Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Granville, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 135ft / 41.1mTotal length
  • $8,300,000Total costs
  • 178,750Total average daily traffic
  • 18,364Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Granville
  • No street view available for this location

New bridges in Granville, WV - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 21930-1939
  • 11940-1949
  • 21950-1959
  • 11960-1969
  • 51970-1979
  • 21980-1989
  • 11990-1999
  • 32000-2009
Average Bridge Daily Traffic in Granville, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Good
  • 30.0%Satisfactory
  • 20.0%Fair
  • 20.0%Poor
  • 10.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Very good
  • 28.6%Good
  • 7.1%Satisfactory
  • 28.6%Fair
  • 14.3%Poor
  • 14.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 21.4%Good
  • 35.7%Satisfactory
  • 28.6%Fair
  • 7.1%Poor
  • 7.1%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 8.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
  • 16.7%Poor
Find on map >>   Show street view

Structure Number: 31A048,  Location: 0.03 MI SOUTH CO RT 46/2 (Lat: 39.618439,  Lng: -80.020389),  Route carried "on" structure: US 1900,  Year Built: 1922,  Status: Posted for load,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 3,900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,900 (year 2041),  Features Intersected: DENTS RUN,  Facility Carried by Structure: U.S. RT. 19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.879,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.6m (41.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $853,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A059,  Location: 0.01 MI NORTH CO RT 50 (Lat: 39.667031,  Lng: -80.018339),  Route carried "on" structure: US 1900,  Year Built: 1954,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 10,900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 13,750 (year 2041),  Features Intersected: WADES RUN,  Facility Carried by Structure: US ROUTE 19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.589,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A063,  Location: 0.10 MI EAST US ROUTE 19 (Lat: 39.616289,  Lng: -80.016319),  Route carried "on" structure: County highway 1904,  Year Built: 1978,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Features Intersected: DENTS RUN,  Facility Carried by Structure: MONONGALIA CR 19/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Channel: Fair,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $391,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 31A065,  Location: 0.20 MI EAST CR 19/12 (Lat: 39.661031,  Lng: -80.004839),  Route carried "on" structure: County highway 1925,  Year Built: 1930,  Status: Posted for load,  Structure Length: 1.54m (5.05ft),  Average Daily Traffic: 600 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 930 (year 2041),  Features Intersected: SCOTTS RUN,  Facility Carried by Structure: MON CO RT 19/25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.5m (47.6ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $257,000,  Total Project Cost: $648,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A066,  Location: 0.29 MI WEST CO RT 54/1 (Lat: 39.660989,  Lng: -80.000931),  Route carried "on" structure: County highway 1925,  Year Built: 1925,  Status: Posted for load,  Structure Length: 2.09m (6.86ft),  Average Daily Traffic: 600 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 930 (year 2041),  Features Intersected: SCOTTS RUN,  Facility Carried by Structure: MONON CO RT 19/25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.255,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Fair,  Channel: Poor,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $664,000,  Roadway Improvement Cost: $399,000,  Total Project Cost: $1,151,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A07,  Location: 0.02 MI SOUTH CO RT 19/25 (Lat: 39.658669,  Lng: -80.008211),  Route carried "on" structure: County highway 1926,  Year Built: 1952,  Status: Open,  Structure Length: 1.75m (5.74ft),  Average Daily Traffic: 100 (year 2018),  Average Future Daily Traffic: 135 (year 2038),  Features Intersected: SCOTTS RUN,  Facility Carried by Structure: COUNTY ROUTE 19/26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.1m (26.6ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $224,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $393,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31A099,  Location: 0.04 MI NORTH US RT 19 (Lat: 39.619761,  Lng: -80.030619),  Route carried "on" structure: County highway 4300,  Year Built: 1935,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,300 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,500 (year 2038),  Features Intersected: DENTS RUN,  Facility Carried by Structure: MON CO RT 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.2m (30.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $488,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A129,  Location: 0.12 MI NORTH US ROUTE 19 (Lat: 39.668100,  Lng: -80.018200),  Route carried "on" structure: County highway 5000,  Year Built: 1991,  Status: Open,  Structure Length: 1.60m (5.25ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,240 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: WADES RUN,  Facility Carried by Structure: MONONGALIA CR 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $378,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $661,000 ( Estimate for 2022),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A13,  Location: 0.52 MI NORTH US ROUTE 19 (Lat: 39.673800,  Lng: -80.019500),  Route carried "on" structure: County highway 5000,  Year Built: 1989,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,240 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: WADES RUN,  Facility Carried by Structure: MONONGALIA CR 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $298,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $553,000 ( Estimate for 2022),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A173,  Location: 0.60 mi N.of Mon Co 46/7 (Lat: 39.641861,  Lng: -80.004250),  Route carried "on" structure: Interstate 7900,  Year Built: 1969,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 35,600 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 48,425 (year 2039),  Design Load: HS 20,  Features Intersected: MINE TRACK BED,  Facility Carried by Structure: I-79 & Mon Co 46/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 247.678,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 56.4m (185.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Culverts: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 31A174,  Location: 2.34 MI NORTH US RT 19 (Lat: 39.655000,  Lng: -80.010500),  Route carried "on" structure: Interstate 7900,  Year Built: 1972,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 17,800 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 25,450 (year 2041),  Design Load: HS 20,  Features Intersected: Mon. Co. 19/24,  Facility Carried by Structure: INTERSTATE 79 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 249.239,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $1,217,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $1,675,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 31A189,  Location: 0.05 MI SOUTH CO RT 49 (Lat: 39.642839,  Lng: -79.983839),  Route carried "on" structure: State highway 10000,  Year Built: 1988,  Status: Open,  Structure Length: 3.88m (12.73ft),  Average Daily Traffic: 4,300 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,550 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: DENTS RUN,  Facility Carried by Structure: WV ROUTE 100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A219,  Location: 2.34 MI NORTH US RT 19 (Lat: 39.654900,  Lng: -80.010200),  Route carried "on" structure: Interstate 7900,  Year Built: 1972,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 17,800 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 25,455 (year 2041),  Design Load: HS 20,  Features Intersected: Mon. Co. 19/24,  Facility Carried by Structure: INTERSTATE 79 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 249.239,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $811,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $1,487,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 31A303,  Location: 0.01 MI WEST MGL CO 19/25 (Lat: 39.660189,  Lng: -80.008919),  Route carried "on" structure: County highway 1940,  Year Built: 2007,  Status: Open,  Structure Length: 1.45m (4.76ft),  Average Daily Traffic: 50 (year 2016),  Average Future Daily Traffic: 75 (year 2036),  Features Intersected: SCOTTS RUN,  Facility Carried by Structure: MGL CO RT 19/40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A304,  Location: 0.03 MI SOUTH CO RT 19/12 (Lat: 39.660361,  Lng: -80.004631),  Route carried "on" structure: US 1900,  Year Built: 2008,  Status: Open,  Structure Length: 11.52m (37.80ft),  Average Daily Traffic: 10,800 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,700 (year 2038),  Design Load: HL 93,  Features Intersected: US ROUTE 19,  Facility Carried by Structure: US ROUTE 19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.108,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.3m (125.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A174,  Location: 2.34 MI NORTH US RT 19 (Lat: 39.655000,  Lng: -80.010500),  Route carried "under" structure: County highway 1924,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 33,800 (year 0018),  Truck Traffic: 6%,  Features Intersected: Mon. Co. 19/24,  Facility Carried by Structure: INTERSTATE 79 SB
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 4.458,  Lanes on structure: 3,  Lanes under structure: 3,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 31A184,  Location: 0.49 MI NORTH CR 19/8 (Lat: 39.667561,  Lng: -79.985700),  Route carried "under" structure: State highway 10000,  Year Built: 1946,  Structure Length: 0. m,  Average Daily Traffic: 3,200 (year 2019),  Truck Traffic: 7%,  Features Intersected: MINE CONVEYOR,  Facility Carried by Structure: MINE CONVEYOR BELT
Minimum Vertical Clearance: 7.52m (24.67ft),  Kilometerpoint: 2.494,  Lanes under structure: 2,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 31A219,  Location: 2.34 MI NORTH US RT 19 (Lat: 39.654900,  Lng: -80.010200),  Route carried "under" structure: County highway 1924,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 33,800 (year 0018),  Truck Traffic: 6%,  Features Intersected: Mon. Co. 19/24,  Facility Carried by Structure: INTERSTATE 79 NB
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 4.458,  Lanes on structure: 2,  Lanes under structure: 3,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 31A304,  Location: 0.03 MI SOUTH CO RT 19/12 (Lat: 39.660361,  Lng: -80.004631),  Route carried "under" structure: County highway 1925,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 600 (year 0018),  Truck Traffic: 6%,  Features Intersected: US ROUTE 19,  Facility Carried by Structure: US ROUTE 19
Minimum Vertical Clearance: 11.41m (37.43ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 38.3m (125.7ft)

Discuss Granville, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.