Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Forestburgh, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 66ft / 19.7mTotal length
  • $9,437,000Total costs
  • 4,951Total average daily traffic
  • 317Total average daily truck traffic
  • 6,148Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Forestburgh
  • No street view available for this location

New bridges in Forestburgh, NY - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 51960-1969
  • 11980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Very good
  • 10.0%Good
  • 30.0%Fair
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Very good
  • 30.0%Good
  • 10.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Very good
  • 10.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 10.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 41.7%Good
  • 16.7%Satisfactory
  • 41.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 102498,  Location: 7.0 MI S JCT RTS 42 & 17 (Lat: 41.585242,  Lng: -74.727094),  Route carried "on" structure: State highway 42,  Year Built: 1985,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,993 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,005 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.829,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 82.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $487,000,  Roadway Improvement Cost: $285,000,  Total Project Cost: $772,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 335548,  Location: .8 MI NW OF FORESTBURG (Lat: 41.556067,  Lng: -74.759925),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 954 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,336 (year 2037),  Features Intersected: BLACK BROOK,  Facility Carried by Structure: COUNTY ROAD 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.935,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $404,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $640,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335549,  Location: 2.7 MI NW OF FORESTBURG (Lat: 41.581114,  Lng: -74.757111),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 252 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 353 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: OUTLET LEES POND,  Facility Carried by Structure: SACKETT LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.202,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $171,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $272,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33555,  Location: 3 MI NW OF FORESTBURG (Lat: 41.584939,  Lng: -74.754869),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 252 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 353 (year 2039),  Features Intersected: RUDICK POND OUTLT,  Facility Carried by Structure: SACKETT LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $666,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335551,  Location: AT HARTWOOD (Lat: 41.535728,  Lng: -74.684147),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 409 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 573 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: BUSH KILL,  Facility Carried by Structure: HARTWOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.953,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $761,000,  Roadway Improvement Cost: $446,000,  Total Project Cost: $1,207,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335552,  Location: IN OAKLAND VALLEY (Lat: 41.504694,  Lng: -74.647831),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 577 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 808 (year 2036),  Features Intersected: NEVERSINK RIVER,  Facility Carried by Structure: CR 49
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.788,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.66m (18.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,073,000,  Roadway Improvement Cost: $628,000,  Total Project Cost: $1,701,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335582,  Location: 2.3 MI N OF HARTWOOD (Lat: 41.569883,  Lng: -74.673722),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 289 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 405 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: BUSH KILL,  Facility Carried by Structure: BUSH KILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.039,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $328,000,  Total Project Cost: $888,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335656,  Location: IN OAKLAND VALLEY (Lat: 41.505553,  Lng: -74.649400),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 21 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 29 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BUSH KILL,  Facility Carried by Structure: BURNS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $455,000,  Roadway Improvement Cost: $266,000,  Total Project Cost: $721,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335657,  Location: 0.4 MI W OF FORESTBURG (Lat: 41.546753,  Lng: -74.759439),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 52 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 73 (year 2037),  Design Load: HL 93,  Features Intersected: BLACK BROOK,  Facility Carried by Structure: MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 98.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $370,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $586,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335659,  Location: 1.1 MI SW OF FORESTBURG (Lat: 41.536706,  Lng: -74.760619),  Route carried "on" structure: Other road ,  Year Built: 1934,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 57 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 80 (year 2038),  Features Intersected: BLACK BROOK,  Facility Carried by Structure: PLANK ROAD-SECT A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.133,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $388,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33566,  Location: 0.5 MI W OF FORESTBURG (Lat: 41.544558,  Lng: -74.760017),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 57 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 80 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BLACK BROOK,  Facility Carried by Structure: PLANK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.195,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $427,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $678,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335661,  Location: .5 MI NW OF OAKLND VALLEY (Lat: 41.509286,  Lng: -74.655164),  Route carried "on" structure: Other road ,  Year Built: 1969,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 38 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 53 (year 2038),  Design Load: HS 20,  Features Intersected: BUSH KILL,  Facility Carried by Structure: GALLIGAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $579,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $918,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Discuss Forestburgh, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.