Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Halfway House, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 36ft / 11.4mTotal length
  • $1,980,000Total costs
  • 56,471Total average daily traffic
  • 5,239Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Halfway House
  • No street view available for this location

New bridges in Halfway House, PA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 61960-1969
  • 11970-1979
  • 12000-2009
Reconstructed bridges in Halfway House, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Halfway House, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Good
  • 60.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Good
  • 16.7%Satisfactory
  • 50.0%Fair
  • 16.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 33.3%Fair
  • 16.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 40.0%Poor
Find on map >>   Show street view

Structure Number: 5108,  Location: GRESHVILLE ROAD (Lat: 40.307853,  Lng: -75.658158),  Route carried "on" structure: State highway ,  Year Built: 1912,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,215 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,815 (year 2032),  Features Intersected: IRONSTONE CREEK,  Facility Carried by Structure: SR 2042 (LR 06104)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.072,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $421,000
Find on map >>   Show street view

Structure Number: 535,  Location: 0.4 MI. WEST OF SR 2065 (Lat: 40.299253,  Lng: -75.663247),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 120 (year 2009),  Average Future Daily Traffic: 150 (year 2019),  Features Intersected: IRONSTONE CREEK,  Facility Carried by Structure: CREAMERY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5351,  Location: 0.3 MI. SO.OF SR 2042 (Lat: 40.303256,  Lng: -75.662147),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 190 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 280 (year 2019),  Features Intersected: IRONSTONE CREEK,  Facility Carried by Structure: WINDING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5352,  Location: GLENDALE BRIDGE (Lat: 40.291111,  Lng: -75.674000),  Route carried "on" structure: Other road ,  Year Built: 1906,  Year Reconstructed: 1966,  Status: Posted for load,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 114 (year 2018),  Average Future Daily Traffic: 128 (year 2038),  Design Load: HS 20,  Features Intersected: IRONSTONE CREEK,  Facility Carried by Structure: WINDING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $33,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $441,000,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 27301,  Location: HALFWAY HOUSE 11F3/3026G5 (Lat: 40.286228,  Lng: -75.643922),  Route carried "on" structure: State highway 100,  Year Built: 1964,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 23,150 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 35,336 (year 2032),  Design Load: HS 20,  Features Intersected: PINE FORD ROAD (LOCAL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.386,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 24.8m (81.4ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 27862,  Location: U. POTTSGROVE 11F3/3026H4 (Lat: 40.289375,  Lng: -75.643058),  Route carried "on" structure: State highway ,  Year Built: 1964,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 4,222 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,012 (year 2032),  Design Load: HS 20,  Features Intersected: PA 100,  Facility Carried by Structure: FARMINGTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.372,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $83,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $1,118,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 40894,  Location: WEST OF 663 11J5/3026K6 (Lat: 40.276258,  Lng: -75.625144),  Route carried "on" structure: State highway ,  Year Built: 2000,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 3,085 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,341 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: SPROGELS RUN,  Facility Carried by Structure: MAUGERS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 27301,  Location: HALFWAY HOUSE 11F3/3026G5 (Lat: 40.286228,  Lng: -75.643922),  Route carried "under" structure: County highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 1980),  Truck Traffic: 7%,  Features Intersected: PINE FORD ROAD (LOCAL),  Facility Carried by Structure: TRAFFIC ROUTE 100
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 27862,  Location: U. POTTSGROVE 11F3/3026H4 (Lat: 40.289375,  Lng: -75.643058),  Route carried "under" structure: State highway 100,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,754 (year 2022),  Truck Traffic: 8%,  Features Intersected: PA 100,  Facility Carried by Structure: FARMINGTON AVENUE
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 5.741,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 27862,  Location: U. POTTSGROVE 11F3/3026H4 (Lat: 40.289375,  Lng: -75.643058),  Route carried "under" structure: State highway 100,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,621 (year 2022),  Truck Traffic: 8%,  Features Intersected: PA 100,  Facility Carried by Structure: FARMINGTON AVENUE
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 5.750,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Discuss Halfway House, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.