Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hide-A-Way Lake, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 184ft / 56.4mTotal length
  • $2,127,000,000Total costs
  • 79,020Total average daily traffic
  • 13,809Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hide-A-Way Lake
  • No street view available for this location

New bridges in Hide-A-Way Lake, MS - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 81960-1969
  • 21970-1979
  • 21980-1989
  • 11990-1999
  • 12000-2009
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Hide-A-Way Lake, MS
Average Bridge Truck Traffic in Hide-A-Way Lake, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 63.6%Good
  • 27.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 45.5%Very good
  • 27.3%Good
  • 27.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 63.6%Very good
  • 18.2%Good
  • 9.1%Satisfactory
  • 9.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Excellent
  • 23.1%Very good
  • 38.5%Good
  • 23.1%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 11000590550108A,  Location: 6.4 MI N SR 43 NORTH (Lat: 30.600706,  Lng: -89.618600),  Route carried "on" structure: Interstate 59,  Year Built: 1963,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 11,500 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 13,000 (year 2040),  Design Load: HS 20,  Features Intersected: WEST UNION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.690,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.69m (12.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $20,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $220,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000590550108B,  Location: 6.4 MI N SR 43 NORTH (Lat: 30.600214,  Lng: -89.618342),  Route carried "on" structure: Interstate 59,  Year Built: 1963,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 11,500 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 13,000 (year 2040),  Design Load: HS 20,  Features Intersected: WEST UNION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.152,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.69m (12.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $20,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $220,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000590550130A,  Location: 8.6 MI N SR 43 NORTH (Lat: 30.626092,  Lng: -89.598614),  Route carried "on" structure: Interstate 59,  Year Built: 1963,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 9,000 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 10,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: STANFIELD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.280,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $149,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $279,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000590550130B,  Location: 8.6 MI N SR 43 NORTH (Lat: 30.625592,  Lng: -89.598689),  Route carried "on" structure: Interstate 59,  Year Built: 1963,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 9,000 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 10,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: STANFIELD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.546,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $149,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $279,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000110550188,  Location: 6.5 MI N SR 43 NORTH (Lat: 30.636469,  Lng: -89.648000),  Route carried "on" structure: US 11,  Year Built: 1937,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 5,800 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,800 (year 2040),  Design Load: H 15,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $190,000,000,  Roadway Improvement Cost: $19,000,000,  Total Project Cost: $581,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 41000590550127,  Location: 8.3 MI N SR 43 (Lat: 30.622536,  Lng: -89.600892),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 150 (year 2040),  Design Load: H 15,  Features Intersected: I 59,  Facility Carried by Structure: ANCHOR LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.912,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.60m (28.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $273,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $548,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA5500000000115,  Location: SEC 10 T 5S R16W B (Lat: 30.619639,  Lng: -89.586694),  Route carried "on" structure: County highway 120,  Year Built: 1976,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 550 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 825 (year 2034),  Design Load: HS 20,  Features Intersected: HOBOLOCHITTO CREEK,  Facility Carried by Structure: ANCHOR LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.540,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5500000000117,  Location: SEC 10 T 5S R16W B (Lat: 30.620361,  Lng: -89.593306),  Route carried "on" structure: County highway 120,  Year Built: 1976,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 550 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 825 (year 2034),  Design Load: HS 20,  Features Intersected: RELIEF FOR STANFIELD CK,  Facility Carried by Structure: ANCHOR LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.184,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: SA5500000000118,  Location: SEC 15 T 5S R16W (Lat: 30.606083,  Lng: -89.579583),  Route carried "on" structure: County highway 121,  Year Built: 1997,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 150 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 225 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: BRANCH,  Facility Carried by Structure: MT. CARMEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: SA5500000000119,  Location: SEC 18 T 5S R16W B (Lat: 30.610250,  Lng: -89.640083),  Route carried "on" structure: County highway 136,  Year Built: 1986,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,300 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,950 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK,  Facility Carried by Structure: W.UNION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: SA5500000000124,  Location: SEC 33 T 5S R16W B (Lat: 30.564139,  Lng: -89.606250),  Route carried "on" structure: County highway 113,  Year Built: 1989,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 160 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 240 (year 2034),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: SYCAMORE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: SA5500000000125,  Location: SEC 34 T 5S R16W B (Lat: 30.574333,  Lng: -89.594722),  Route carried "on" structure: County highway 136,  Year Built: 1968,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 1,300 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,950 (year 2034),  Design Load: HS 15,  Features Intersected: HOBOLOCHITTO CK,  Facility Carried by Structure: W.UNION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.851,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA550000000013,  Location: SEC 14 T 5S R17W (Lat: 30.606281,  Lng: -89.664711),  Route carried "on" structure: County highway 203,  Year Built: 2007,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 160 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 240 (year 2034),  Design Load: H 15,  Features Intersected: GEORGE BRANCH,  Facility Carried by Structure: BURGETOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA550000000A116,  Location: SEC 10 T 5S R16W B (Lat: 30.619842,  Lng: -89.590119),  Route carried "on" structure: County highway 120,  Year Built: 2020,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 825 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 908 (year 2039),  Design Load: HL 93,  Features Intersected: STANFIELD CREEK,  Facility Carried by Structure: ANCHOR LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA550000000A12,  Location: SEC 18 T 5S R16W B (Lat: 30.618283,  Lng: -89.643197),  Route carried "on" structure: County highway 120,  Year Built: 2019,  Status: Open,  Structure Length: 2.89m (9.48ft),  Average Daily Traffic: 1,100 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,430 (year 2043),  Design Load: HL 93,  Features Intersected: MILL CREEK,  Facility Carried by Structure: ANCHOR LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.173,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA550000000A129,  Location: SEC 11 T 5S R17W B (Lat: 30.623950,  Lng: -89.673531),  Route carried "on" structure: County highway 204,  Year Built: 2016,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 275 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 410 (year 2043),  Design Load: HS 20+Mod,  Features Intersected: MARSEN BRANCH,  Facility Carried by Structure: GEORGE FORD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2092.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 80.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 2100011055015,  Location: 4.5 MI N OF PICAYUNE (Lat: 30.584333,  Lng: -89.661189),  Route carried "under" structure: US 11,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 8,700 (year 2018),  Truck Traffic: 8%,  Features Intersected: US 11,  Facility Carried by Structure: NORFOLK S RR
Minimum Vertical Clearance: 4.20m (13.78ft),  Kilometerpoint: 13.353,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 41000590550127,  Location: 8.3 MI N SR 43 (Lat: 30.622536,  Lng: -89.600892),  Route carried "under" structure: Interstate 59,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2018),  Truck Traffic: 10%,  Features Intersected: I 59,  Facility Carried by Structure: ANCHOR LAKE ROAD
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 4.912,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 41000590550127,  Location: 8.3 MI N SR 43 (Lat: 30.622536,  Lng: -89.600892),  Route carried "under" structure: Interstate 59,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2018),  Truck Traffic: 10%,  Features Intersected: I 59,  Facility Carried by Structure: ANCHOR LAKE ROAD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 4.912,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.0m (82.0ft)

Discuss Hide-A-Way Lake, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.