Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hopeland, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 62ft / 19.2mTotal length
  • $1,151,000Total costs
  • 94,486Total average daily traffic
  • 19,270Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hopeland
  • No street view available for this location

New bridges in Hopeland, PA - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 41950-1959
  • 11970-1979
  • 22000-2009
  • 32010-2019
Average Bridge Daily Traffic in Hopeland, PA
Average Bridge Truck Traffic in Hopeland, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 42.9%Very good
  • 42.9%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Excellent
  • 28.6%Very good
  • 57.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Very good
  • 57.1%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 16.7%Fair
  • 16.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 14027,  Location: 1.0 MI W OF SR 2013 (Lat: 40.196253,  Lng: -77.017328),  Route carried "on" structure: State highway ,  Year Built: 1950,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 4,219 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,418 (year 2030),  Design Load: HS 20,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: LR21017,SR2011
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $23,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $308,000,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21448,  Location: MIDDLECRK WILDLIFE REFUGE (Lat: 40.264503,  Lng: -76.238367),  Route carried "on" structure: State highway ,  Year Built: 1971,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 1,325 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,390 (year 2032),  Design Load: HS 20,  Features Intersected: MIDDLE CREEK,  Facility Carried by Structure: SR 1035 Klienfelt
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.168,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: April 2019,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $468,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21772,  Location: CLAY TWP (Lat: 40.236867,  Lng: -76.276106),  Route carried "on" structure: City street ,  Year Built: 1949,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 200 (year 1991),  Truck Traffic: 9%,  Average Future Daily Traffic: 319 (year 2030),  Design Load: HS 20,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: T-596
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $14,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $183,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21773,  Location: 1MI N HOPELAND (Lat: 40.239658,  Lng: -76.256281),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 143 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 210 (year 2030),  Design Load: HS 20,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: T-660, LR 36128
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $14,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $192,000,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 42221,  Location: AT SR 1035 INTERSECT (Lat: 40.248644,  Lng: -76.249589),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 105 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 145 (year 2031),  Features Intersected: MIDDLE CREEK,  Facility Carried by Structure: T705 MTN SPRING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.00m (22.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $54,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 45387,  Location: Newtown (Lat: 40.235531,  Lng: -76.247181),  Route carried "on" structure: State highway ,  Year Built: 2009,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 1,155 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,245 (year 2032),  Design Load: HL 93,  Features Intersected: Middle Creek,  Facility Carried by Structure: SR 1026 Mt.Airy
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.410,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 53581,  Location: 0.5 MILE S HOPELAND (Lat: 40.229669,  Lng: -76.258119),  Route carried "on" structure: State highway ,  Year Built: 2016,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 984 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,253 (year 2032),  Design Load: HL 93,  Features Intersected: Middle Creek,  Facility Carried by Structure: SR 1035; TWP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.842,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 53865,  Location: VILLAGE OF CLAY (Lat: 40.219147,  Lng: -76.257272),  Route carried "on" structure: US 322,  Year Built: 2018,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 10,117 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,157 (year 2032),  Design Load: HL 93,  Features Intersected: MIDDLE CREEK,  Facility Carried by Structure: 28th DIVISION HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.108,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Maintenance Responsibility: Private,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 53877,  Location: 0.7 MI NORTH OF NEWTOWN (Lat: 40.245275,  Lng: -76.248869),  Route carried "on" structure: State highway ,  Year Built: 2017,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,325 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,470 (year 2032),  Design Load: HL 93,  Features Intersected: MIDDLE CREEK,  Facility Carried by Structure: KLIENFELTERSVIL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.716,  Lanes on structure: 2,  Owner: State Highway Agency,  Maintenance Responsibility: Private,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21772,  Location: CLAY TWP (Lat: 40.236867,  Lng: -76.276106),  Route carried "under" structure: Interstate 76,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 24,971 (year 2001),  Truck Traffic: 24%,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: T-596
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 21773,  Location: 1MI N HOPELAND (Lat: 40.239658,  Lng: -76.256281),  Route carried "under" structure: Interstate 76,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 24,971 (year 2001),  Truck Traffic: 24%,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: T-660, LR 36128
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 21775,  Location: 05 MILE N OF NEWTOWN (Lat: 40.241000,  Lng: -76.249472),  Route carried "under" structure: Interstate 76,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 24,971 (year 2001),  Truck Traffic: 24%,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: SR 1035, LR 36011
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 25.6m (84.0ft)

Discuss Hopeland, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.