Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Golden Grove, South Carolina (SC)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 299ft / 91.2mTotal length
  • $1,080,000Total costs
  • 68,575Total average daily traffic
  • 5,190Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Golden Grove
  • No street view available for this location

New bridges in Golden Grove, SC - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 11960-1969
  • 11970-1979
  • 11990-1999
  • 152000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Golden Grove, SC - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 02010-2019
  • 22020-2022
Average Bridge Daily Traffic in Golden Grove, SC
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Excellent
  • 50.0%Very good
  • 38.9%Good
  • 5.6%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.6%Excellent
  • 72.2%Very good
  • 16.7%Good
  • 5.6%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.6%Excellent
  • 72.2%Very good
  • 22.2%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 70.0%Very good
  • 20.0%Good
  • 10.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1713,  Location: 8 MI SW OF GREENVILLE (Lat: 34.740072,  Lng: -82.440525),  Route carried "on" structure: State highway 20,  Year Built: 1950,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 4,200 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,334 (year 2040),  Design Load: HS 15,  Features Intersected: SCL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.297,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1714,  Location: 8 MI SW OF GREENVILLE (Lat: 34.740222,  Lng: -82.439797),  Route carried "on" structure: State highway 20,  Year Built: 1950,  Year Reconstructed: 2020,  Status: Posted for load,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 4,200 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,334 (year 2040),  Design Load: HS 15,  Features Intersected: SOUTHERN RR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.361,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Other Special Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1715,  Location: 10.5 MI S GREENVILLE (Lat: 34.697494,  Lng: -82.413808),  Route carried "on" structure: State highway 86,  Year Built: 1950,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 7,100 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,780 (year 2040),  Design Load: H 20,  Features Intersected: TRIB TO GROVE CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.661,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 31.1m (102.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 4134,  Location: 7.9MI SW MAULDIN (Lat: 34.711158,  Lng: -82.422214),  Route carried "on" structure: State highway 316,  Year Built: 1963,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 1,300 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,989 (year 2040),  Design Load: H 15,  Features Intersected: GROVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.078,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 11.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 5.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $360,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $540,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5947,  Location: 8.6MI S GREENVILLE (Lat: 34.723847,  Lng: -82.420031),  Route carried "on" structure: State highway 106,  Year Built: 1971,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 2,900 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,437 (year 2040),  Design Load: H 15,  Features Intersected: GROVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.921,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 13.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 8.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $360,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $540,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9431,  Location: 10.2 MI S GREENVILLE (Lat: 34.700297,  Lng: -82.425500),  Route carried "on" structure: State highway 86,  Year Built: 1999,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 7,100 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,780 (year 2040),  Design Load: HS 20,  Features Intersected: GROVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.627,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.02m (9.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9606,  Location: SOUTH OF GREENVILLE (Lat: 34.730964,  Lng: -82.419278),  Route carried "on" structure: Interstate 185,  Year Built: 2000,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 3,200 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,576 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GROVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.652,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9607,  Location: SOUTH OF GREENVILLE (Lat: 34.730747,  Lng: -82.419158),  Route carried "on" structure: Interstate 185,  Year Built: 2000,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 3,200 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,576 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GROVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.659,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9608,  Location: SOUTH OF GREENVILLE (Lat: 34.741811,  Lng: -82.436036),  Route carried "on" structure: Interstate 185,  Year Built: 2000,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 3,200 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,576 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SC 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.649,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.64m (18.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9609,  Location: SOUTH OF GREENVILLE (Lat: 34.741653,  Lng: -82.436169),  Route carried "on" structure: Interstate 185,  Year Built: 2000,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 3,200 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,576 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SC 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.678,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.64m (18.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9611,  Location: SOUTH OF GREENVILLE (Lat: 34.743878,  Lng: -82.437942),  Route carried "on" structure: Ramp Interstate 185,  Year Built: 2000,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 25 (year 2020),  Average Future Daily Traffic: 45 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSX&NS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.232,  Lanes on structure: 1,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9614,  Location: SOUTH OF GREENVILLE (Lat: 34.743567,  Lng: -82.438064),  Route carried "on" structure: Interstate 185,  Year Built: 2000,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,433 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSXT &NS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.912,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.98m (22.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9615,  Location: SOUTH OF GREENVILLE (Lat: 34.743344,  Lng: -82.438131),  Route carried "on" structure: Interstate 185,  Year Built: 2000,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,433 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSXT & NS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.931,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.98m (22.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9618,  Location: SOUTH OF GREENVILLE (Lat: 34.762983,  Lng: -82.451553),  Route carried "on" structure: Interstate 185,  Year Built: 2000,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,433 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SC 153
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.657,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 962,  Location: SOUTH OF GREENVILLE (Lat: 34.763047,  Lng: -82.451775),  Route carried "on" structure: Interstate 185,  Year Built: 2000,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,433 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SC 153
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.638,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 40.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9641,  Location: SOUTH OF GREENVILLE (Lat: 34.730283,  Lng: -82.415728),  Route carried "on" structure: Interstate 185,  Year Built: 2000,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 3,200 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,576 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TRIB GROVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.314,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9642,  Location: SOUTH OF GREENVILLE (Lat: 34.730108,  Lng: -82.415825),  Route carried "on" structure: Interstate 185,  Year Built: 2000,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 3,200 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,576 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TRIB TO GROVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.340,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10308,  Location: 7.4 MI SW OF GREENVILLE (Lat: 34.750033,  Lng: -82.449711),  Route carried "on" structure: County highway 1162,  Year Built: 2018,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 256 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TRIB TO SALUDA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.885,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10575,  Location: 7 MI W OF MAULDIN (Lat: 34.740036,  Lng: -82.421019),  Route carried "on" structure: County highway 27,  Year Built: 2021,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,850 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,831 (year 2041),  Design Load: HL 93,  Features Intersected: GROVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.961,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9608,  Location: SOUTH OF GREENVILLE (Lat: 34.741811,  Lng: -82.436036),  Route carried "under" structure: State highway 20,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 2,100 (year 2020),  Truck Traffic: 4%,  Features Intersected: SC 20,  Facility Carried by Structure: I-185 NBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.911,  Lanes on structure: 3,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 9609,  Location: SOUTH OF GREENVILLE (Lat: 34.741653,  Lng: -82.436169),  Route carried "under" structure: State highway 20,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 2,100 (year 2020),  Truck Traffic: 4%,  Features Intersected: SC 20,  Facility Carried by Structure: I-185 SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.911,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 9618,  Location: SOUTH OF GREENVILLE (Lat: 34.762983,  Lng: -82.451553),  Route carried "under" structure: State highway 153,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 1,950 (year 2020),  Truck Traffic: 14%,  Features Intersected: SC 153,  Facility Carried by Structure: I-185 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 962,  Location: SOUTH OF GREENVILLE (Lat: 34.763047,  Lng: -82.451775),  Route carried "under" structure: State highway 153,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 1,950 (year 2020),  Truck Traffic: 14%,  Features Intersected: SC 153,  Facility Carried by Structure: I-185 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Discuss Golden Grove, South Carolina (SC) on our hugely popular South Carolina forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.