  • 16Number of bridges
  • 138ft / 41.9mTotal length
  • $10,321,000Total costs
  • 12,175Total average daily traffic
  • 1,829Total average daily truck traffic
  • 19,480Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hominy
  • No street view available for this location

New bridges in Hominy, OK - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 31940-1949
  • 31950-1959
  • 11960-1969
  • 21970-1979
  • 31990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 44.4%Good
  • 22.2%Fair
  • 22.2%Poor
  • 11.1%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 44.4%Very good
  • 11.1%Satisfactory
  • 11.1%Fair
  • 22.2%Poor
  • 11.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 33.3%Good
  • 11.1%Satisfactory
  • 22.2%Fair
  • 11.1%Poor
  • 11.1%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 12.5%Good
  • 12.5%Satisfactory
  • 37.5%Fair
  • 12.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.9%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 4484,  Location: 1MI. NW JCT OF HWY 20&99 (Lat: 36.418919,  Lng: -96.407492),  Route carried "on" structure: County highway N3700,  Year Built: 1935,  Status: Posted for load,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 128 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 15.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 4.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $366,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6439,  Location: 3N OF HOMINY (Lat: 36.477689,  Lng: -96.407106),  Route carried "on" structure: County highway 5755,  Year Built: 1938,  Status: Posted for load,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 75 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 120 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Channel: Poor,  Operating Rating: 4.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 2.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of replacement,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.71m (15.45ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $383,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7059,  Location: 1.25N&.75W OF JCT 99 & 20 (Lat: 36.433983,  Lng: -96.403942),  Route carried "on" structure: County highway E0400,  Year Built: 1939,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8238,  Location: 3.5 MI. NE OF HOMINY (Lat: 36.426886,  Lng: -96.335658),  Route carried "on" structure: County highway 5788C,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 220 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 352 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.309,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 5.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.68m (12.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $188,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $298,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 899,  Location: 2S&.75W OF JCT. 99&20 (Lat: 36.390586,  Lng: -96.404147),  Route carried "on" structure: County highway D3676,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 480 (year 2040),  Features Intersected: BLACKBIRD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.401,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.88m (12.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $99,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9372,  Location: .6 MI N ON BOOKER (Lat: 36.425353,  Lng: -96.407486),  Route carried "on" structure: County highway N3700,  Year Built: 1940,  Status: Posted for load,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 128 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 34.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.03m (19.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Critical Feature Inspection Date: January 2021,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $492,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12575,  Location: 0.5 MI. E. JCT. SH99 (Lat: 36.413397,  Lng: -96.381831),  Route carried "on" structure: State highway 20,  Year Built: 1951,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,840 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK BIRD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $496,000,  Total Project Cost: $842,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 12581,  Location: 1.7 MI. E. JCT. SH99 (Lat: 36.402011,  Lng: -96.366892),  Route carried "on" structure: State highway 20,  Year Built: 1951,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,840 (year 2040),  Design Load: HS 20,  Features Intersected: MOSHETOMIE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.607,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $496,000,  Total Project Cost: $842,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13015,  Location: 1.0 MI. W. JCT. SH99 (Lat: 36.412828,  Lng: -96.413125),  Route carried "on" structure: State highway 20,  Year Built: 1953,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 820 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,312 (year 2040),  Design Load: HS 20,  Features Intersected: CLAREMORE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.491,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 15413,  Location: 3 MILES S.W. OF WYNONA (Lat: 36.506539,  Lng: -96.387767),  Route carried "on" structure: County highway E0350,  Year Built: 1962,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: BITTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 17617,  Location: 6 MI. N.W. OF HOMINY (Lat: 36.502383,  Lng: -96.428194),  Route carried "on" structure: County highway D3678,  Year Built: 1970,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: HELL ROARING CREEK,  Facility Carried by Structure: E3678
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 60.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 18796,  Location: 1.75SE OF JCT HWY 20 & 99 (Lat: 36.391150,  Lng: -96.371664),  Route carried "on" structure: County highway 5796C,  Year Built: 1975,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 640 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.378,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 23693,  Location: 4N OF HOMINY (Lat: 36.481419,  Lng: -96.397953),  Route carried "on" structure: County highway N3705,  Year Built: 1991,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: HOMINY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 65.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.15m (36.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $569,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $891,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24681,  Location: 6.8 MI. N.PAWNEE CL (Lat: 36.398553,  Lng: -96.389450),  Route carried "on" structure: State highway 99,  Year Built: 1995,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 2,600 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,160 (year 2040),  Design Load: HS 20,  Features Intersected: HOSKAHOMI CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.602,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.23m (20.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $533,000,  Roadway Improvement Cost: $879,000,  Total Project Cost: $1,492,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25608,  Location: 3 MI. EAST OF HOMINY (Lat: 36.423072,  Lng: -96.340586),  Route carried "on" structure: County highway 5788C,  Year Built: 1998,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: HS 20,  Features Intersected: HOMINY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.987,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.04m (29.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $462,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $719,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 26603,  Location: 4.2MI.N.JCT.SH-20 (Lat: 36.473414,  Lng: -96.378700),  Route carried "on" structure: State highway 99,  Year Built: 2002,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,840 (year 2040),  Design Load: HL 93,  Features Intersected: HOMINY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.758,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 64.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 50.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.93m (32.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $795,000,  Roadway Improvement Cost: $1,312,000,  Total Project Cost: $2,227,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing