Bridge Statistics for Fredericksburg, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 243ft / 73.6mTotal length
  • $3,198,000Total costs
  • 178,226Total average daily traffic
  • 30,558Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fredericksburg
  • No street view available for this location

New bridges in Fredericksburg, PA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11940-1949
  • 11950-1959
  • 231960-1969
Reconstructed bridges in Fredericksburg, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Fredericksburg, PA
Average Bridge Truck Traffic in Fredericksburg, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Good
  • 23.1%Satisfactory
  • 53.8%Fair
  • 7.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.1%Good
  • 38.5%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Good
  • 38.5%Satisfactory
  • 46.2%Fair
  • 7.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 14.3%Good
  • 28.6%Fair
  • 42.9%Poor
Find on map >>   Show street view

Structure Number: 13003,  Location: VERNON TOWNSHIP (Lat: 41.652575,  Lng: -80.205039),  Route carried "on" structure: Interstate 79,  Year Built: 1969,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 7,763 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 11,433 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 0102
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.960,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $157,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 13004,  Location: VERNON TOWNSHIP (Lat: 41.662356,  Lng: -80.206889),  Route carried "on" structure: Interstate 79,  Year Built: 1969,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 7,747 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,671 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER CUSSEWAGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.762,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 13005,  Location: VERNON TOWNSHIP (Lat: 41.662614,  Lng: -80.207328),  Route carried "on" structure: Interstate 79,  Year Built: 1969,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 7,763 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 11,433 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER CUSSEWAGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.760,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $421,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 13006,  Location: HAYFIELD TOWNSHIP (Lat: 41.682894,  Lng: -80.206389),  Route carried "on" structure: Interstate 79,  Year Built: 1969,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 7,747 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 10,671 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER T-611,MATT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.176,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 13041,  Location: VERNON TOWNSHIP (Lat: 41.639692,  Lng: -80.206817),  Route carried "on" structure: State highway 98,  Year Built: 1937,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 4,244 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,649 (year 2032),  Design Load: H 20,  Features Intersected: OVER VAN HORNE RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.675,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 13277,  Location: HAYFIELD TOWNSHIP (Lat: 41.672322,  Lng: -80.214000),  Route carried "on" structure: State highway ,  Year Built: 1963,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 319 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 760 (year 2032),  Design Load: HS 20,  Features Intersected: OVER CUSSEWAGO CREEK,  Facility Carried by Structure: SR 2034,ROGERS FRY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.086,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 13278,  Location: HAYFIELD TOWNSHIP (Lat: 41.671250,  Lng: -80.209092),  Route carried "on" structure: State highway ,  Year Built: 1969,  Status: Open,  Structure Length: 11.40m (37.40ft),  Average Daily Traffic: 319 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 760 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 2034,ROGERS FRY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.086,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.40m (40.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 13281,  Location: VERNON TOWNSHIP (Lat: 41.646967,  Lng: -80.171192),  Route carried "on" structure: State highway ,  Year Built: 1950,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 2,472 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,083 (year 2032),  Design Load: H 20,  Features Intersected: OVER CUSSEWAGO CREEK,  Facility Carried by Structure: SR 2039,DUNHAM ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Underwater Inspection Date: September 2021,  Other Special Inspection Date: June 2019,  Bridge Improvement Cost: $46,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $615,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13315,  Location: VERNON TOWNSHIP (Lat: 41.647528,  Lng: -80.203700),  Route carried "on" structure: State highway ,  Year Built: 1969,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 4,964 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,777 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 79 NB/SB,RP SHAF,  Facility Carried by Structure: SR 3016,HARMONSBG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.202,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 13355,  Location: HAYFIELD TOWNSHIP (Lat: 41.698722,  Lng: -80.199914),  Route carried "on" structure: State highway ,  Year Built: 1969,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 12.44m (40.81ft),  Average Daily Traffic: 1,299 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,570 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4009,MOSIERTOWN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.349,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.40m (43.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $106,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $1,433,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 22604,  Location: 1 MI.W. OF T.R. 343 (Lat: 40.436278,  Lng: -76.435992),  Route carried "on" structure: US 22,  Year Built: 1939,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 7,236 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,776 (year 2032),  Design Load: H 20,  Features Intersected: DEEP RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.063,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $32,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $432,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22605,  Location: 0.5 MILE SOUTH FREDRICKSB (Lat: 40.440750,  Lng: -76.427167),  Route carried "on" structure: US 22,  Year Built: 1946,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 9,287 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,788 (year 2032),  Features Intersected: BEACH RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.724,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Underwater Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 22628,  Location: 1.5 MI.W. OF EXIT #1 (Lat: 40.449961,  Lng: -76.446128),  Route carried "on" structure: Interstate 78,  Year Built: 1969,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 22,030 (year 2021),  Truck Traffic: 19%,  Average Future Daily Traffic: 20,217 (year 2032),  Design Load: HS 20,  Features Intersected: T-486, SUGAR RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.226,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $140,000,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 22729,  Location: 0.5 MI.W. OF EXIT #1 (Lat: 40.451667,  Lng: -76.435000),  Route carried "on" structure: State highway ,  Year Built: 1969,  Status: Open,  Structure Length: 7.47m (24.51ft),  Average Daily Traffic: 651 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 944 (year 2032),  Design Load: HS 20,  Features Intersected: I-78; SR 0078,  Facility Carried by Structure: SR 1005
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 13001,  Location: VERNON TOWNSHIP (Lat: 41.652392,  Lng: -80.204644),  Route carried "under" structure: State highway 102,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 1,673 (year 2022),  Truck Traffic: 8%,  Features Intersected: OVER SR 0102,  Facility Carried by Structure: SR 79,NB
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 6.104,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 13003,  Location: VERNON TOWNSHIP (Lat: 41.652575,  Lng: -80.205039),  Route carried "under" structure: State highway 102,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 1,673 (year 2022),  Truck Traffic: 8%,  Features Intersected: OVER SR 0102,  Facility Carried by Structure: SR 79,SB
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 6.104,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 13006,  Location: HAYFIELD TOWNSHIP (Lat: 41.682894,  Lng: -80.206389),  Route carried "under" structure: City street T611,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2003),  Features Intersected: OVER T-611,MATT ROAD,  Facility Carried by Structure: SR 79,NB
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 13007,  Location: HAYFIELD TOWNSHIP (Lat: 41.682967,  Lng: -80.207114),  Route carried "under" structure: City street 611,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2003),  Features Intersected: OVER T-611,MATT ROAD,  Facility Carried by Structure: SR 79,SB
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 13278,  Location: HAYFIELD TOWNSHIP (Lat: 41.671250,  Lng: -80.209092),  Route carried "under" structure: Interstate 79,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,747 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 2034,ROGERS FRY
Minimum Vertical Clearance: 6.50m (21.33ft),  Kilometerpoint: 22.573,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 13278,  Location: HAYFIELD TOWNSHIP (Lat: 41.671250,  Lng: -80.209092),  Route carried "under" structure: Interstate 79,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,763 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 2034,ROGERS FRY
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 22.563,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 13315,  Location: VERNON TOWNSHIP (Lat: 41.647528,  Lng: -80.203700),  Route carried "under" structure: Interstate 79,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,763 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER SR 79 NB/SB,RP SHAF,  Facility Carried by Structure: SR 3016,HARMONSBG
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 20.143,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 13315,  Location: VERNON TOWNSHIP (Lat: 41.647528,  Lng: -80.203700),  Route carried "under" structure: Interstate 79,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,747 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER SR 79 NB/SB,RP SHAF,  Facility Carried by Structure: SR 3016,HARMONSBG
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 20.159,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 13355,  Location: HAYFIELD TOWNSHIP (Lat: 41.698722,  Lng: -80.199914),  Route carried "under" structure: Interstate 79,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,763 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4009,MOSIERTOWN
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 25.859,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 13355,  Location: HAYFIELD TOWNSHIP (Lat: 41.698722,  Lng: -80.199914),  Route carried "under" structure: Interstate 79,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,747 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 4009,MOSIERTOWN
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 25.851,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 22628,  Location: 1.5 MI.W. OF EXIT #1 (Lat: 40.449961,  Lng: -76.446128),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2003),  Features Intersected: T-486, SUGAR RD.,  Facility Carried by Structure: I-78 EB; SR 0078
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 22729,  Location: 0.5 MI.W. OF EXIT #1 (Lat: 40.451667,  Lng: -76.435000),  Route carried "under" structure: Interstate 78,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 22,030 (year 2021),  Truck Traffic: 19%,  Features Intersected: I-78; SR 0078,  Facility Carried by Structure: SR 1005
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 8.039,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 22729,  Location: 0.5 MI.W. OF EXIT #1 (Lat: 40.451667,  Lng: -76.435000),  Route carried "under" structure: Interstate 78,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 22,378 (year 2021),  Truck Traffic: 21%,  Features Intersected: I-78; SR 0078,  Facility Carried by Structure: SR 1005
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 8.024,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)