Bridge Statistics for Fruitland, Idaho (ID)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 430ft / 131mTotal length
  • $33,577,000Total costs
  • 159,970Total average daily traffic
  • 25,669Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fruitland
  • No street view available for this location

New bridges in Fruitland, ID - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 121960-1969
  • 11970-1979
  • 11980-1989
  • 12000-2009
Reconstructed bridges in Fruitland, ID - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Fruitland, ID
Average Bridge Truck Traffic in Fruitland, ID
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 36.4%Good
  • 45.5%Satisfactory
  • 18.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.3%Good
  • 45.5%Satisfactory
  • 27.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Good
  • 63.6%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 66.7%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 13795,  Location: 0.6 W. FRUITLAND (Lat: 44.024722,  Lng: -116.935000),  Route carried "on" structure: Spur US 30,  Year Built: 1967,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 27.04m (88.71ft),  Average Daily Traffic: 22,300 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 33,450 (year 2039),  Design Load: HS 20,  Features Intersected: SNAKE R;FRUITLAND BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Navigation Control: Yes ( Vertical Clearance: 8.2m (26.9ft), Horizontal Clearance: 59.1m (193.9ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 23.6m (77.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: October 2020,  Underwater Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15325,  Location: 2.0 E. OREGON-IDAHO LINE (Lat: 43.979167,  Lng: -116.923583),  Route carried "on" structure: Interstate 84,  Year Built: 1960,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10,750 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 16,125 (year 2039),  Design Load: HS 20,  Features Intersected: WHITLEY ROAD GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.413,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.7m (41.7ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15335,  Location: 2.0 E. OREGON-IDAHO LINE (Lat: 43.979286,  Lng: -116.923211),  Route carried "on" structure: Interstate 84,  Year Built: 1960,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10,750 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 16,125 (year 2039),  Design Load: HS 20,  Features Intersected: WHITLEY ROAD GS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.412,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.7m (41.7ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18095,  Location: 23.2 W. CALDWELL (Lat: 43.971667,  Lng: -116.914028),  Route carried "on" structure: US 95,  Year Built: 1960,  Status: Open,  Structure Length: 9.63m (31.59ft),  Average Daily Traffic: 7,800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,700 (year 2039),  Design Load: HS 20,  Features Intersected: I 84 EB-WB;US 95 IC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.879,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.7m (74.5ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.67m (35.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,772,000,  Roadway Improvement Cost: $277,000,  Total Project Cost: $4,158,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1811,  Location: 1.8 S. PAYETTE SCL (Lat: 44.041500,  Lng: -116.926361),  Route carried "on" structure: US 95,  Year Built: 1968,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 14.75m (48.39ft),  Average Daily Traffic: 19,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 28,500 (year 2039),  Design Load: HS 20,  Features Intersected: PAYETTE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 106.513,  Lanes on structure: 5,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 24.8m (81.4ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: August 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21495,  Location: IN LEWISTON;BRYDEN EXT (Lat: 46.396667,  Lng: -117.043222),  Route carried "on" structure: City street 7344,  Year Built: 1982,  Status: Open,  Structure Length: 56.88m (186.61ft),  Average Daily Traffic: 20,500 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 30,750 (year 2039),  Design Load: HS 20,  Features Intersected: SNAKE R;HIGH/SOUTHWAY BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 16.4m (53.8ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 19.0m (62.3ft), Horizontal Clearance: 76.0m (249.3ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 185.9m (609.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 56.88m (186.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $19,089,000,  Roadway Improvement Cost: $1,909,000,  Total Project Cost: $28,634,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28403,  Location: 2.2 S 3.5 W NEW PLYMOUTH (Lat: 43.944039,  Lng: -116.889958),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Posted for load,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2040),  Design Load: HS 20,  Features Intersected: A LINE CANAL,  Facility Carried by Structure: SW 3 1/2 AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.309,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $399,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2845,  Location: 2.1 N. 2.1 E. FRUITLAND (Lat: 44.039833,  Lng: -116.871583),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 510 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 765 (year 2039),  Design Load: H 15,  Features Intersected: LOWER PAYETTE DITCH,  Facility Carried by Structure: KILLEBREW DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.450,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $257,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $386,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28455,  Location: 22.8 W. CALDWELL (Lat: 43.967361,  Lng: -116.909833),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 540 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 810 (year 2039),  Design Load: HS 20,  Features Intersected: I 84;FIRST ST SOUTH GS,  Facility Carried by Structure: FIRST ST.SOUTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.325,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.5m (70.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 28465,  Location: 21.7 W. CALDWELL (Lat: 43.955083,  Lng: -116.893750),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 90 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 135 (year 2039),  Design Load: HS 20,  Features Intersected: I 84;ELMORE AVENUE GS,  Facility Carried by Structure: ELMORE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 173.803,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.1m (69.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 3193,  Location: 0.6 S. 2.5 W. EGIN (Lat: 43.927167,  Lng: -111.889194),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 70 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 105 (year 2039),  Design Load: H 20,  Features Intersected: ST. ANTHONY CANAL,  Facility Carried by Structure: E 300 N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.623,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15325,  Location: 2.0 E. OREGON-IDAHO LINE (Lat: 43.979167,  Lng: -116.923583),  Route carried "under" structure: County highway ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 30 (year 2018),  Features Intersected: WHITLEY ROAD GS,  Facility Carried by Structure: I 84 EBL
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 169.338,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 7.3m (24.0ft)

Find on map >>   Show street view

Structure Number: 15335,  Location: 2.0 E. OREGON-IDAHO LINE (Lat: 43.979286,  Lng: -116.923211),  Route carried "under" structure: County highway ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 30 (year 2018),  Features Intersected: WHITLEY ROAD GS,  Facility Carried by Structure: I 84 WBL
Minimum Vertical Clearance: 4.14m (13.58ft),  Kilometerpoint: 169.354,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 7.3m (24.0ft)

Find on map >>   Show street view

Structure Number: 18095,  Location: 23.2 W. CALDWELL (Lat: 43.971667,  Lng: -116.914028),  Route carried "under" structure: Interstate 84,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 22,500 (year 2018),  Truck Traffic: 25%,  Features Intersected: I 84 EB-WB;US 95 IC,  Facility Carried by Structure: US 95
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 4.608,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.7m (74.5ft)

Find on map >>   Show street view

Structure Number: 28455,  Location: 22.8 W. CALDWELL (Lat: 43.967361,  Lng: -116.909833),  Route carried "under" structure: Interstate 84,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 22,500 (year 2018),  Truck Traffic: 25%,  Features Intersected: I 84;FIRST ST SOUTH GS,  Facility Carried by Structure: FIRST ST.SOUTH
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 5.161,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.5m (70.5ft)

Find on map >>   Show street view

Structure Number: 28465,  Location: 21.7 W. CALDWELL (Lat: 43.955083,  Lng: -116.893750),  Route carried "under" structure: Interstate 84,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 22,500 (year 2018),  Truck Traffic: 25%,  Features Intersected: I 84;ELMORE AVENUE GS,  Facility Carried by Structure: ELMORE AVENUE
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 7.002,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.1m (69.2ft)