Bridge Statistics for Green River, Wyoming (WY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 499ft / 152mTotal length
  • $3,000Total costs
  • 149,496Total average daily traffic
  • 47,940Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Green River
  • No street view available for this location

New bridges in Green River, WY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11950-1959
  • 41960-1969
  • 21970-1979
  • 11980-1989
  • 81990-1999
  • 72000-2009
  • 22010-2019
Average Bridge Daily Traffic in Green River, WY
Average Bridge Truck Traffic in Green River, WY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Very good
  • 46.7%Good
  • 33.3%Satisfactory
  • 6.7%Fair
  • 6.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 13.3%Very good
  • 53.3%Good
  • 33.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Very good
  • 40.0%Good
  • 40.0%Satisfactory
  • 6.7%Fair
  • 6.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 25.0%Good
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: APG,  Location: Green River (Lat: 41.538989,  Lng: -109.474778),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 8,462 (year 2021),  Truck Traffic: 93%,  Average Future Daily Traffic: 11,847 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Sw CR 53 / White Mtn Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 144.363,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.7m (38.4ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: APH,  Location: Green River (Lat: 41.539117,  Lng: -109.474589),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 9,555 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,377 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Sw CR 53 / White Mtn Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 144.175,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.7m (38.4ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: APK,  Location: Green River (Lat: 41.531347,  Lng: -109.459414),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Status: Open,  Structure Length: 3.09m (10.14ft),  Average Daily Traffic: 8,462 (year 2021),  Truck Traffic: 93%,  Average Future Daily Traffic: 11,847 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Riverview Cemetery Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 145.908,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: APL,  Location: Green River (Lat: 41.531536,  Lng: -109.459242),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Status: Open,  Structure Length: 3.09m (10.14ft),  Average Daily Traffic: 9,555 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,377 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Riverview Cemetery Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 145.715,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: CVL,  Location: Green River (Lat: 41.519542,  Lng: -109.465686),  Route carried "on" structure: State highway 530,  Year Built: 1953,  Status: Open,  Structure Length: 13.93m (45.70ft),  Average Daily Traffic: 10,258 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,361 (year 2041),  Design Load: H 20,  Features Intersected: Green River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.226,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML190,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.8m (124.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: August 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: DDH,  Location: Green River (Lat: 41.525214,  Lng: -109.459964),  Route carried "on" structure: State highway 530,  Year Built: 1978,  Status: Open,  Structure Length: 35.74m (117.26ft),  Average Daily Traffic: 10,258 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,361 (year 2041),  Design Load: HS 20,  Features Intersected: UPRR / I-80 Bus
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.425,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 67.4m (221.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Serious,  Operating Rating: 80.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: DNJ,  Location: Green River (Lat: 41.519650,  Lng: -109.465792),  Route carried "on" structure: State highway 530,  Year Built: 1982,  Status: Open,  Structure Length: 13.98m (45.87ft),  Average Daily Traffic: 10,258 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,361 (year 2041),  Design Load: HS 20,  Features Intersected: Green River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.221,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML190,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.8m (124.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: August 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: JQL,  Location: Green River (Lat: 41.525172,  Lng: -109.459867),  Route carried "on" structure: State highway 530,  Year Built: 1994,  Status: Open,  Structure Length: 35.74m (117.26ft),  Average Daily Traffic: 10,258 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,361 (year 2041),  Design Load: HS 20,  Features Intersected: UPRR / US 30
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.423,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 67.4m (221.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: KED,  Location: Green River Marginal (Lat: 41.541256,  Lng: -109.478714),  Route carried "on" structure: Interstate 80,  Year Built: 1995,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 8,350 (year 2021),  Truck Traffic: 45%,  Average Future Daily Traffic: 11,690 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: West Green River Intg
Minimum Vertical Clearance: 6.72m (22.05ft),  Kilometerpoint: 143.945,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: KEE,  Location: Green River Marginal (Lat: 41.541442,  Lng: -109.478564),  Route carried "on" structure: Interstate 80,  Year Built: 1995,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 8,662 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 12,127 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: West Green River Intg
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 143.750,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: LEU,  Location: Green River (Lat: 41.523786,  Lng: -109.446147),  Route carried "on" structure: Interstate 80,  Year Built: 2002,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 8,462 (year 2021),  Truck Traffic: 93%,  Average Future Daily Traffic: 11,847 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: East Green River Intg
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 147.306,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: LEV,  Location: Green River (Lat: 41.523947,  Lng: -109.445931),  Route carried "on" structure: Interstate 80,  Year Built: 2002,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 9,555 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,377 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: East Green River Intg
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 147.118,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MBS,  Location: Green River Streets (Lat: 41.523283,  Lng: -109.469908),  Route carried "on" structure: City street 180-4,  Year Built: 2007,  Status: Posted for load,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 434 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 608 (year 2041),  Design Load: HS 20,  Features Intersected: Green River,  Facility Carried by Structure: S. 2nd E. Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.405,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.03m (0.10ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MFL,  Location: Green River (Lat: 41.496031,  Lng: -109.439658),  Route carried "on" structure: City street 180-3,  Year Built: 2010,  Status: Open,  Structure Length: 7.47m (24.51ft),  Average Daily Traffic: 636 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 890 (year 2041),  Design Load: HL 93,  Features Intersected: Green River,  Facility Carried by Structure: Scotts Bottom Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.138,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: August 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: MVY,  Location: .5 Mi. S. of Labarge Int (Lat: 41.549653,  Lng: -109.592247),  Route carried "on" structure: County highway 37,  Year Built: 2017,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 6 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 8 (year 2041),  Design Load: HL 93,  Features Intersected: UPRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.0m (147.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: DDH,  Location: Green River (Lat: 41.525214,  Lng: -109.459964),  Route carried "under" structure: US 30,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 9,020 (year 2021),  Truck Traffic: 6%,  Features Intersected: UPRR / I-80 Bus
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 146.565,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 67.4m (221.1ft)

Find on map >>   Show street view

Structure Number: EOK,  Location: T18N R107W S22 (Lat: 41.529547,  Lng: -109.474361),  Route carried "under" structure: City street 14351,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 5,731 (year 2021),  Truck Traffic: 4%,  Features Intersected: West 2nd South Street,  Facility Carried by Structure: UPRR
Minimum Vertical Clearance: 3.98m (13.06ft),  Kilometerpoint: 160.444,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 9.4m (30.8ft)

Find on map >>   Show street view

Structure Number: JQL,  Location: Green River (Lat: 41.525172,  Lng: -109.459867),  Route carried "under" structure: US 30,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 9,020 (year 2021),  Truck Traffic: 6%,  Features Intersected: UPRR / US 30
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 146.574,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 67.4m (221.1ft)

Find on map >>   Show street view

Structure Number: KED,  Location: Green River Marginal (Lat: 41.541256,  Lng: -109.478714),  Route carried "under" structure: Business US 52,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 418 (year 2021),  Truck Traffic: 7%,  Features Intersected: West Green River Intg,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 6.72m (22.05ft),  Kilometerpoint: 0.089,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: KED,  Location: Green River Marginal (Lat: 41.541256,  Lng: -109.478714),  Route carried "under" structure: Interstate 52,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 1,237 (year 2021),  Truck Traffic: 5%,  Features Intersected: West Green River Intg,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 6.72m (22.05ft),  Kilometerpoint: 0.286,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: KEE,  Location: Green River Marginal (Lat: 41.541442,  Lng: -109.478564),  Route carried "under" structure: Business US 52,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 418 (year 2021),  Truck Traffic: 7%,  Features Intersected: West Green River Intg,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.098,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: KEE,  Location: Green River Marginal (Lat: 41.541442,  Lng: -109.478564),  Route carried "under" structure: Business US 52,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 1,237 (year 2021),  Truck Traffic: 5%,  Features Intersected: West Green River Intg,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.312,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: LEU,  Location: Green River (Lat: 41.523786,  Lng: -109.446147),  Route carried "under" structure: US 30,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 4,501 (year 2021),  Truck Traffic: 10%,  Features Intersected: East Green River Intg,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 6.37m (20.90ft),  Kilometerpoint: 0.925,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: LEU,  Location: Green River (Lat: 41.523786,  Lng: -109.446147),  Route carried "under" structure: US 30,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 121 (year 2021),  Truck Traffic: 9%,  Features Intersected: East Green River Intg,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 6.37m (20.90ft),  Kilometerpoint: 0.122,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: LEV,  Location: Green River (Lat: 41.523947,  Lng: -109.445931),  Route carried "under" structure: Alternate US 600,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 121 (year 2021),  Truck Traffic: 9%,  Features Intersected: East Green River Intg,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.134,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: LEV,  Location: Green River (Lat: 41.523947,  Lng: -109.445931),  Route carried "under" structure: Alternate US 600,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 4,501 (year 2021),  Truck Traffic: 10%,  Features Intersected: East Green River Intg,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.898,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)