  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 397ft / 121mTotal length
  • $27,530,000Total costs
  • 312,311Total average daily traffic
  • 74,070Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hamburg
  • No street view available for this location

New bridges in Hamburg, PA - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 11940-1949
  • 81950-1959
  • 11980-1989
  • 92000-2009
  • 12010-2019
  • 22020-2022
Reconstructed bridges in Hamburg, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 21970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Hamburg, PA
Average Bridge Truck Traffic in Hamburg, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.3%Very good
  • 33.3%Good
  • 40.0%Satisfactory
  • 13.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 26.7%Fair
  • 13.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Very good
  • 26.7%Good
  • 26.7%Satisfactory
  • 26.7%Fair
  • 13.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Very good
  • 15.4%Good
  • 7.7%Satisfactory
  • 38.5%Fair
  • 23.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Very good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 4505,  Location: 1.5 M.NE.OF WEYANT (Lat: 40.220050,  Lng: -78.533375),  Route carried "on" structure: City street ,  Year Built: 1987,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 36 (year 2020),  Average Future Daily Traffic: 51 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SCRUBGRASS CREEK,  Facility Carried by Structure: T613, COLEBAUGH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4601,  Location: NEAR HAMBURG BORO LINE (Lat: 40.539269,  Lng: -75.976742),  Route carried "on" structure: State highway 61,  Year Built: 1955,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 24,179 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 33,887 (year 2032),  Design Load: HS 20,  Features Intersected: CHRISTMANS RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.134,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 4602,  Location: HAMBURG BOROUGH (Lat: 40.543942,  Lng: -75.980436),  Route carried "on" structure: State highway 61,  Year Built: 1954,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 20,233 (year 2022),  Truck Traffic: 14%,  Average Future Daily Traffic: 28,616 (year 2035),  Design Load: HS 20,  Features Intersected: READING/NORTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.287,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 25 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $61,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $828,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4603,  Location: HAMBURG BOROUGH (Lat: 40.546808,  Lng: -75.985456),  Route carried "on" structure: State highway 61,  Year Built: 1952,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 20,233 (year 2022),  Truck Traffic: 14%,  Average Future Daily Traffic: 28,616 (year 2032),  Design Load: HS 20,  Features Intersected: KAERCHERS CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.287,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $87,000,  Roadway Improvement Cost: $255,000,  Total Project Cost: $1,169,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4604,  Location: HAMBURG BOROUGH (Lat: 40.549217,  Lng: -75.989156),  Route carried "on" structure: State highway 61,  Year Built: 1954,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 20,233 (year 2022),  Truck Traffic: 14%,  Average Future Daily Traffic: 28,616 (year 2032),  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.243,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 29.1m (95.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $14,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $184,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4605,  Location: HAMBURG BOROUGH LINE (Lat: 40.552442,  Lng: -75.992842),  Route carried "on" structure: State highway 61,  Year Built: 1954,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 26.64m (87.40ft),  Average Daily Traffic: 20,233 (year 2022),  Truck Traffic: 14%,  Average Future Daily Traffic: 28,616 (year 2032),  Design Load: HS 20,  Features Intersected: SR 4028;RIV;RDG,READ/NOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.589,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 6,  Length of Maximum Span: 47.9m (157.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.10m (88.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $706,000,  Total Project Cost: $3,235,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4661,  Location: HAMBURG (Lat: 40.559478,  Lng: -75.991253),  Route carried "on" structure: Interstate 78,  Year Built: 1955,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 54.92m (180.18ft),  Average Daily Traffic: 39,856 (year 2022),  Truck Traffic: 34%,  Average Future Daily Traffic: 57,765 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: READING/NORTHERN RR T571
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.075,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 7,  Length of Maximum Span: 48.2m (158.1ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 55.70m (182.74ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $15,000,000,  Roadway Improvement Cost: $5,000,000,  Total Project Cost: $20,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5275,  Location: WEST STATE STREET (Lat: 40.553853,  Lng: -75.990217),  Route carried "on" structure: Spur State highway ,  Year Built: 1927,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 11.95m (39.21ft),  Average Daily Traffic: 8,438 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,154 (year 2032),  Design Load: HL 93,  Features Intersected: SCHUYLKILL RIVER,  Facility Carried by Structure: SR 4028(LR06046SP)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.840,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 17.00m (55.77ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $418,000,  Total Project Cost: $1,916,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5491,  Location: BETWEEN FRONT AND SECOND (Lat: 40.552733,  Lng: -75.986608),  Route carried "on" structure: City street ,  Year Built: 1920,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 626 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,200 (year 2030),  Features Intersected: MILL CREEK,  Facility Carried by Structure: PINE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $198,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5492,  Location: EAST END OF BOROUGH (Lat: 40.554347,  Lng: -75.975269),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 858 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,000 (year 2030),  Features Intersected: KAERCHERS CREEK,  Facility Carried by Structure: PINE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 5493,  Location: BET PINE AND STATE STS (Lat: 40.553361,  Lng: -75.985967),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 687 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,500 (year 2030),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: SECOND STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 41465,  Location: SOUTH OF HAMBURG (Lat: 40.542997,  Lng: -75.972528),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 903 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 929 (year 2024),  Design Load: HS 25 or greater,  Features Intersected: KERSHNER CREEK,  Facility Carried by Structure: WOODLAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4436,  Location: N 5th ST HAMBURG (Lat: 40.563328,  Lng: -75.981089),  Route carried "on" structure: State highway ,  Year Built: 2006,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 950 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,566 (year 2032),  Design Load: HL 93,  Features Intersected: SR 78 (LR 285),  Facility Carried by Structure: SR 4049 (5th ST)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 8 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.2m (145.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44367,  Location: EXIT #10 HAMBURG INT (Lat: 40.562425,  Lng: -75.983372),  Route carried "on" structure: State highway ,  Year Built: 2006,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 2,500 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,982 (year 2032),  Design Load: HL 93,  Features Intersected: SR 78 (LR 285),  Facility Carried by Structure: SR 4035 N 4TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.065,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 45234,  Location: HAMBURG (Lat: 40.560883,  Lng: -75.987522),  Route carried "on" structure: Interstate 78,  Year Built: 2007,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 39,856 (year 2022),  Truck Traffic: 34%,  Average Future Daily Traffic: 57,765 (year 2032),  Design Load: HL 93,  Features Intersected: PORT CLINTON AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.127,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 27.2m (89.2ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54093,  Location: .5 MI.SOUTH OF HAMBURG (Lat: 40.549569,  Lng: -75.962511),  Route carried "on" structure: State highway ,  Year Built: 2017,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 672 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 815 (year 2037),  Design Load: HL 93,  Features Intersected: Windsor Creek,  Facility Carried by Structure: Windsor Castle Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.450,  Lanes on structure: 2,  Owner: State Highway Agency,  Maintenance Responsibility: Private,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 68136,  Location: STATE ST. (Lat: 40.555944,  Lng: -75.980625),  Route carried "on" structure: Spur State highway ,  Year Built: 2021,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 5,427 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,625 (year 2032),  Design Load: HL 93,  Features Intersected: MILL CREEK,  Facility Carried by Structure: SR 4028(LR06046SP)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.194,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 68295,  Location: HAMBURG BOROUGH (Lat: 40.557050,  Lng: -75.998072),  Route carried "on" structure: State highway 61,  Year Built: 2021,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 10,573 (year 2022),  Truck Traffic: 12%,  Average Future Daily Traffic: 14,226 (year 2032),  Design Load: HL 93,  Features Intersected: I-78
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.385,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 28.6m (93.8ft),  Out-to-Out Width: 29.7m (97.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4605,  Location: HAMBURG BOROUGH LINE (Lat: 40.552442,  Lng: -75.992842),  Route carried "under" structure: Spur State highway ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 8,438 (year 2022),  Truck Traffic: 6%,  Features Intersected: SR 4028;RIV;RDG,READ/NOR,  Facility Carried by Structure: PA 61 (LR 160)
Minimum Vertical Clearance: 12.98m (42.59ft),  Kilometerpoint: 5.840,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 4661,  Location: HAMBURG (Lat: 40.559478,  Lng: -75.991253),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 1,815 (year 2013),  Truck Traffic: 9%,  Features Intersected: READING/NORTHERN RR T571,  Facility Carried by Structure: I-78 (LR 285)
Minimum Vertical Clearance: 13.84m (45.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 4436,  Location: N 5th ST HAMBURG (Lat: 40.563328,  Lng: -75.981089),  Route carried "under" structure: Interstate 78,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 21,087 (year 2021),  Truck Traffic: 37%,  Features Intersected: SR 78 (LR 285),  Facility Carried by Structure: SR 4049 (5th ST)
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 35.653,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 4436,  Location: N 5th ST HAMBURG (Lat: 40.563328,  Lng: -75.981089),  Route carried "under" structure: Interstate 78,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 19,651 (year 2021),  Truck Traffic: 39%,  Features Intersected: SR 78 (LR 285),  Facility Carried by Structure: SR 4049 (5th ST)
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 35.681,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 44367,  Location: EXIT #10 HAMBURG INT (Lat: 40.562425,  Lng: -75.983372),  Route carried "under" structure: Interstate 78,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 21,087 (year 2021),  Truck Traffic: 37%,  Features Intersected: SR 78 (LR 285),  Facility Carried by Structure: SR 4035 N 4TH ST
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 35.095,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 44367,  Location: EXIT #10 HAMBURG INT (Lat: 40.562425,  Lng: -75.983372),  Route carried "under" structure: Interstate 78,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 21,830 (year 2022),  Truck Traffic: 33%,  Features Intersected: SR 78 (LR 285),  Facility Carried by Structure: SR 4035 N 4TH ST
Minimum Vertical Clearance: 5.73m (18.80ft),  Kilometerpoint: 35.127,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 45234,  Location: HAMBURG (Lat: 40.560883,  Lng: -75.987522),  Route carried "under" structure: City street ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 1,910 (year 1999),  Truck Traffic: 1%,  Features Intersected: PORT CLINTON AVE.,  Facility Carried by Structure: SR 78
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.1m (138.1ft)