  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 138ft / 42.2mTotal length
  • $5,935,000Total costs
  • 9,778Total average daily traffic
  • 720Total average daily truck traffic
  • 10,996Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Harrisville
  • No street view available for this location

New bridges in Harrisville, WV - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21930-1939
  • 11950-1959
  • 11960-1969
  • 21970-1979
  • 11990-1999
  • 32000-2009
Average Bridge Daily Traffic in Harrisville, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 75.0%Good
  • 12.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Good
  • 20.0%Satisfactory
  • 30.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 10.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 72.7%Good
  • 18.2%Satisfactory
  • 9.1%Poor
Find on map >>   Show street view

Structure Number: 43A047,  Location: 0.41 M NORTH OF CR 24 (Lat: 39.148100,  Lng: -81.046639),  Route carried "on" structure: State highway 16,  Year Built: 1962,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 1,400 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,526 (year 2038),  Design Load: HS 15,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.101,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $150,000,  Total Project Cost: $150,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 43A048,  Location: 0.09 MILE SOUTH CR 16/14 (Lat: 39.160531,  Lng: -81.044661),  Route carried "on" structure: State highway 16,  Year Built: 1930,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,100 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,254 (year 2039),  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.758,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $150,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 43A049,  Location: 0.06 MI. S. CR. 12 (Lat: 39.224961,  Lng: -81.032700),  Route carried "on" structure: State highway 16,  Year Built: 1976,  Status: Open,  Structure Length: 12.05m (39.53ft),  Average Daily Traffic: 5,300 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,777 (year 2038),  Features Intersected: WV. 16 & N. FK HUGES RV.
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 30.513,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.04m (39.50ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $528,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $529,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 43A06,  Location: 0.01 MI. S. OF CR. 26/1 (Lat: 39.158061,  Lng: -81.099050),  Route carried "on" structure: County highway 179,  Year Built: 1915,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 80 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 96 (year 2038),  Features Intersected: BRANCH OF DOG RUN,  Facility Carried by Structure: COUNTY ROUTE 17/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.2m (20.3ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $350,000
Find on map >>   Show street view

Structure Number: 43A077,  Location: 0.01 M EAST OF WV 16 (Lat: 39.142439,  Lng: -81.046719),  Route carried "on" structure: County highway 24,  Year Built: 1992,  Status: Open,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 250 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 323 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $600,000 ( Estimate for 2017),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43A078,  Location: 0.01 M WEST OF CR 24/6 (Lat: 39.149000,  Lng: -81.025000),  Route carried "on" structure: County highway 24,  Year Built: 1955,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 250 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 323 (year 2038),  Design Load: HS 20,  Features Intersected: CHEVAUX DE FRISE RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.205,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43A145,  Location: 0.01 MILE SOUTH OF CR 24 (Lat: 39.142400,  Lng: -81.040169),  Route carried "on" structure: County highway 247,  Year Built: 1938,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 150 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 179 (year 2038),  Features Intersected: CHEVAUX DE FRIZE RUN,  Facility Carried by Structure: COUNTY ROUTE 24/7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.391,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $16,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 43A156,  Location: 0.01 M NORTH OF P&F 801 (Lat: 39.225369,  Lng: -81.104969),  Route carried "on" structure: State lands road 807,  Year Built: 1975,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 24 (year 2016),  Average Future Daily Traffic: 31 (year 2036),  Design Load: H 20,  Features Intersected: NORTH FORK HUGHES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 16.9m (55.4ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $1,500,000,  Total Project Cost: $1,500,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43A18,  Location: 0.02 NORTH OF CR 31/13 (Lat: 39.203231,  Lng: -81.057800),  Route carried "on" structure: State highway 31,  Year Built: 2000,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 809 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,027 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: BACK RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,200,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43A183,  Location: 0.22 MIL EAST OF CR 31/10 (Lat: 39.210369,  Lng: -81.072119),  Route carried "on" structure: County highway 5,  Year Built: 2002,  Status: Open,  Structure Length: 13.56m (44.49ft),  Average Daily Traffic: 385 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 420 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: THIRD RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.693,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.56m (44.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $850,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $900,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43A191,  Location: 1.52 MI S OF WV 16 (Lat: 39.229100,  Lng: -81.013600),  Route carried "on" structure: County highway 12,  Year Built: 2004,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 30 (year 2017),  Average Future Daily Traffic: 40 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: WV 12 BUNNELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.446,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019,  Bridge Improvement Cost: $90,000,  Total Project Cost: $90,000 ( Estimate for 2015),  Wearing Surface/Protective System: Wearing Surface: Gravel