Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Frankfort, Kansas (KS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 34Number of bridges
  • 318ft / 97.1mTotal length
  • $4,615,000Total costs
  • 9,879Total average daily traffic
  • 1,546Total average daily truck traffic
  • 10,933Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Frankfort
  • No street view available for this location

New bridges in Frankfort, KS - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 31910-1919
  • 11920-1929
  • 101930-1939
  • 31940-1949
  • 11960-1969
  • 11970-1979
  • 41980-1989
  • 21990-1999
  • 72000-2009
  • 12010-2019
Reconstructed bridges in Frankfort, KS - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Truck Traffic in Frankfort, KS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 26.9%Very good
  • 11.5%Good
  • 15.4%Satisfactory
  • 30.8%Fair
  • 15.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.8%Very good
  • 23.1%Good
  • 3.8%Satisfactory
  • 23.1%Fair
  • 3.8%Poor
  • 15.4%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.8%Very good
  • 15.4%Good
  • 11.5%Satisfactory
  • 15.4%Fair
  • 23.1%Poor
  • 3.8%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Very good
  • 14.7%Good
  • 35.3%Satisfactory
  • 35.3%Fair
  • 8.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 37.5%Good
  • 50.0%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 58023,  Location: 3.0E OF WINIFRED (Lat: 39.769364,  Lng: -96.427592),  Route carried "on" structure: County highway 434,  Year Built: 1932,  Status: Posted for load,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 242 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 250 (year 2041),  Features Intersected: SNIPE CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $95,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $110,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5803,  Location: 0.5S 1.0E OF FRANKFORT (Lat: 39.694303,  Lng: -96.400678),  Route carried "on" structure: County highway 441,  Year Built: 1936,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 123 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 123 (year 2041),  Features Intersected: TRIB. BLK. VERMILLION RV
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 58031,  Location: 2.5S 2.5W OF VLIETS (Lat: 39.683167,  Lng: -96.378981),  Route carried "on" structure: County highway 441,  Year Built: 1980,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 123 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 123 (year 2041),  Design Load: H 20,  Features Intersected: IRISH CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 58032,  Location: 2.5S 2.5W OF VLIETS (Lat: 39.682203,  Lng: -96.374556),  Route carried "on" structure: County highway 441,  Year Built: 1932,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 123 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 123 (year 2041),  Features Intersected: TRIB. BLK. VERMILLION RV
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 58066,  Location: 0.5N 2.0W OF FRANKFORT (Lat: 39.711181,  Lng: -96.457272),  Route carried "on" structure: County highway 1235,  Year Built: 1986,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 190 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 190 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB. TO ROBIDOUX CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 58067,  Location: 0.5N 1.5W OF FRANKFORT (Lat: 39.711600,  Lng: -96.442175),  Route carried "on" structure: County highway 1235,  Year Built: 1931,  Status: Posted for load,  Structure Length: 5.68m (18.64ft),  Average Daily Traffic: 218 (year 2007),  Average Future Daily Traffic: 218 (year 2040),  Features Intersected: ROBIDOUX CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $525,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 580913003347,  Location: 1.7S 1.0E OF WINIFRED (Lat: 39.744750,  Lng: -96.463628),  Route carried "on" structure: County highway ,  Year Built: 1945,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 10 (year 2007),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: DOG WALK CREEK,  Facility Carried by Structure: 19TH RD (18.0-R.7)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.6m (11.8ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Poor,  Operating Rating: 20.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $240,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 580913503344,  Location: 1.5S 1.5E OF WINIFRED (Lat: 39.750097,  Lng: -96.454294),  Route carried "on" structure: County highway 5815,  Year Built: 1991,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 80 (year 2007),  Average Future Daily Traffic: 80 (year 2041),  Features Intersected: ROBIDOUX CREEK,  Facility Carried by Structure: 19TH RD (18.5-R.4)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 580913503401,  Location: 0.5N 2.0W OF FRANKFORT (Lat: 39.709814,  Lng: -96.454758),  Route carried "on" structure: County highway ,  Year Built: 1945,  Year Reconstructed: 2006,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5 (year 2007),  Average Future Daily Traffic: 5 (year 2041),  Features Intersected: TRIB. TO ROBIDOUX CREEK,  Facility Carried by Structure: 19TH TER(18.5-U.1)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 2.4m (7.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 19.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $275,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 580913603408,  Location: 2.0W OF FRANKFORT (Lat: 39.700022,  Lng: -96.452783),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 30 (year 2007),  Average Future Daily Traffic: 30 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB. TO ROBIDOUX CREEK,  Facility Carried by Structure: UTAH RD (18.6-U.8)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Other Special Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 580913903446,  Location: 2.0S 1.5W OF FRANKFORT (Lat: 39.672967,  Lng: -96.447700),  Route carried "on" structure: County highway 5819,  Year Built: 2003,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 50 (year 2007),  Average Future Daily Traffic: 50 (year 2041),  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: 20TH RD (18.9-W.6)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 34.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 580915103405,  Location: 1.5W OF FRANKFORT (Lat: 39.702958,  Lng: -96.440081),  Route carried "on" structure: County highway ,  Year Built: 2009,  Status: Open,  Structure Length: 3.73m (12.24ft),  Average Daily Traffic: 80 (year 2007),  Average Future Daily Traffic: 85 (year 2041),  Design Load: HL 93,  Features Intersected: ROBIDOUX CREEK,  Facility Carried by Structure: UTAH RD (19.1-U.5)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 58091520338,  Location: 1.0N 1.3W OF FRANKFORT (Lat: 39.725872,  Lng: -96.440892),  Route carried "on" structure: County highway ,  Year Built: 1910,  Status: Posted for load,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 10 (year 2007),  Average Future Daily Traffic: 20 (year 2041),  Features Intersected: ROBIDOUX CREEK,  Facility Carried by Structure: SUNFLOWER(19.2-T.0
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Fair,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $370,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 58091520344,  Location: 1.5S 1.5W OF FRANKFORT (Lat: 39.682044,  Lng: -96.442336),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 40 (year 2007),  Average Future Daily Traffic: 10 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK VERMILLION RIVER,  Facility Carried by Structure: VALLEY (19.2-W.0)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 27.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: May 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $575,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $680,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 58091790334,  Location: 2.0N 4.0W OF VLIETS (Lat: 39.754850,  Lng: -96.410094),  Route carried "on" structure: County highway ,  Year Built: 1945,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 10 (year 2007),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: LITTLE TIMBER CREEK,  Facility Carried by Structure: QUAIL RD(20.9-R.0)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.2m (13.8ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 13.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $280,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 58091790336,  Location: 2.0S 3.9E OF WINIFRED (Lat: 39.740361,  Lng: -96.409636),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 10 (year 2007),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: LITTLE TIMBER CREEK,  Facility Carried by Structure: RIDGE RD(20.9-S.0)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 580919003325,  Location: 0.5S 4.0E OF WINIFRED (Lat: 39.762264,  Lng: -96.408275),  Route carried "on" structure: County highway ,  Year Built: 1910,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 5 (year 2007),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: LITTLE TIMBER CREEK,  Facility Carried by Structure: PAWNEE (21.0-Q.5)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.9m (12.8ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Poor,  Operating Rating: 4.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $305,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5809191034,  Location: N.E. OF FRANKFORT (Lat: 39.711356,  Lng: -96.405442),  Route carried "on" structure: County highway 5810,  Year Built: 1978,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 80 (year 2007),  Average Future Daily Traffic: 80 (year 2041),  Design Load: H 20,  Features Intersected: LITTLE TIMBER CREEK,  Facility Carried by Structure: MINOR 21.1-U.0
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 50.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 580921003409,  Location: 1.5E OF FRANKFORT (Lat: 39.698000,  Lng: -96.389000),  Route carried "on" structure: County highway ,  Year Built: 1908,  Status: Posted for load,  Structure Length: 5.90m (19.36ft),  Average Daily Traffic: 10 (year 2007),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: BLACK VERMILLION RIVER,  Facility Carried by Structure: 23RD RD (22.0-U.9)
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.2m (13.8ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Fair,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $442,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $550,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 580921003482,  Location: 2.8N 5.0W OF LILLIS (Lat: 39.650369,  Lng: -96.389056),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 10 (year 2007),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: 23RD RD (22.0-Y.2)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $110,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $215,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 580921303405,  Location: 2.0E OF FRANKFORT (Lat: 39.704081,  Lng: -96.382781),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 10 (year 2007),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: TRIB. TO VERMILLION CRK.,  Facility Carried by Structure: TEMPLE (22.3-U.5)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Other Special Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5809234034,  Location: 1.5W OF VLIETS (Lat: 39.711275,  Lng: -96.362508),  Route carried "on" structure: County highway 5810,  Year Built: 1930,  Status: Posted for load,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 80 (year 2007),  Average Future Daily Traffic: 80 (year 2040),  Features Intersected: ACKERMAN BRANCH CREEK,  Facility Carried by Structure: MINOR 23.4-U.0
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.7m (61.4ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 12.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $220,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $325,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 580923403461,  Location: 3.0 S 1.5 W OF VLIETS_ (Lat: 39.668069,  Lng: -96.364006),  Route carried "on" structure: County highway 1546,  Year Built: 2014,  Status: Open,  Structure Length: 4.34m (14.24ft),  Average Daily Traffic: 30 (year 2014),  Average Future Daily Traffic: 35 (year 2041),  Design Load: HL 93,  Features Intersected: IRISH CREEK,  Facility Carried by Structure: WILDCAT 23.4-X.0
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 580923503407,  Location: 0.5S 1.5W OF VLIETS (Lat: 39.701128,  Lng: -96.360842),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Posted for load,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 10 (year 2007),  Average Future Daily Traffic: 10 (year 2041),  Design Load: H 20,  Features Intersected: BLACK VERMILLION,  Facility Carried by Structure: 29TH TER(23.5-U.7)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $224,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $260,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5809251034,  Location: 1.5W OF VLIETS (Lat: 39.711394,  Lng: -96.349950),  Route carried "on" structure: County highway 5810,  Year Built: 1910,  Status: Open,  Structure Length: 5.34m (17.52ft),  Average Daily Traffic: 80 (year 2007),  Average Future Daily Traffic: 80 (year 2041),  Features Intersected: BLACK VERMILLION RIVER,  Facility Carried by Structure: MINOR 24.1-U.0
Minimum Vertical Clearance: 3.96m (12.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.2m (13.8ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.6m (110.2ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Poor,  Channel: Fair,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $480,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 999900900580241,  Location: 9.44 MI E EJCT US77 (Lat: 39.681944,  Lng: -96.466389),  Route carried "on" structure: State highway 9,  Year Built: 1931,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 815 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 994 (year 2041),  Design Load: H 15,  Features Intersected: BLACK VERMILLION RIV DRG
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 30.270,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 34.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.55m (8.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 999900900580251,  Location: 10.60 MI E EJCT US77 (Lat: 39.691389,  Lng: -96.444444),  Route carried "on" structure: State highway 9,  Year Built: 1962,  Status: Open,  Structure Length: 5.78m (18.96ft),  Average Daily Traffic: 815 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 994 (year 2041),  Design Load: HS 20,  Features Intersected: ROBIDOUX CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 32.465,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 18.95m (62.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999900900580571,  Location: 11.57 MI E EJCT US-77 HWY (Lat: 39.701389,  Lng: -96.431944),  Route carried "on" structure: State highway 9,  Year Built: 2004,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 815 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 994 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: BLACK VERMILLION RIV DRG
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 34.023,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 41.8m (137.1ft)

Condition: Channel: Good,  Culverts: Good,  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999900900580581,  Location: 0.74 MI E NJCT K99 (Lat: 39.725833,  Lng: -96.403611),  Route carried "on" structure: State highway 9,  Year Built: 2004,  Status: Open,  Structure Length: 4.07m (13.35ft),  Average Daily Traffic: 720 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 749 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: LITTLE TIMBER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 39.125,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.0m (52.5ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 13.37m (43.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999900900580591,  Location: 2.97 MI E NJCT K-99 (Lat: 39.725833,  Lng: -96.361667),  Route carried "on" structure: State highway 9,  Year Built: 2004,  Status: Open,  Structure Length: 4.58m (15.03ft),  Average Daily Traffic: 720 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 749 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: ACKERMAN CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 42.710,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 15.01m (49.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999909900580361,  Location: 6.40 MI N PT COLN, ENTR W (Lat: 39.655833,  Lng: -96.417500),  Route carried "on" structure: ServiceOther road 1,  Year Built: 1932,  Status: Open,  Structure Length: 0.68m (2.23ft),  Truck Traffic: 1%,  Design Load: H 15,  Features Intersected: CEDAR CREEK DRAINAGE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.019,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 999909900580371,  Location: 6.44 MI N PT COLN (Lat: 39.656389,  Lng: -96.417222),  Route carried "on" structure: State highway 99,  Year Built: 1932,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 1,445 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 1,597 (year 2041),  Design Load: H 15,  Features Intersected: CEDAR CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 10.366,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 28.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 999909900580381,  Location: 7.64 MI N PT COLN (Lat: 39.673889,  Lng: -96.417222),  Route carried "on" structure: State highway 99,  Year Built: 1927,  Year Reconstructed: 1954,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,445 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 1,597 (year 2041),  Design Load: H 15,  Features Intersected: CEDAR CREEK DRAINAGE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 12.297,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 999909900580481,  Location: 9.24 MI N PT. COLN (Lat: 39.696667,  Lng: -96.418611),  Route carried "on" structure: State highway 99,  Year Built: 1985,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 1,445 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 1,597 (year 2041),  Design Load: HS 20,  Features Intersected: BLACK VERMILLION RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 14.849,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 28.20m (92.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Frankfort, Kansas (KS) on our hugely popular Kansas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.