Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Epes, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 36Number of bridges
  • 1,424ft / 434mTotal length
  • $130,033,000Total costs
  • 269,239Total average daily traffic
  • 105,301Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Epes
  • No street view available for this location

New bridges in Epes, AL - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 71950-1959
  • 11960-1969
  • 191970-1979
  • 21980-1989
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in Epes, AL
Average Bridge Truck Traffic in Epes, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 46.2%Good
  • 50.0%Satisfactory
  • 3.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Very good
  • 69.2%Good
  • 15.4%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.5%Very good
  • 69.2%Good
  • 19.2%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 37.0%Good
  • 40.7%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Good
  • 83.3%Satisfactory
Find on map >>   Show street view

Structure Number: 737,  Location: 0.4 MI. S. OF EPES (Lat: 32.686789,  Lng: -88.134717),  Route carried "on" structure: US 11,  Year Built: 1930,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 1,340 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,791 (year 2041),  Design Load: H 15,  Features Intersected: WIGGINS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.244,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $248,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4091,  Location: 1.4 W AL HWY 39 (Lat: 32.705000,  Lng: -88.190000),  Route carried "on" structure: County highway 1087,  Year Built: 1951,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 256 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 724 (year 2036),  Design Load: H 15,  Features Intersected: CO RT 1087 STREAM,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $303,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4092,  Location: 5.5 MI E SUMTERVILLE (Lat: 32.702261,  Lng: -88.147497),  Route carried "on" structure: County highway 1087,  Year Built: 1951,  Status: Posted for load,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 210 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: H 15,  Features Intersected: CO RT 1087 JONES CREEK,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 30.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $714,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $785,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5139,  Location: 1.1 MI. S. OF EPES (Lat: 32.681517,  Lng: -88.143558),  Route carried "on" structure: US 11,  Year Built: 1955,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 1,340 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,791 (year 2041),  Design Load: H 20,  Features Intersected: JONES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.218,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 87.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $549,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $604,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5334,  Location: 1.9 MI N EPES (Lat: 32.720081,  Lng: -88.126881),  Route carried "on" structure: County highway 1223,  Year Built: 1955,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 340 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 480 (year 2039),  Design Load: H 15,  Features Intersected: CO RT 1223 JONES CREEK,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $994,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,093,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5335,  Location: 3.4 MI N EPES (Lat: 32.736467,  Lng: -88.132489),  Route carried "on" structure: County highway 1186,  Year Built: 1955,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 340 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 480 (year 2038),  Design Load: H 15,  Features Intersected: CO RT 1186 CREEK,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $679,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $747,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5336,  Location: 3.5 MI N EPES (Lat: 32.737733,  Lng: -88.132508),  Route carried "on" structure: County highway 1186,  Year Built: 1955,  Status: Posted for load,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 504 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 749 (year 2038),  Design Load: H 15,  Features Intersected: CO RT 1186 FACTORY CREEK,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.11m (23.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $1,218,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,340,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 639,  Location: 4.9 MI NE SUMTERVILLE (Lat: 32.738836,  Lng: -88.169786),  Route carried "on" structure: County highway 1141,  Year Built: 1958,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 100 (year 2021),  Average Future Daily Traffic: 145 (year 2039),  Design Load: H 15,  Features Intersected: CO RT 1141 BRANCH,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 7475,  Location: .2MI E OF AL 75 (Lat: 34.539647,  Lng: -85.811517),  Route carried "on" structure: County highway 108,  Year Built: 1961,  Status: Open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 866 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,287 (year 2041),  Design Load: H 15,  Features Intersected: CANEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.56m (5.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $485,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $534,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9839,  Location: 2.5 MI N SUMTER CO LINE (Lat: 32.711750,  Lng: -88.079550),  Route carried "on" structure: US 11,  Year Built: 1939,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 23.09m (75.75ft),  Average Daily Traffic: 700 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 917 (year 2033),  Design Load: H 10,  Features Intersected: TOMBIGBEE RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.349,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 42,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 59.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.09m (75.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,591,000,  Roadway Improvement Cost: $459,000,  Total Project Cost: $5,050,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10467,  Location: 5.2 MI S OF BOLIGEE (Lat: 32.740472,  Lng: -88.095358),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 11.09m (36.38ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2041),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.122,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.98m (39.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,533,000,  Roadway Improvement Cost: $353,000,  Total Project Cost: $3,886,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10468,  Location: 5.2 MI S OF BOLIGEE (Lat: 32.740300,  Lng: -88.096500),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 11.09m (36.38ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2041),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.122,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.98m (39.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,533,000,  Roadway Improvement Cost: $353,000,  Total Project Cost: $3,886,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10469,  Location: 4.8 MI S OF BOLIGEE (Lat: 32.744217,  Lng: -88.090800),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2041),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.708,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.73m (31.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,868,000,  Roadway Improvement Cost: $287,000,  Total Project Cost: $3,155,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1047,  Location: 4.8 MI S OF BOLIGEE (Lat: 32.743983,  Lng: -88.090533),  Route carried "on" structure: Interstate 59,  Year Built: 1971,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 13,652 (year 2041),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.708,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.73m (31.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,868,000,  Roadway Improvement Cost: $287,000,  Total Project Cost: $3,155,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10832,  Location: 1.5 MI N SUMTER CO LINE (Lat: 32.700600,  Lng: -88.091200),  Route carried "on" structure: US 11,  Year Built: 1930,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 33.83m (110.99ft),  Average Daily Traffic: 700 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 917 (year 2033),  Design Load: H 10,  Features Intersected: TOMBIGBEE RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.691,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 65,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 33.83m (110.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $6,728,000,  Roadway Improvement Cost: $673,000,  Total Project Cost: $7,401,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11116,  Location: 2 MI.N.OF SR 28 (Lat: 32.671289,  Lng: -88.172042),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 11.66m (38.25ft),  Average Daily Traffic: 100 (year 2000),  Average Future Daily Traffic: 150 (year 2028),  Design Load: HS 20,  Features Intersected: I-59,  Facility Carried by Structure: MCCAINVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.52m (41.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,490,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $2,739,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11117,  Location: .3 MI. S. OF CO. RT. 20 (Lat: 32.697569,  Lng: -88.146244),  Route carried "on" structure: Interstate 59,  Year Built: 1974,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 20,206 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 33,110 (year 2040),  Design Load: HS 20,  Features Intersected: Wiggins Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.392,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,314,000,  Roadway Improvement Cost: $331,000,  Total Project Cost: $3,645,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11118,  Location: 3 MI. W. OF EPES (Lat: 32.701058,  Lng: -88.142461),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 11.06m (36.29ft),  Average Daily Traffic: 20,206 (year 2013),  Average Future Daily Traffic: 3,310 (year 2040),  Design Load: HS 20,  Features Intersected: I-59,  Facility Carried by Structure: CR 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.95m (39.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,687,000,  Roadway Improvement Cost: $369,000,  Total Project Cost: $4,056,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11119,  Location: 1.3 MI.N. OF CO.RD 20 (Lat: 32.714628,  Lng: -88.127175),  Route carried "on" structure: County highway 21,  Year Built: 1974,  Status: Open,  Structure Length: 11.52m (37.80ft),  Average Daily Traffic: 100 (year 2000),  Average Future Daily Traffic: 150 (year 2028),  Design Load: HS 20,  Features Intersected: I-59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.39m (40.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,464,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $2,710,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1112,  Location: 2 MI. S. OF TOMBIGBEE (Lat: 32.717314,  Lng: -88.124208),  Route carried "on" structure: Interstate 59,  Year Built: 1974,  Status: Open,  Structure Length: 11.34m (37.20ft),  Average Daily Traffic: 9,125 (year 2013),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,491 (year 2033),  Design Load: HS 20,  Features Intersected: JONES CREEK (-)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.377,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.22m (40.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,350,000,  Roadway Improvement Cost: $335,000,  Total Project Cost: $3,685,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11121,  Location: 2 MI. S. OF TOMBIGBEE (Lat: 32.717025,  Lng: -88.124089),  Route carried "on" structure: Interstate 59,  Year Built: 1974,  Status: Open,  Structure Length: 11.34m (37.20ft),  Average Daily Traffic: 18,594 (year 2020),  Truck Traffic: 44%,  Average Future Daily Traffic: 30,468 (year 2040),  Design Load: HS 20,  Features Intersected: JONES CREEK (+)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.377,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.22m (40.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,350,000,  Roadway Improvement Cost: $335,000,  Total Project Cost: $3,685,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11122,  Location: 1.3 MI. S. OF TOMBIGBEE (Lat: 32.730906,  Lng: -88.107261),  Route carried "on" structure: Interstate 59,  Year Built: 1974,  Status: Open,  Structure Length: 15.13m (49.64ft),  Average Daily Traffic: 9,125 (year 2013),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,491 (year 2033),  Design Load: HS 20,  Features Intersected: FACTORY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.567,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.90m (52.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,362,000,  Roadway Improvement Cost: $436,000,  Total Project Cost: $4,798,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11123,  Location: 1.3MI.S.OF TOMBIGBEE RV. (Lat: 32.730844,  Lng: -88.106925),  Route carried "on" structure: Interstate 59,  Year Built: 1974,  Status: Open,  Structure Length: 13.26m (43.50ft),  Average Daily Traffic: 9,125 (year 2013),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,491 (year 2033),  Design Load: HS 20,  Features Intersected: FACTORY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.567,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.07m (46.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,860,000,  Roadway Improvement Cost: $386,000,  Total Project Cost: $4,246,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11237,  Location: 1 MI. N. at I-59 (Lat: 32.680039,  Lng: -88.163786),  Route carried "on" structure: State highway 39,  Year Built: 1974,  Status: Open,  Structure Length: 13.05m (42.81ft),  Average Daily Traffic: 770 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 940 (year 2033),  Design Load: HS 20,  Features Intersected: I 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.785,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.87m (45.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $3,329,000,  Roadway Improvement Cost: $333,000,  Total Project Cost: $3,662,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11573,  Location: SUMTER * GREENE CO LINE (Lat: 32.735369,  Lng: -88.101711),  Route carried "on" structure: Interstate 59,  Year Built: 1976,  Status: Open,  Structure Length: 62.94m (206.50ft),  Average Daily Traffic: 9,125 (year 2013),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,491 (year 2033),  Design Load: HS 20,  Features Intersected: TOMBIGBEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.290,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Navigation Control: Yes ( Vertical Clearance: 12.2m (40.0ft), Horizontal Clearance: 112.2m (368.1ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 12,  Length of Maximum Span: 114.3m (375.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 38.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 62.94m (206.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $17,263,000,  Roadway Improvement Cost: $1,726,000,  Total Project Cost: $18,989,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11574,  Location: SUMTER * GREEN CO LINE (Lat: 32.735194,  Lng: -88.101475),  Route carried "on" structure: Interstate 59,  Year Built: 1976,  Status: Open,  Structure Length: 62.94m (206.50ft),  Average Daily Traffic: 9,125 (year 2013),  Truck Traffic: 44%,  Average Future Daily Traffic: 10,491 (year 2033),  Design Load: HS 20,  Features Intersected: TOMBIGBEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.290,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Navigation Control: Yes ( Vertical Clearance: 12.2m (40.0ft), Horizontal Clearance: 112.2m (368.1ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 12,  Length of Maximum Span: 114.3m (375.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 62.94m (206.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $16,832,000,  Roadway Improvement Cost: $1,683,000,  Total Project Cost: $18,515,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12455,  Location: SUMTER * GREENE CO LINE (Lat: 32.693906,  Lng: -88.115564),  Route carried "on" structure: US 11,  Year Built: 1981,  Status: Open,  Structure Length: 69.07m (226.61ft),  Average Daily Traffic: 1,340 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,791 (year 2033),  Design Load: HS 20,  Features Intersected: TOMBIGBEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.262,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 14,  Length of Maximum Span: 114.3m (375.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 69.07m (226.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $16,577,000,  Roadway Improvement Cost: $1,658,000,  Total Project Cost: $18,235,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12544,  Location: 1.1 MI N SUMTER CO LINE (Lat: 32.698800,  Lng: -88.096500),  Route carried "on" structure: US 11,  Year Built: 1981,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 700 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 917 (year 2033),  Design Load: HS 20,  Features Intersected: TOMBIGBEE RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.126,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,556,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $2,812,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15548,  Location: 1.9 MI. N. JCT. S.R.11 (Lat: 32.690744,  Lng: -88.167008),  Route carried "on" structure: State highway 39,  Year Built: 1992,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 830 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,013 (year 2041),  Design Load: HS 20,  Features Intersected: JONES CRK.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.008,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.65m (15.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,370,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,507,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15549,  Location: 4.7 MI. S. OF GAINESVILLE (Lat: 32.744208,  Lng: -88.167356),  Route carried "on" structure: State highway 39,  Year Built: 1992,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 830 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,013 (year 2041),  Design Load: HS 20,  Features Intersected: FACTORY CRK. REL.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.938,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $472,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1555,  Location: 4.5 MI.S.OF GAINSVILLE (Lat: 32.744489,  Lng: -88.167342),  Route carried "on" structure: State highway 39,  Year Built: 1992,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 830 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,013 (year 2041),  Design Load: HS 20,  Features Intersected: FACTORY CRK.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.964,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.39m (20.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,884,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $2,072,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18431,  Location: R.R EPES (Lat: 32.689056,  Lng: -88.128117),  Route carried "on" structure: US 11,  Year Built: 2001,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 1,340 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,791 (year 2033),  Design Load: HS 20,  Features Intersected: NORFOLK & SO RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.919,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 73.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,483,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $1,631,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11116,  Location: 2 MI.N.OF SR 28 (Lat: 32.671289,  Lng: -88.172042),  Route carried "under" structure: Interstate 20,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 19,990 (year 2013),  Truck Traffic: 44%,  Features Intersected: I-59,  Facility Carried by Structure: MCCAINVILLE RD
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 33.576,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 11118,  Location: 3 MI. W. OF EPES (Lat: 32.701058,  Lng: -88.142461),  Route carried "under" structure: Interstate 20,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 20,206 (year 2020),  Truck Traffic: 44%,  Features Intersected: I-59
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 37.878,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 11119,  Location: 1.3 MI.N. OF CO.RD 20 (Lat: 32.714628,  Lng: -88.127175),  Route carried "under" structure: Interstate 20,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 18,250 (year 2013),  Truck Traffic: 44%,  Features Intersected: I-59,  Facility Carried by Structure: CR-21
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 39.978,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 11237,  Location: 1 MI. N. at I-59 (Lat: 32.680039,  Lng: -88.163786),  Route carried "under" structure: Interstate 20,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 18,250 (year 2013),  Truck Traffic: 44%,  Features Intersected: I 59,  Facility Carried by Structure: S.R. 39
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 34.841,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Discuss Epes, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.