Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Evanston, Wyoming (WY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 358ft / 109mTotal length
  • $6,591,000Total costs
  • 149,709Total average daily traffic
  • 38,923Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Evanston
  • No street view available for this location

New bridges in Evanston, WY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 121960-1969
  • 91980-1989
  • 11990-1999
Average Bridge Daily Traffic in Evanston, WY
Average Bridge Truck Traffic in Evanston, WY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Good
  • 37.5%Satisfactory
  • 37.5%Fair
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Very good
  • 18.8%Good
  • 56.3%Satisfactory
  • 12.5%Fair
  • 6.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Good
  • 56.3%Satisfactory
  • 37.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Good
  • 25.0%Satisfactory
  • 25.0%Poor
Find on map >>   Show street view

Structure Number: AMF,  Location: Utah Line - Evanston (Lat: 41.260508,  Lng: -110.986108),  Route carried "on" structure: Interstate 80,  Year Built: 1967,  Status: Open,  Structure Length: 5.84m (19.16ft),  Average Daily Traffic: 8,674 (year 2021),  Truck Traffic: 42%,  Average Future Daily Traffic: 12,144 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Harrison Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.515,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.38m (27.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $822,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,232,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: AMG,  Location: Evanston (Lat: 41.261089,  Lng: -110.985933),  Route carried "on" structure: Interstate 80,  Year Built: 1967,  Status: Open,  Structure Length: 5.84m (19.16ft),  Average Daily Traffic: 7,827 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,958 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Harrison Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.538,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: AMH,  Location: Evanston (Lat: 41.258133,  Lng: -110.967486),  Route carried "on" structure: Interstate 80,  Year Built: 1967,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 7,640 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,696 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Yellow Creek Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.239,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $95,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $115,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: AMI,  Location: Evanston (Lat: 41.258286,  Lng: -110.967489),  Route carried "on" structure: Interstate 80,  Year Built: 1967,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 7,827 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,958 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Yellow Creek Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.248,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: AML,  Location: Evanston (Lat: 41.267353,  Lng: -110.945917),  Route carried "on" structure: Interstate 80,  Year Built: 1967,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 12.62m (41.40ft),  Average Daily Traffic: 7,640 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,696 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: UPRR / Bear River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.450,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.62m (41.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $483,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: AMM,  Location: Evanston (Lat: 41.267478,  Lng: -110.946128),  Route carried "on" structure: Interstate 80,  Year Built: 1967,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 12.62m (41.40ft),  Average Daily Traffic: 8,650 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 12,110 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: UPRR / Bear River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.442,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.56m (44.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,216,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $3,324,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: AMN,  Location: Evanston (Lat: 41.267878,  Lng: -110.938928),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 7,640 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,696 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Bear River Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.037,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: AMO,  Location: Evanston (Lat: 41.268047,  Lng: -110.939103),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 7,827 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,958 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Bear River Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.034,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $56,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: BJV,  Location: Evanston (Lat: 41.270353,  Lng: -110.960839),  Route carried "on" structure: Business US 80,  Year Built: 1941,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 3,052 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,273 (year 2041),  Design Load: H 15,  Features Intersected: Bear River,  Facility Carried by Structure: Bear River Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.221,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.22m (20.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $899,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,348,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: FEM,  Location: Evanston (Lat: 41.266744,  Lng: -110.959617),  Route carried "on" structure: Business US 80,  Year Built: 1984,  Status: Open,  Structure Length: 20.39m (66.90ft),  Average Daily Traffic: 13,177 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,448 (year 2041),  Design Load: HS 20,  Features Intersected: UPRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.420,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 53.3m (174.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.8m (61.7ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $15,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: FEN,  Location: Evanston (Lat: 41.270164,  Lng: -110.957722),  Route carried "on" structure: Business US 80,  Year Built: 1984,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 13,177 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,448 (year 2041),  Design Load: HS 20,  Features Intersected: Bear River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.837,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: FFJ,  Location: I-80-Business (Lat: 41.266561,  Lng: -110.937314),  Route carried "on" structure: US 51,  Year Built: 1987,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 698 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 977 (year 2041),  Design Load: HS 20,  Features Intersected: Duncomb Hollow,  Facility Carried by Structure: I-80 Bus.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.895,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020
Find on map >>   Show street view

Structure Number: FGR,  Location: Evanston (Lat: 41.261864,  Lng: -110.954628),  Route carried "on" structure: Interstate 80,  Year Built: 1986,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 7,640 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,696 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: WYO 150
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.439,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 83.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: FGS,  Location: Evanston (Lat: 41.261872,  Lng: -110.954858),  Route carried "on" structure: Interstate 80,  Year Built: 1986,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 7,827 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,958 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: WYO 150
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.420,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 83.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: FJI,  Location: Evanston (Lat: 41.269939,  Lng: -110.963239),  Route carried "on" structure: City street 4860,  Year Built: 1988,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 3,617 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,064 (year 2041),  Design Load: HS 20,  Features Intersected: Bear River,  Facility Carried by Structure: Ui Cnty Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.124,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $7,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: FKM,  Location: 5 Mo N Of Evanston (Lat: 41.314597,  Lng: -111.010961),  Route carried "on" structure: County highway 105,  Year Built: 1987,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 314 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 440 (year 2041),  Design Load: HS 20,  Features Intersected: Bear River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.497,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $5,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: KVK,  Location: Evanston Streets (Lat: 41.273842,  Lng: -110.966531),  Route carried "on" structure: City street 4862,  Year Built: 1997,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 1,432 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,005 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: Bear River,  Facility Carried by Structure: Holland Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.243,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: AMF,  Location: Utah Line - Evanston (Lat: 41.260508,  Lng: -110.986108),  Route carried "under" structure: Business US 51,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 7,167 (year 2021),  Truck Traffic: 10%,  Features Intersected: Harrison Drive,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 5.509,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: AMG,  Location: Evanston (Lat: 41.261089,  Lng: -110.985933),  Route carried "under" structure: Business US 51,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 7,167 (year 2021),  Truck Traffic: 10%,  Features Intersected: Harrison Drive,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 5.576,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: AMN,  Location: Evanston (Lat: 41.267878,  Lng: -110.938928),  Route carried "under" structure: Business US 51,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 2,025 (year 2021),  Truck Traffic: 2%,  Features Intersected: Bear River Drive,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 5.22m (17.13ft),  Kilometerpoint: 10.697,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: AMO,  Location: Evanston (Lat: 41.268047,  Lng: -110.939103),  Route carried "under" structure: Business US 51,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 2,025 (year 2021),  Truck Traffic: 2%,  Features Intersected: Bear River Drive,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 10.673,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: BJU,  Location: Evanston (Lat: 41.268375,  Lng: -110.963281),  Route carried "under" structure: Business City street ,  Year Built: 1937,  Structure Length: 0. m,  Average Daily Traffic: 3,154 (year 2021),  Truck Traffic: 6%,  Features Intersected: Bear River Drive,  Facility Carried by Structure: UPRR
Minimum Vertical Clearance: 3.97m (13.02ft),  Kilometerpoint: 160.922,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: FGR,  Location: Evanston (Lat: 41.261864,  Lng: -110.954628),  Route carried "under" structure: State highway 150,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 6,756 (year 2021),  Truck Traffic: 2%,  Features Intersected: WYO 150,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 1.040,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: FGS,  Location: Evanston (Lat: 41.261872,  Lng: -110.954858),  Route carried "under" structure: State highway 150,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 6,756 (year 2021),  Truck Traffic: 2%,  Features Intersected: WYO 150,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 1.020,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Discuss Evanston, Wyoming (WY) on our hugely popular Wyoming forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.