Location: 2S 2.5E OF INDIAHOMA (Lat: 34.594656,  Lng: -98.712211),  Route carried "on" structure: County highway E1670,  Year Built: 2013,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: POST OAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18339,  Location: 5.94 MI. E. KIOWA CL (Lat: 34.631231,  Lng: -98.721686),  Route carried "under" structure: County highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Features Intersected: POST CR & CO RD UNDER,  Facility Carried by Structure: U.S. 62
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 9.556,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 24931,  Location: 5.94 MI. E. KIOWA CL (Lat: 34.630928,  Lng: -98.721475),  Route carried "under" structure: County highway ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Features Intersected: POST CR & CO RD UNDER,  Facility Carried by Structure: U.S. 62
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 9.556,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)