Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hundred, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 118ft / 36.0mTotal length
  • $2,712,000Total costs
  • 13,640Total average daily traffic
  • 967Total average daily truck traffic
  • 19,023Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hundred
  • No street view available for this location

New bridges in Hundred, WV - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11920-1929
  • 31930-1939
  • 31970-1979
  • 21990-1999
  • 62000-2009
  • 32010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Very good
  • 50.0%Good
  • 11.1%Satisfactory
  • 16.7%Fair
  • 16.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 55.6%Good
  • 5.6%Satisfactory
  • 27.8%Fair
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 16.7%Satisfactory
  • 38.9%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Very good
  • 44.4%Good
  • 5.6%Satisfactory
  • 27.8%Fair
  • 16.7%Poor
Find on map >>   Show street view

Structure Number: 52A038,  Location: 0.08 Mi. North Jct CR64/1 (Lat: 39.670231,  Lng: -80.452711),  Route carried "on" structure: County highway 13,  Year Built: 1930,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 305 (year 2039),  Features Intersected: Rush Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.178,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $134,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $444,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52A039,  Location: 0.13 mi. South jct US250 (Lat: 39.672539,  Lng: -80.452281),  Route carried "on" structure: County highway 13,  Year Built: 1898,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 305 (year 2040),  Design Load: HS 20,  Features Intersected: WV Fork Fish Creek
Minimum Vertical Clearance: 3.05m (10.01ft),  Kilometerpoint: 7.467,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 3.9m (12.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $32,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $46,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 52A048,  Location: 0.60 mi. North jct US 250 (Lat: 39.699739,  Lng: -80.467661),  Route carried "on" structure: County highway 16,  Year Built: 1990,  Status: Posted for load,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 244 (year 2039),  Design Load: HS 20,  Features Intersected: Rock Camp Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.6m (21.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: April 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $104,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $207,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52A091,  Location: 0.06 mi. South jct CR64/6 (Lat: 39.653439,  Lng: -80.486331),  Route carried "on" structure: County highway 64,  Year Built: 1971,  Status: Open,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 488 (year 2039),  Design Load: HS 20,  Features Intersected: Long Drain
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.1m (59.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $14,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52A094,  Location: 0.01 mi. South jct CR69/1 (Lat: 39.699481,  Lng: -80.435531),  Route carried "on" structure: State highway 69,  Year Built: 1928,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,400 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,960 (year 2039),  Features Intersected: Cappo Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.106,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $26,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52A102,  Location: 0.02 mi. South jct WV 69 (Lat: 39.683439,  Lng: -80.459061),  Route carried "on" structure: US 250,  Year Built: 1933,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,400 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,928 (year 2039),  Features Intersected: Church Fork Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.244,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.0m (39.4ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $173,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $360,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52A103,  Location: 0.06 mi. North jct CR16 (Lat: 39.690800,  Lng: -80.470231),  Route carried "on" structure: US 250,  Year Built: 1994,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,644 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Rock Camp Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.063,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.7m (41.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $38,000,  Total Project Cost: $38,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52A104,  Location: 0.50 MI NORTH JCT CR 16 (Lat: 39.689761,  Lng: -80.476939),  Route carried "on" structure: US 25000,  Year Built: 1979,  Status: Open,  Structure Length: 2.58m (8.46ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,644 (year 2039),  Design Load: HS 20,  Features Intersected: WV FORK OF FISH CREEK,  Facility Carried by Structure: US ROUTE 250
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.771,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $74,000,  Total Project Cost: $74,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52A105,  Location: 0.58 MI NORTH JCT CR 16 (Lat: 39.689631,  Lng: -80.478211),  Route carried "on" structure: US 25000,  Year Built: 1979,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,644 (year 2039),  Design Load: HS 20,  Features Intersected: WV FORK OF FISH CREEK,  Facility Carried by Structure: UNITED STATES 250
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.900,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $90,000,  Total Project Cost: $90,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52A116,  Location: 0.08 mi. West jct US 250 (Lat: 39.675289,  Lng: -80.454900),  Route carried "on" structure: State highway 7,  Year Built: 1936,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,400 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,960 (year 2039),  Design Load: H 15,  Features Intersected: WV Fork of Fish Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.881,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.6m (18.4ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $583,000,  Roadway Improvement Cost: $577,000,  Total Project Cost: $1,413,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 52A127,  Location: 0.02 mi. West jct US250 (Lat: 39.686561,  Lng: -80.459511),  Route carried "on" structure: Alternate County highway 25011,  Year Built: 2000,  Status: Open,  Structure Length: 2.73m (8.96ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 61 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: Fish Creek,  Facility Carried by Structure: CR 250/11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52A128,  Location: 0.01 mi. South jct WV 69 (Lat: 39.685031,  Lng: -80.453900),  Route carried "on" structure: County highway 6902,  Year Built: 2001,  Status: Open,  Structure Length: 1.63m (5.35ft),  Average Daily Traffic: 50 (year 2018),  Average Future Daily Traffic: 61 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: Church Fork,  Facility Carried by Structure: County Route 69/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52A135,  Location: 0.01 mi. South jct CR64/2 (Lat: 39.630450,  Lng: -80.479181),  Route carried "on" structure: County highway 64,  Year Built: 2003,  Status: Open,  Structure Length: 2.55m (8.37ft),  Average Daily Traffic: 350 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 427 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Long Drain
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.331,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52A138,  Location: 0.01 mi. West jct US250 (Lat: 39.675431,  Lng: -80.453989),  Route carried "on" structure: State highway 7,  Year Built: 2003,  Status: Open,  Structure Length: 2.67m (8.76ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,532 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Abandoned RR Property
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.945,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52A139,  Location: 0.12 mi. West jct US250 (Lat: 39.683319,  Lng: -80.459839),  Route carried "on" structure: County highway 25012,  Year Built: 2005,  Status: Open,  Structure Length: 1.50m (4.92ft),  Average Daily Traffic: 90 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 110 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WV Fork of Fish Creek,  Facility Carried by Structure: County Rt. 250/12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.9m (45.6ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 52A148,  Location: 0.01 mi. South jct CR64/1 (Lat: 39.642739,  Lng: -80.481739),  Route carried "on" structure: County highway 64,  Year Built: 2009,  Status: Open,  Structure Length: 2.91m (9.55ft),  Average Daily Traffic: 400 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 548 (year 2038),  Features Intersected: Long Drain
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52A156,  Location: 0.06 Mi. West Jct. CR 12 (Lat: 39.660289,  Lng: -80.484750),  Route carried "on" structure: State highway 7,  Year Built: 2012,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 1,400 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,918 (year 2038),  Design Load: HL 93,  Features Intersected: Long Drain Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.745,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 77.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52A16,  Location: 0.01 mi. East jct US 250 (Lat: 39.692161,  Lng: -80.466919),  Route carried "on" structure: County highway 2509,  Year Built: 2013,  Status: Open,  Structure Length: 2.17m (7.12ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 61 (year 2040),  Design Load: HL 93,  Features Intersected: WV Fork of Fish Creek,  Facility Carried by Structure: County Route 250/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.6m (67.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52A902,  Location: 0.03 Mi. South Jct WV 69 (Lat: 39.683619,  Lng: -80.458061),  Route carried "on" structure: City street N0099,  Year Built: 2013,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 183 (year 2040),  Design Load: HL 93,  Features Intersected: Church Fork,  Facility Carried by Structure: Wetzel Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 0.0m,  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Hundred, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.