Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Gibsland, Louisiana (LA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 430ft / 131mTotal length
  • $6,475,000Total costs
  • 312,300Total average daily traffic
  • 66,724Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gibsland
  • No street view available for this location

New bridges in Gibsland, LA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11950-1959
  • 101960-1969
  • 31970-1979
  • 41980-1989
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Gibsland, LA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
Average Bridge Daily Traffic in Gibsland, LA
Average Bridge Truck Traffic in Gibsland, LA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 33.3%Satisfactory
  • 33.3%Fair
  • 9.5%Poor
  • 4.8%Imminent failure
  • 4.8%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 19.0%Satisfactory
  • 52.4%Fair
  • 9.5%Poor
  • 4.8%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 9.5%Good
  • 33.3%Satisfactory
  • 28.6%Fair
  • 4.8%Poor
  • 4.8%Critical
  • 4.8%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.6%Very good
  • 35.3%Good
  • 47.1%Satisfactory
Find on map >>   Show street view

Structure Number: 40700000000113,  Location: 5.5 MI E OF LA 507 (Lat: 32.276381,  Lng: -93.082811),  Route carried "on" structure: State highway 4,  Year Built: 2021,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 650 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 800 (year 2039),  Design Load: Greater than HL93,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.927,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40700000040307,  Location: 1.1 MI EAST OF LA 154 (Lat: 32.546539,  Lng: -93.034681),  Route carried "on" structure: US 80,  Year Built: 2012,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 1,180 (year 2016),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,108 (year 2036),  Design Load: HS 20,  Features Intersected: BLACK LAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.454,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 40700000301176,  Location: 1.94 MI SOUTHEAST OF US 8 (Lat: 32.531519,  Lng: -93.016661),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 150 (year 2020),  Average Future Daily Traffic: 255 (year 2036),  Design Load: HS 20,  Features Intersected: TRIB TO BLACK LAKE CREEK,  Facility Carried by Structure: Grover Jones Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 40700010605801,  Location: 4.0 MI SOUTH OF I-20 (Lat: 32.545931,  Lng: -93.108000),  Route carried "on" structure: US 80,  Year Built: 1984,  Status: Open,  Structure Length: 15.30m (50.20ft),  Average Daily Traffic: 1,320 (year 2016),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,312 (year 2036),  Design Load: HS 20,  Features Intersected: LEATHERMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.312,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 25,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40700010606621,  Location: 4.8 MI SOUTH OF I-20 (Lat: 32.546169,  Lng: -93.094200),  Route carried "on" structure: US 80,  Year Built: 1984,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 1,320 (year 2016),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,312 (year 2036),  Design Load: HS 20,  Features Intersected: BRINSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.609,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40700010607041,  Location: 5.2 MI SOUTH OF I-20 (Lat: 32.546300,  Lng: -93.086800),  Route carried "on" structure: US 80,  Year Built: 1984,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 1,320 (year 2016),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,312 (year 2036),  Design Load: HS 20,  Features Intersected: BLACK LAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.299,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40700010609771,  Location: 0.6 MI EAST OF LA 154 (Lat: 32.545061,  Lng: -93.042400),  Route carried "on" structure: US 80,  Year Built: 1953,  Status: Posted for load,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 1,180 (year 2016),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,108 (year 2036),  Design Load: HS 20,  Features Intersected: SLOUGH BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.672,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 14.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $278,000,  Total Project Cost: $417,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 40700880500571,  Location: .57 MI NORTH OF US 80 (Lat: 32.553250,  Lng: -93.053300),  Route carried "on" structure: State highway 154,  Year Built: 1971,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 1,380 (year 2016),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,380 (year 2036),  Design Load: HS 20,  Features Intersected: BLACK LAKE RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.895,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40700880500641,  Location: .64 MI NORTH OF US 80 (Lat: 32.554239,  Lng: -93.053700),  Route carried "on" structure: State highway 154,  Year Built: 1971,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 1,380 (year 2016),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,380 (year 2036),  Design Load: HS 20,  Features Intersected: BLACK LAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.011,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40700880501241,  Location: LA 154 OVER I-20 (Lat: 32.563031,  Lng: -93.054200),  Route carried "on" structure: State highway 154,  Year Built: 1964,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 680 (year 2016),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,139 (year 2036),  Design Load: HS 20,  Features Intersected: LA 154 OVER I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.992,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40704510404551,  Location: 3.5 MI EAST OF US 80 (Lat: 32.563050,  Lng: -93.097700),  Route carried "on" structure: Interstate 20,  Year Built: 1964,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 16,750 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 33,150 (year 2036),  Design Load: HS 20,  Features Intersected: CANEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.310,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 451-04-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40704510404552,  Location: 3.5 MI EAST OF US 80 (Lat: 32.563300,  Lng: -93.097300),  Route carried "on" structure: Interstate 20,  Year Built: 1964,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 16,750 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 33,150 (year 2036),  Design Load: HS 20,  Features Intersected: CANEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.580,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 451-04-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $403,000,  Total Project Cost: $604,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40704510404991,  Location: 3.9 MI EAST OF US 80 (Lat: 32.563281,  Lng: -93.090200),  Route carried "on" structure: Interstate 20,  Year Built: 1964,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 16,750 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 33,150 (year 2036),  Design Load: HS 20,  Features Intersected: DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.011,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 451-04-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: December 2020,  Bridge Improvement Cost: $533,000,  Total Project Cost: $799,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40704510404992,  Location: 3.9 MI EAST OF US 80 (Lat: 32.563539,  Lng: -93.089700),  Route carried "on" structure: Interstate 20,  Year Built: 1964,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 33,500 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 33,150 (year 2036),  Design Load: HS 20,  Features Intersected: DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.863,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 451-04-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $533,000,  Total Project Cost: $799,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40704510405281,  Location: 1.86 MI WEST OF LA 154 (Lat: 32.563319,  Lng: -93.085200),  Route carried "on" structure: Interstate 20,  Year Built: 1964,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 16,750 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 33,150 (year 2036),  Design Load: HS 20,  Features Intersected: LEATHERMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.481,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 451-04-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.77m (25.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $663,000,  Total Project Cost: $994,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40704510405292,  Location: 1.86 MI WEST OF LA 154 (Lat: 32.563561,  Lng: -93.084200),  Route carried "on" structure: Interstate 20,  Year Built: 1964,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 16,750 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 33,150 (year 2036),  Design Load: HS 20,  Features Intersected: LEATHERMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.348,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 451-04-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.77m (25.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $663,000,  Total Project Cost: $994,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40704510406521,  Location: 0.56 MI WEST OF LA 154 (Lat: 32.563261,  Lng: -93.063900),  Route carried "on" structure: Interstate 20,  Year Built: 1986,  Status: Open,  Structure Length: 11.03m (36.19ft),  Average Daily Traffic: 16,750 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 33,150 (year 2036),  Design Load: HS 20,  Features Intersected: L & N W RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.485,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes (Inventory Route: 451-04-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40704510406522,  Location: .56 MI WEST OF LA 154 (Lat: 32.563500,  Lng: -93.062700),  Route carried "on" structure: Interstate 20,  Year Built: 1964,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 16,750 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 33,150 (year 2036),  Design Load: HS 20,  Features Intersected: L & NW R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.326,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes (Inventory Route: 451-04-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40704510407391,  Location: 1.3 MI EAST OF LA 154 (Lat: 32.563189,  Lng: -93.048900),  Route carried "on" structure: Interstate 20,  Year Built: 1964,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 29,200 (year 2016),  Truck Traffic: 36%,  Average Future Daily Traffic: 48,790 (year 2036),  Design Load: HS 20,  Features Intersected: BLACK LAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.891,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 451-04-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40704510409501,  Location: 2.5 MI EAST OF LA 154 (Lat: 32.561431,  Lng: -93.012900),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 8.90m (29.20ft),  Average Daily Traffic: 2,870 (year 2015),  Average Future Daily Traffic: 4,879 (year 2036),  Design Load: HS 20,  Features Intersected: I-20,  Facility Carried by Structure: BREWER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.276,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 451-04-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.81m (32.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $837,000,  Total Project Cost: $1,255,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 40732323930191,  Location: 1.0 MI. S.E. OF U.S. (Lat: 32.539119,  Lng: -93.031181),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Temporarily open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 170 (year 2020),  Average Future Daily Traffic: 289 (year 2036),  Design Load: H 10,  Features Intersected: TRIB. TO BLACKLAKE CREEK,  Facility Carried by Structure: Grover Jones Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Satisfactory,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: May 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $109,000,  Total Project Cost: $163,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 40732328930391,  Location: 300 FT. NO. OF U.S. (Lat: 32.546411,  Lng: -93.056961),  Route carried "on" structure: County highway ,  Year Built: 1940,  Year Reconstructed: 1975,  Status: Closed,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 150 (year 2020),  Average Future Daily Traffic: 255 (year 2036),  Design Load: HS 15,  Features Intersected: KCS RAILROAD,  Facility Carried by Structure: Sparta Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Imminent failure,  Superstructure: Poor,  Substructure: Critical,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.03m (16.50ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: May 2021,  Other Special Inspection Date: November 2020,  Bridge Improvement Cost: $300,000,  Total Project Cost: $450,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 40700880501241,  Location: I-20 W UNDER LA 154 (Lat: 32.563461,  Lng: -93.054131),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 28,700 (year 2016),  Features Intersected: I-20 W AND LA 154 NB
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 16.525,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 40700880501241,  Location: I-20 E UNDER LA 154 (Lat: 32.563231,  Lng: -93.054289),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 32,500 (year 2016),  Features Intersected: I-20 E AND LA 154
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 11.388,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 40704510409501,  Location: I-20 E UNDER BREWER RD (Lat: 32.561619,  Lng: -93.013111),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 28,700 (year 2016),  Features Intersected: I-20 E &BREWER RD SB
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 15.276,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 40704510409501,  Location: I-20 W UNDER BREWER RD (Lat: 32.561869,  Lng: -93.013150),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 28,700 (year 2016),  Features Intersected: I-20 W AND BREWER RD NB
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 12.654,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Gibsland, Louisiana (LA) on our hugely popular Louisiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.