Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fultondale, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 417ft / 127mTotal length
  • $84,817,000Total costs
  • 519,616Total average daily traffic
  • 91,052Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fultondale
  • No street view available for this location

New bridges in Fultondale, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 31930-1939
  • 11960-1969
  • 81970-1979
  • 71980-1989
  • 11990-1999
  • 32000-2009
  • 32010-2019
Average Bridge Daily Traffic in Fultondale, AL
Average Bridge Truck Traffic in Fultondale, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.8%Very good
  • 31.3%Good
  • 37.5%Satisfactory
  • 6.3%Fair
  • 6.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.8%Very good
  • 18.8%Good
  • 43.8%Satisfactory
  • 12.5%Fair
  • 6.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Very good
  • 50.0%Good
  • 31.3%Satisfactory
  • 6.3%Fair
  • 6.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Very good
  • 33.3%Good
  • 41.7%Satisfactory
  • 16.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Good
  • 80.0%Satisfactory
Find on map >>   Show street view

Structure Number: 923,  Location: OLD US 31 * BLACK CREEK (Lat: 33.583333,  Lng: -86.816667),  Route carried "on" structure: City street ,  Year Built: 1931,  Status: Closed,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 1,250 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,000 (year 2040),  Design Load: H 15,  Features Intersected: RAILROAD * BLACK CK,  Facility Carried by Structure: CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $1,779,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $1,957,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1351,  Location: .75 MILE N. OF FULTONDALE (Lat: 33.622108,  Lng: -86.803239),  Route carried "on" structure: City street 223,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,960 (year 2040),  Features Intersected: BLACK CREEK TRIBUTARY,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Channel: Fair,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.32m (4.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $240,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1101,  Location: FULTONDALE (Lat: 33.621667,  Lng: -86.803333),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 1,886 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: H 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: STOUTS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $472,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $519,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11348,  Location: FULTONDALE INTERCHANGE (Lat: 33.584236,  Lng: -86.805606),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 1975,  Status: Open,  Structure Length: 10.98m (36.02ft),  Average Daily Traffic: 7,575 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 9,597 (year 2040),  Design Load: HS 20,  Features Intersected: I - 65,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 427.154,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.87m (38.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,255,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $3,581,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1135,  Location: FULTONDALE INTERCHANGE (Lat: 33.585200,  Lng: -86.807400),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 1975,  Status: Open,  Structure Length: 12.86m (42.19ft),  Average Daily Traffic: 7,575 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 9,597 (year 2040),  Design Load: HS 20,  Features Intersected: I - 65,  Facility Carried by Structure: RAMP C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 427.041,  Lanes on structure: 1,  Lanes under structure: 12,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 13.69m (44.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,441,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $2,685,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11596,  Location: US 31 * 5 MILE CK (Lat: 33.590000,  Lng: -86.803611),  Route carried "on" structure: US 31,  Year Built: 1976,  Status: Open,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 21,130 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 27,143 (year 2041),  Design Load: HS 20,  Features Intersected: 5 MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 450.941,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 30.7m (100.7ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,596,000,  Roadway Improvement Cost: $560,000,  Total Project Cost: $6,156,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12221,  Location: 0.4 MI E SHADY GROVE RD (Lat: 33.612033,  Lng: -86.842511),  Route carried "on" structure: County highway 120,  Year Built: 1979,  Status: Closed,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 1,500 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,680 (year 2041),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: WALKERS CHAPEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.0m (39.4ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.37m (11.06ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $416,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $458,000 ( Estimate for 2022),  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 12921,  Location: .5 MI. NO. WALKERS CHAPEL (Lat: 33.616508,  Lng: -86.813656),  Route carried "on" structure: Interstate 65,  Year Built: 1983,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 33,375 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 42,283 (year 2040),  Design Load: HS 20,  Features Intersected: CITY OF FULTONDALE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 430.454,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.74m (22.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,679,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $2,947,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12922,  Location: .5 MI. NO. WALKERS CHAPEL (Lat: 33.616478,  Lng: -86.813350),  Route carried "on" structure: Interstate 65,  Year Built: 1983,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 33,375 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 42,283 (year 2040),  Design Load: HS 20,  Features Intersected: CITY OF FULTONDALE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 430.454,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.74m (22.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,679,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $2,947,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13176,  Location: I65 * WALKER CHAPEL RD (Lat: 33.608178,  Lng: -86.809119),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 11.43m (37.50ft),  Average Daily Traffic: 5,500 (year 2000),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,500 (year 2040),  Design Load: HS 20,  Features Intersected: I65,  Facility Carried by Structure: WALKER CHAPEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 6,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 23.4m (76.8ft),  Out-to-Out Width: 28.2m (92.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.30m (40.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $7,762,000,  Roadway Improvement Cost: $776,000,  Total Project Cost: $8,538,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13177,  Location: .3 MI. NO.WALKERS CHAPEL (Lat: 33.615803,  Lng: -86.813067),  Route carried "on" structure: Interstate 65,  Year Built: 1984,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 66,750 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 84,567 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 430.376,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $9,688,000,  Roadway Improvement Cost: $969,000,  Total Project Cost: $10,657,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13178,  Location: I65 * RIDGE BROOK ROAD (Lat: 33.622097,  Lng: -86.817128),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 10.49m (34.42ft),  Average Daily Traffic: 700 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 800 (year 2040),  Design Load: HS 20,  Features Intersected: I 65,  Facility Carried by Structure: RIDGE BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.40m (37.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,814,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $3,095,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16691,  Location: 100' S YARBROUGH RD (Lat: 33.619350,  Lng: -86.789317),  Route carried "on" structure: County highway 224,  Year Built: 1979,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 17,505 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 24,500 (year 2039),  Design Load: HS 20,  Features Intersected: BLACK CREEK TRIBUTARY,  Facility Carried by Structure: CARSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.6m (31.5ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $541,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16692,  Location: 0.5 MI N US 31 (Lat: 33.617267,  Lng: -86.791267),  Route carried "on" structure: County highway 224,  Year Built: 1930,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 17,525 (year 2021),  Truck Traffic: 22%,  Average Future Daily Traffic: 24,500 (year 2041),  Design Load: HS 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: CARSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $510,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $561,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16694,  Location: 1 MI NE PINEHILL RD (Lat: 33.640131,  Lng: -86.768456),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 6,825 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 9,500 (year 2039),  Design Load: HS 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: CARSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $875,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $963,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17061,  Location: 0.5MI S PINE HILL RD (Lat: 33.624667,  Lng: -86.784267),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 9,625 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 11,570 (year 2041),  Design Load: HS 20,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: CARSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 62.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.14m (16.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,481,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $1,629,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17841,  Location: LOWER COALBURG (Lat: 33.587100,  Lng: -86.838600),  Route carried "on" structure: Interstate 22,  Year Built: 2006,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 11,910 (year 2021),  Truck Traffic: 33%,  Average Future Daily Traffic: 16,136 (year 2041),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.002,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.47m (4.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $7,655,000,  Roadway Improvement Cost: $766,000,  Total Project Cost: $8,421,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17842,  Location: NORTH OF COALBURG RD (Lat: 33.588400,  Lng: -86.847100),  Route carried "on" structure: Interstate 22,  Year Built: 2007,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 11,910 (year 2020),  Truck Traffic: 33%,  Average Future Daily Traffic: 16,136 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.100,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 44.5m (146.0ft),  Out-to-Out Width: 304.5m (999.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $7,907,000,  Roadway Improvement Cost: $791,000,  Total Project Cost: $8,698,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18224,  Location: 0.75 MI E US 31 (Lat: 33.615817,  Lng: -86.784967),  Route carried "on" structure: County highway 124,  Year Built: 2004,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 8,700 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 10,100 (year 2040),  Design Load: HS 20,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: BLACK CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.2m (128.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 73.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.08m (16.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,463,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $1,609,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19045,  Location: FULTONDALE (Lat: 33.590400,  Lng: -86.805400),  Route carried "on" structure: Interstate 65,  Year Built: 2015,  Status: Open,  Structure Length: 17.64m (57.87ft),  Design Load: HS 20,  Features Intersected: 5 MILE CK * ELLARD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 427.876,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 29.5m (96.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.34m (60.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $12,073,000,  Roadway Improvement Cost: $1,207,000,  Total Project Cost: $13,280,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19048,  Location: NO. I-22/I-65 INT. (Lat: 33.587303,  Lng: -86.804778),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 2016,  Status: Open,  Structure Length: 16.09m (52.79ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 750 (year 2040),  Design Load: HS 20,  Features Intersected: AL - 3 (US 31)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 426.734,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 64.8m (212.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.84m (55.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $4,850,000,  Roadway Improvement Cost: $485,000,  Total Project Cost: $5,335,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 106,  Location: 100' N YARBROUGH ROAD (Lat: 33.620017,  Lng: -86.788933),  Route carried "under" structure: County highway 121,  Year Built: 1915,  Structure Length: 0. m,  Average Daily Traffic: 17,380 (year 2006),  Truck Traffic: 20%,  Features Intersected: CARSON ROAD,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.010,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 11348,  Location: FULTONDALE INTERCHANGE (Lat: 33.584236,  Lng: -86.805606),  Route carried "under" structure: US 31,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 11,960 (year 2020),  Truck Traffic: 6%,  Features Intersected: I - 65,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 450.294,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 1135,  Location: FULTONDALE INTERCHANGE (Lat: 33.585200,  Lng: -86.807400),  Route carried "under" structure: Interstate 65,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 75,750 (year 2020),  Truck Traffic: 17%,  Features Intersected: I - 65,  Facility Carried by Structure: RAMP C
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 427.041,  Lanes on structure: 1,  Lanes under structure: 12,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 13176,  Location: I65 * WALKER CHAPEL RD (Lat: 33.608178,  Lng: -86.809119),  Route carried "under" structure: Interstate 65,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 66,360 (year 2020),  Truck Traffic: 18%,  Features Intersected: I65,  Facility Carried by Structure: WALKER CHAPEL RD
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 429.804,  Lanes on structure: 6,  Lanes under structure: 7,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 13178,  Location: I65 * RIDGE BROOK ROAD (Lat: 33.622097,  Lng: -86.817128),  Route carried "under" structure: Interstate 65,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 66,750 (year 2020),  Truck Traffic: 19%,  Features Intersected: I 65,  Facility Carried by Structure: RIDGE BROOK ROAD
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 432.059,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 19048,  Location: NO. I-22/I-65 INT. (Lat: 33.587303,  Lng: -86.804778),  Route carried "under" structure: US 31,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 14,900 (year 2020),  Truck Traffic: 6%,  Features Intersected: AL - 3 (US 31)
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 450.616,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 64.8m (212.6ft)

Discuss Fultondale, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.