Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Goliad, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 256ft / 77.7mTotal length
  • $786,000Total costs
  • 63,428Total average daily traffic
  • 17,090Total average daily truck traffic
  • 120,890Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Goliad
  • No street view available for this location

New bridges in Goliad, TX - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 41930-1939
  • 51940-1949
  • 11950-1959
  • 21980-1989
  • 21990-1999
  • 32000-2009
Reconstructed bridges in Goliad, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41950-1959
  • 11960-1969
  • 31970-1979
  • 01980-1989
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in Goliad, TX
Average Bridge Truck Traffic in Goliad, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 77.8%Good
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 77.8%Good
  • 11.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 55.6%Good
  • 44.4%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.8%Very good
  • 33.3%Good
  • 52.4%Satisfactory
  • 9.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 61.5%Good
  • 38.5%Satisfactory
Find on map >>   Show street view

Structure Number: 160890008802005,  Location: 0.65 MI SW OF FM 883 (Lat: 28.524392,  Lng: -97.605217),  Route carried "on" structure: US 59,  Year Built: 1930,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 8.92m (29.27ft),  Average Daily Traffic: 3,731 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 7,320 (year 2033),  Features Intersected: BLANCO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.731,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 6,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 160890008802008,  Location: 3.5 MI W OF US 183 (Lat: 28.647467,  Lng: -97.437417),  Route carried "on" structure: US 59,  Year Built: 1929,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,392 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 7,610 (year 2033),  Features Intersected: MCCAMPBELL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.323,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 160890008802009,  Location: 3.0 MI SW OF US 183 (Lat: 28.650983,  Lng: -97.432961),  Route carried "on" structure: US 59,  Year Built: 1930,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 29.67m (97.34ft),  Average Daily Traffic: 3,392 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 7,610 (year 2033),  Design Load: H 15,  Features Intersected: SAN ANTONIO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.594,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 29,  Length of Maximum Span: 29.7m (97.4ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16089000880201,  Location: 2.2 MI W OF US 183 (Lat: 28.659069,  Lng: -97.423961),  Route carried "on" structure: US 59,  Year Built: 1929,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 3,392 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 7,610 (year 2033),  Features Intersected: DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.495,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 160890008802011,  Location: 1.8 MI W OF US 183 (Lat: 28.663992,  Lng: -97.418503),  Route carried "on" structure: US 59,  Year Built: 1929,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,392 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 7,610 (year 2033),  Features Intersected: PEPPER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.718,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 160890008802012,  Location: 0.1 MI E OF US 183 (Lat: 28.668303,  Lng: -97.386758),  Route carried "on" structure: US 59,  Year Built: 1929,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 7,552 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 13,600 (year 2033),  Features Intersected: SPARROW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 160890008803013,  Location: 3.1 MI E OF US 183 (Lat: 28.676164,  Lng: -97.337589),  Route carried "on" structure: US 59,  Year Built: 1929,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 5,897 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 11,080 (year 2033),  Features Intersected: DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.701,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 160890008803082,  Location: 0.55 MI E OF US 183/77A (Lat: 28.668772,  Lng: -97.379764),  Route carried "on" structure: US 59,  Year Built: 2008,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 7,024 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 13,600 (year 2033),  Design Load: HS 20,  Features Intersected: DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.839,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 160890015503006,  Location: 0.1 MI N OF US 59 (Lat: 28.670158,  Lng: -97.388681),  Route carried "on" structure: US 183,  Year Built: 1930,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 4,311 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,110 (year 2033),  Features Intersected: SPARROW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.093,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 19.4m (63.6ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 160890015504008,  Location: 0.3 MI S OF US 59 (Lat: 28.664150,  Lng: -97.387375),  Route carried "on" structure: US 183,  Year Built: 1936,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,483 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,520 (year 2033),  Features Intersected: SPARROW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.478,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 160890015504024,  Location: 2.7 MI S OF US 59 (Lat: 28.629756,  Lng: -97.383156),  Route carried "on" structure: US 183,  Year Built: 1948,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,793 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 4,020 (year 2033),  Features Intersected: CADENA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.366,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.1m (6.9ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 160890015504038,  Location: 1.3 MI S OF US 59 (Lat: 28.649350,  Lng: -97.384681),  Route carried "on" structure: US 183,  Year Built: 2000,  Status: Open,  Structure Length: 12.80m (41.99ft),  Average Daily Traffic: 3,397 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 5,900 (year 2033),  Design Load: HS 20,  Features Intersected: SAN ANTONIO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.044,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 3.6m (11.8ft),  Right: 0.0m,  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 160890015504039,  Location: 1.2 MI S OF US 59 (Lat: 28.651878,  Lng: -97.384872),  Route carried "on" structure: US 183,  Year Built: 2000,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 3,397 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,520 (year 2033),  Design Load: HS 20,  Features Intersected: SAN ANTONIO RI REL-PR 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.846,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 18.8m (61.7ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16089005160201,  Location: 2.3 MI NW OF US 59 (Lat: 28.667653,  Lng: -97.455033),  Route carried "on" structure: State highway 239,  Year Built: 1947,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,467 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 4,420 (year 2033),  Features Intersected: DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.173,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $48,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $60,000
Find on map >>   Show street view

Structure Number: 160890051602011,  Location: 1.4 MI NW OF US 59 (Lat: 28.665111,  Lng: -97.441089),  Route carried "on" structure: State highway 239,  Year Built: 1947,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,467 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 4,420 (year 2033),  Features Intersected: DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.599,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $81,000
Find on map >>   Show street view

Structure Number: 160890051602012,  Location: 0.2 MI NW OF US 59 (Lat: 28.664869,  Lng: -97.420703),  Route carried "on" structure: State highway 239,  Year Built: 1947,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 2,467 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 4,420 (year 2033),  Features Intersected: DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.543,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $137,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $171,000
Find on map >>   Show street view

Structure Number: 160890155101003,  Location: 3.5 MI N OF US 59 (Lat: 28.714658,  Lng: -97.430733),  Route carried "on" structure: State highway 1726,  Year Built: 1981,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 264 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 420 (year 2033),  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.964,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 160890AA0152001,  Location: 0.60 MI W OF US77A/US183 (Lat: 28.709631,  Lng: -97.397444),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 105 (year 2011),  Average Future Daily Traffic: 150 (year 2031),  Features Intersected: MANAHUILLA CREEK TRIB,  Facility Carried by Structure: OLD GOLIAD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $436,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 160890AA0208001,  Location: 0.50 MI E OF US 183 (Lat: 28.664756,  Lng: -97.381086),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 750 (year 2015),  Average Future Daily Traffic: 1,000 (year 2035),  Features Intersected: DRAW,  Facility Carried by Structure: FANNIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 160890AA0228001,  Location: 0.40 MI S OF FANNIN ST (Lat: 28.659542,  Lng: -97.398022),  Route carried "on" structure: County highway ,  Year Built: 1950,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 70 (year 2015),  Average Future Daily Traffic: 50 (year 2035),  Features Intersected: DRAW,  Facility Carried by Structure: SAN PATRICIO ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 3.2m (10.5ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 160890B00095001,  Location: 0.10 MI E OF US 183 (Lat: 28.665867,  Lng: -97.387025),  Route carried "on" structure: City street ,  Year Built: 1941,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 55 (year 2015),  Average Future Daily Traffic: 100 (year 2035),  Features Intersected: SPARROW CREEK,  Facility Carried by Structure: END STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $36,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 160890B00105001,  Location: 0.05 MI E OF US 183 (Lat: 28.664739,  Lng: -97.387133),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 630 (year 2015),  Average Future Daily Traffic: 800 (year 2035),  Design Load: HS 20,  Features Intersected: SPARROW CREEK,  Facility Carried by Structure: FANNIN ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Goliad, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.