Bridge Statistics for Hood River, Oregon (OR)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 886ft / 270mTotal length
  • $37,212,000Total costs
  • 268,705Total average daily traffic
  • 70,517Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hood River
  • No street view available for this location

New bridges in Hood River, OR - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 81950-1959
  • 61960-1969
  • 31970-1979
  • 11980-1989
  • 22000-2009
Average Bridge Daily Traffic in Hood River, OR
Average Bridge Truck Traffic in Hood River, OR
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Very good
  • 28.6%Good
  • 50.0%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Very good
  • 14.3%Good
  • 64.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 42.9%Satisfactory
  • 7.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 200A026 10236,  Location: AT ECL HOOD RIVER (Lat: 45.707950,  Lng: -121.505589),  Route carried "on" structure: US 35,  Year Built: 1982,  Status: Open,  Structure Length: 20.67m (67.81ft),  Average Daily Traffic: 7,696 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,300 (year 2040),  Design Load: HS 20,  Features Intersected: HOOD RIVER & UPRR,  Facility Carried by Structure: HWY 100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.254,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 7.0m (23.0ft), Horizontal Clearance: 34.4m (112.9ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 3,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2443 002 06341,  Location: IN HOOD RIVER (Lat: 45.713000,  Lng: -121.522569),  Route carried "on" structure: Interstate 84,  Year Built: 1953,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 18.26m (59.91ft),  Average Daily Traffic: 14,157 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 18,750 (year 2040),  Design Load: HS 20,  Features Intersected: UPRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 102.049,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 9,  Number Of Approach Spans: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 2444 002 06415,  Location: AT HOOD RIVER (Lat: 45.710350,  Lng: -121.507689),  Route carried "on" structure: Interstate 84,  Year Built: 1953,  Status: Open,  Structure Length: 11.22m (36.81ft),  Average Daily Traffic: 14,157 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 18,750 (year 2040),  Design Load: HS 20,  Features Intersected: HOOD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.239,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.20m (36.75ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $1,178,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,885,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2444A002 06415,  Location: AT HOOD RIVER (Lat: 45.710306,  Lng: -121.507694),  Route carried "on" structure: Interstate 84,  Year Built: 1962,  Status: Open,  Structure Length: 11.22m (36.81ft),  Average Daily Traffic: 14,157 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 18,750 (year 2040),  Design Load: HS 20,  Features Intersected: HOOD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.239,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.20m (36.75ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $1,178,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,885,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 2471B002C06428,  Location: IN HOOD RIVER (Lat: 45.709481,  Lng: -121.504400),  Route carried "on" structure: ServiceState highway 84,  Year Built: 1974,  Status: Open,  Structure Length: 16.22m (53.22ft),  Average Daily Traffic: 7,799 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 10,100 (year 2030),  Design Load: HS 20,  Features Intersected: UPRR & FRONTAGE RD,  Facility Carried by Structure: HWY 002 DU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.400,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.20m (53.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,704,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $2,726,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6645 002C06462,  Location: Hood River (Lat: 45.718236,  Lng: -121.494903),  Route carried "on" structure: Other road ,  Year Built: 1924,  Status: Posted for load,  Structure Length: 134.66m (441.80ft),  Average Daily Traffic: 12,861 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 9,548 (year 2030),  Design Load: H 15,  Features Intersected: COLUMBIA RIVER,  Facility Carried by Structure: I-84 White Salmon
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 103.996,  Lanes on structure: 2,  Toll: Toll bridge,  Owner: Local Toll Authority,  Approaching Roadway Width: 6.7m (22.0ft),  Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 76.8m (252.0ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 19,  Number Of Approach Spans: 10,  Length of Maximum Span: 79.9m (262.1ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 13.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 10.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 134.70m (441.93ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $14,147,000,  Roadway Improvement Cost: $1,415,000,  Total Project Cost: $22,635,000,  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 7458 002F06398,  Location: IN HOOD RIVER (Lat: 45.710189,  Lng: -121.512261),  Route carried "on" structure: ServiceInterstate 84,  Year Built: 1952,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 28,315 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 37,500 (year 2040),  Design Load: HS 20,  Features Intersected: UPRR,  Facility Carried by Structure: FRONTAGE RD HWY 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 102.966,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 28.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7459 002F06392,  Location: IN HOOD RIVER (Lat: 45.710961,  Lng: -121.512261),  Route carried "on" structure: ServiceInterstate 84,  Year Built: 1953,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 28,315 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 37,500 (year 2040),  Design Load: HS 20,  Features Intersected: HWY 2,  Facility Carried by Structure: SECOND STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 102.869,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 24.3m (79.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 21.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,709,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $2,734,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7496 002 06302,  Location: IN HOOD RIVER (Lat: 45.712933,  Lng: -121.530347),  Route carried "on" structure: Interstate 84,  Year Built: 1952,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 14,157 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 18,750 (year 2040),  Design Load: HS 20,  Features Intersected: JAYMAR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.421,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7496A002 06302,  Location: IN HOOD RIVER (Lat: 45.712703,  Lng: -121.530383),  Route carried "on" structure: Interstate 84,  Year Built: 1964,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 14,157 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 18,750 (year 2040),  Design Load: HS 20,  Features Intersected: JAYMAR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.421,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 15.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $355,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $569,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8662 002 06341,  Location: IN HOOD RIVER (Lat: 45.712819,  Lng: -121.522019),  Route carried "on" structure: Interstate 84,  Year Built: 1964,  Status: Open,  Structure Length: 19.75m (64.80ft),  Average Daily Traffic: 14,157 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 18,750 (year 2040),  Design Load: HS 20,  Features Intersected: UPRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 102.049,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 7,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.80m (64.96ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $2,075,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $3,320,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9017 026 10461,  Location: 0.3 MI W WCL OF HOOD R (Lat: 45.711269,  Lng: -121.550219),  Route carried "on" structure: State highway 35,  Year Built: 1963,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 14,046 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 15,500 (year 2040),  Design Load: HS 20,  Features Intersected: HWY 2,  Facility Carried by Structure: HWY 100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 78.777,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.80m (22.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $911,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,458,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9615 204 00022,  Location: 00.22 MI E HWY 35 (Lat: 45.667819,  Lng: -121.508581),  Route carried "on" structure: County highway C0204,  Year Built: 1967,  Status: Posted for load,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 1,089 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,214 (year 2025),  Design Load: HS 20,  Features Intersected: MHR & UNNAMED CR,  Facility Carried by Structure: PAASCH RD #204
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 7.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21218 002 06444,  Location: IN HOOD RIVER (Lat: 45.710558,  Lng: -121.501767),  Route carried "on" structure: Interstate 84,  Year Built: 2009,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 23,243 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 28,800 (year 2040),  Design Load: HL 93,  Features Intersected: CONN 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.706,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Material/Design: Steel,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 69.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27C05 105 00114,  Location: 00.39M JCT COUNTRY CLB RD (Lat: 45.697228,  Lng: -121.575117),  Route carried "on" structure: County highway C0105,  Year Built: 1972,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 420 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 450 (year 2025),  Design Load: HS 20,  Features Intersected: PHELPS CR,  Facility Carried by Structure: POST CANYON RD#105
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.835,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2471B002C06428,  Location: IN HOOD RIVER (Lat: 45.709481,  Lng: -121.504400),  Route carried "under" structure: ServiceState highway 84,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 161 (year 2020),  Truck Traffic: 28%,  Features Intersected: UPRR & FRONTAGE RD,  Facility Carried by Structure: HWY 002 DU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.400,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 7459 002F06392,  Location: IN HOOD RIVER (Lat: 45.710961,  Lng: -121.512261),  Route carried "under" structure: Interstate 84,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 14,157 (year 2020),  Truck Traffic: 28%,  Features Intersected: HWY 2,  Facility Carried by Structure: SECOND STREET
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 102.869,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 7459 002F06392,  Location: IN HOOD RIVER (Lat: 45.710961,  Lng: -121.512261),  Route carried "under" structure: Interstate 84,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 14,157 (year 2020),  Truck Traffic: 28%,  Features Intersected: HWY 2,  Facility Carried by Structure: SECOND STREET
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 102.869,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 7496 002 06302,  Location: IN HOOD RIVER (Lat: 45.712933,  Lng: -121.530347),  Route carried "under" structure: Business Other road 84,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 666 (year 2010),  Features Intersected: JAYMAR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.421,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 9017 026 10461,  Location: 0.3 MI W WCL OF HOOD R (Lat: 45.711269,  Lng: -121.550219),  Route carried "under" structure: Interstate 84,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 23,039 (year 2020),  Truck Traffic: 28%,  Features Intersected: HWY 2,  Facility Carried by Structure: HWY 100
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 99.876,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 21218 002 06444,  Location: IN HOOD RIVER (Lat: 45.710558,  Lng: -121.501767),  Route carried "under" structure: Interstate ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 7,799 (year 2020),  Truck Traffic: 37%,  Features Intersected: CONN 2,  Facility Carried by Structure: I-84 (HWY 002)
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 103.674,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.9m (98.1ft)

Discuss Hood River, Oregon (OR) on our hugely popular Oregon forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.