Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Elliott, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 40Number of bridges
  • 453ft / 138mTotal length
  • $3,830,635,000Total costs
  • 99,115Total average daily traffic
  • 16,438Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Elliott
  • No street view available for this location

New bridges in Elliott, MS - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 151960-1969
  • 51970-1979
  • 151990-1999
  • 22000-2009
Average Bridge Daily Traffic in Elliott, MS
Average Bridge Truck Traffic in Elliott, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 36.0%Good
  • 40.0%Satisfactory
  • 4.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 52.0%Good
  • 20.0%Satisfactory
  • 8.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 32.0%Very good
  • 52.0%Good
  • 8.0%Fair
  • 8.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.5%Very good
  • 37.0%Good
  • 29.6%Satisfactory
  • 7.4%Fair
  • 7.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 71.4%Good
  • 28.6%Satisfactory
Find on map >>   Show street view

Structure Number: 11000550081943,  Location: 0.8 MI N MONTGOMERY CL (Lat: 33.629617,  Lng: -89.790600),  Route carried "on" structure: Interstate 55,  Year Built: 1963,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 17,000 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SYKES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.376,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 21000510222031,  Location: 1.5 MI N MONTGOMERY CL (Lat: 33.694850,  Lng: -89.759514),  Route carried "on" structure: US 51,  Year Built: 1934,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 5,300 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,500 (year 2040),  Design Load: H 15,  Features Intersected: BATUPAN BOGUE TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.337,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 40.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.79m (12.43ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $288,000,000,  Roadway Improvement Cost: $29,000,000,  Total Project Cost: $864,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21000510222037,  Location: 2.1 MI N MONTGOMERY CL (Lat: 33.702728,  Lng: -89.764461),  Route carried "on" structure: US 51,  Year Built: 1934,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 5,300 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,500 (year 2040),  Design Load: H 15,  Features Intersected: BATUPAN BOGUE TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.323,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 40.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $130,000,000,  Roadway Improvement Cost: $13,000,000,  Total Project Cost: $405,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21000510222044,  Location: 2.8 MI N MONTGOMERY CL (Lat: 33.711975,  Lng: -89.770478),  Route carried "on" structure: US 51,  Year Built: 1934,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 5,300 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,500 (year 2040),  Design Load: H 15,  Features Intersected: BATUPAN BOGUE TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.492,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 40.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.79m (12.43ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $288,000,000,  Roadway Improvement Cost: $29,000,000,  Total Project Cost: $864,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21000510492008,  Location: 0.8 MI S GRENADA CL (Lat: 33.667442,  Lng: -89.738653),  Route carried "on" structure: US 51,  Year Built: 2005,  Status: Open,  Structure Length: 7.67m (25.16ft),  Average Daily Traffic: 3,500 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,500 (year 2040),  Design Load: HS 20,  Features Intersected: SYKES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.967,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31004040080001,  Location: SR 404 OVER I 55 (Lat: 33.635272,  Lng: -89.794292),  Route carried "on" structure: State highway 404,  Year Built: 1963,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 420 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 420 (year 2040),  Design Load: HS 20,  Features Intersected: I 55
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.132,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31004040490007,  Location: 0.5 MI E I 55 (Lat: 33.634475,  Lng: -89.783706),  Route carried "on" structure: State highway 404,  Year Built: 1968,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 420 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 420 (year 2040),  Design Load: HS 20,  Features Intersected: SYKES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.264,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 41000550081966A,  Location: 1.2 MI S GRENADA CL (Lat: 33.658517,  Lng: -89.808206),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 200 (year 2040),  Design Load: H 15,  Features Intersected: I 55,  Facility Carried by Structure: COUNTY ROAD 213
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.823,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $200,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $615,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 41000550081966B,  Location: 1.2 MI S GRENADA CL (Lat: 33.660464,  Lng: -89.805917),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 200 (year 2040),  Design Load: H 15,  Features Intersected: I 55,  Facility Carried by Structure: COUNTY ROAD 213
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.132,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $200,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $464,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 41000550081978,  Location: 0.2 MI S GRENADA CL (Lat: 33.675567,  Lng: -89.812114),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 90 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 90 (year 2040),  Design Load: HS 15,  Features Intersected: I 55,  Facility Carried by Structure: BOLTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.892,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.81m (32.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $330,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $615,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 41000550221984,  Location: 3.7 MI N SR 404 (Lat: 33.683581,  Lng: -89.813936),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 10.88m (35.70ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,500 (year 2040),  Design Load: HS 20,  Features Intersected: I 55,  Facility Carried by Structure: CAMP McCAIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.003,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 62.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA0800000000171,  Location: SEC 32 T21N R 5E (Lat: 33.640833,  Lng: -89.788778),  Route carried "on" structure: County highway 241,  Year Built: 1998,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 90 (year 2014),  Average Future Daily Traffic: 135 (year 2034),  Design Load: HS 20,  Features Intersected: JUMPING GULLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000004,  Location: SEC 10 T21N R 5E (Lat: 33.695972,  Lng: -89.758056),  Route carried "on" structure: County highway 99,  Year Built: 1993,  Status: Posted for load,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 300 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 450 (year 2035),  Design Load: HS 20,  Features Intersected: BCH OF BATUPAN BOGUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000005,  Location: SEC 14 T21N R 5E B (Lat: 33.691111,  Lng: -89.735472),  Route carried "on" structure: County highway 2703,  Year Built: 1969,  Status: Open,  Structure Length: 17.07m (56.00ft),  Average Daily Traffic: 460 (year 2010),  Truck Traffic: 8%,  Average Future Daily Traffic: 690 (year 2031),  Design Load: HS 20,  Features Intersected: BOGUE CREEK,  Facility Carried by Structure: E NAT G. TROUTT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 7,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000006,  Location: SEC 15 T21N R 5E (Lat: 33.684167,  Lng: -89.765556),  Route carried "on" structure: County highway 1,  Year Built: 1996,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 70 (year 2015),  Average Future Daily Traffic: 105 (year 2035),  Design Load: HS 20,  Features Intersected: BCH OF BATUPAN BOGUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000007,  Location: SEC 7 T21N R 6E (Lat: 33.698500,  Lng: -89.714222),  Route carried "on" structure: County highway 2703,  Year Built: 1979,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 430 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 645 (year 2035),  Design Load: H 15,  Features Intersected: CROWDER CREEK,  Facility Carried by Structure: WILLIS ROAD 105
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.345,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.78m (12.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $226,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $279,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000008,  Location: SEC 7 T21N R 6E B (Lat: 33.703056,  Lng: -89.709778),  Route carried "on" structure: County highway 2703,  Year Built: 1971,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 430 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 645 (year 2035),  Design Load: HS 20,  Features Intersected: CROWDER CREEK,  Facility Carried by Structure: JAMES H BIDDY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: SA2200000000009,  Location: SEC 7 T21N R 6E B (Lat: 33.691667,  Lng: -89.715278),  Route carried "on" structure: County highway 186,  Year Built: 1972,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 370 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 555 (year 2035),  Design Load: HS 20,  Features Intersected: CROWDER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: SA220000000001,  Location: SEC 16 T21N R 6E (Lat: 33.678083,  Lng: -89.680833),  Route carried "on" structure: County highway 101,  Year Built: 1962,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 100 (year 2015),  Average Future Daily Traffic: 150 (year 2035),  Design Load: H 15,  Features Intersected: TRIB OF EPISON CK,  Facility Carried by Structure: PROVIDENCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.78m (12.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $226,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $279,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000011,  Location: SEC 17 T21N R 6E B (Lat: 33.687556,  Lng: -89.689389),  Route carried "on" structure: County highway 97,  Year Built: 2005,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 70 (year 2015),  Average Future Daily Traffic: 105 (year 2035),  Design Load: HS 20,  Features Intersected: EPISON BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000012,  Location: SEC 18 T21N R 6E B (Lat: 33.685944,  Lng: -89.709056),  Route carried "on" structure: County highway 102,  Year Built: 1977,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 70 (year 2015),  Average Future Daily Traffic: 105 (year 2035),  Design Load: HS 15,  Features Intersected: EPISON BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000039,  Location: SEC_34_T22N_R 5E (Lat: 33.724167,  Lng: -89.754722),  Route carried "on" structure: County highway 103,  Year Built: 1974,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 50 (year 2015),  Average Future Daily Traffic: 75 (year 2035),  Design Load: H 15,  Features Intersected: UNNAMED STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.667,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $208,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA2200000000086,  Location: SEC 14 T21N R 5E (Lat: 33.689167,  Lng: -89.736667),  Route carried "on" structure: County highway 212,  Year Built: 1997,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 50 (year 2014),  Average Future Daily Traffic: 75 (year 2034),  Design Load: HS 20,  Features Intersected: UNNAMED STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.206,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000092,  Location: SEC 12 T21N R 5E (Lat: 33.698583,  Lng: -89.732611),  Route carried "on" structure: County highway 103,  Year Built: 1999,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 50 (year 2014),  Average Future Daily Traffic: 75 (year 2034),  Design Load: HS 20,  Features Intersected: BCH OF BATUPAN BOGUE,  Facility Carried by Structure: MCCORMICK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.750,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 89.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2200000000097,  Location: SEC 17 T21N R 5E B (Lat: 33.685556,  Lng: -89.798889),  Route carried "on" structure: County highway 186,  Year Built: 1998,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 430 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 645 (year 2034),  Design Load: HS 20,  Features Intersected: JACK CREEK,  Facility Carried by Structure: W NAT G. TROUTT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.522,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: SA2200000000098,  Location: SEC 15 T21N R 5E B (Lat: 33.690222,  Lng: -89.763278),  Route carried "on" structure: County highway 186,  Year Built: 1998,  Status: Open,  Structure Length: 1.29m (4.23ft),  Average Daily Traffic: 430 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 645 (year 2034),  Design Load: HS 20,  Features Intersected: BATUPAN BOGUE,  Facility Carried by Structure: W NAT G. TROUTT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.548,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: SA2200000000099,  Location: SEC_18_T21N_R 6E B (Lat: 33.691778,  Lng: -89.710000),  Route carried "on" structure: County highway 186,  Year Built: 1998,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 430 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 645 (year 2034),  Design Load: HS 20,  Features Intersected: RELIEF DITCH,  Facility Carried by Structure: JAMES H. BIDDY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.039,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 15.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: SA4900000000114,  Location: SEC 24 T21N R 5E (Lat: 33.669258,  Lng: -89.723983),  Route carried "on" structure: County highway 45,  Year Built: 1998,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 50 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 75 (year 2035),  Features Intersected: BIG BOGUE CREEK,  Facility Carried by Structure: RILEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,191,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,291,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4900000000115,  Location: SEC 27 T21N R 5E (Lat: 33.648333,  Lng: -89.765833),  Route carried "on" structure: County highway 204,  Year Built: 1996,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 25 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 60 (year 2035),  Features Intersected: JUMPING GULLEY CREEK,  Facility Carried by Structure: WILKINS CHAPEL RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $631,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $731,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA490000000012,  Location: SEC 19 T21N R 6E B (Lat: 33.673333,  Lng: -89.700083),  Route carried "on" structure: County highway 49,  Year Built: 1993,  Status: Posted for load,  Structure Length: 1.79m (5.87ft),  Average Daily Traffic: 40 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 60 (year 2033),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: RILEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 6.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 3.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $9,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $16,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: SA4900000000121,  Location: SEC 20 T21N R 6E B (Lat: 33.668583,  Lng: -89.684333),  Route carried "on" structure: County highway 58,  Year Built: 1962,  Status: Posted for load,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 120 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 180 (year 2042),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: PROVIDENCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.345,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Poor,  Operating Rating: 10.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.18m (13.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $580,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA4900000000122,  Location: SEC 20 T21N R 6E B (Lat: 33.674722,  Lng: -89.680833),  Route carried "on" structure: County highway 52,  Year Built: 1991,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 120 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 180 (year 2035),  Design Load: H 15,  Features Intersected: LITTLE BOGUE CREEK,  Facility Carried by Structure: PROVIDENCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.310,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 21.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.88m (19.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $202,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $251,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31004040080001,  Location: SR 404 OVER I 55 (Lat: 33.635311,  Lng: -89.794000),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 10%,  Features Intersected: I 55,  Facility Carried by Structure: SR 404
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 4.949,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 31004040080001,  Location: SR 404 OVER I 55 (Lat: 33.635361,  Lng: -89.793711),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 10%,  Features Intersected: I 55,  Facility Carried by Structure: SR 404
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 23.075,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 41000550081966A,  Location: 1.2 MI S GRENADA CL (Lat: 33.658669,  Lng: -89.808011),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 55,  Facility Carried by Structure: COUNTY ROAD 213
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 2.041,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 41000550081966B,  Location: 1.2 MI S GRENADA CL (Lat: 33.660631,  Lng: -89.805750),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 55,  Facility Carried by Structure: COUNTY ROAD 213
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 26.092,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 41000550081978,  Location: 0.2 MI S GRENADA CL (Lat: 33.675681,  Lng: -89.811769),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 55,  Facility Carried by Structure: BOLTON ROAD
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 0.114,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 41000550081978,  Location: 0.2 MI S GRENADA CL (Lat: 33.675831,  Lng: -89.811331),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 55,  Facility Carried by Structure: BOLTON ROAD
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 27.856,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 41000550221984,  Location: 3.7 MI N SR 404 (Lat: 33.683650,  Lng: -89.813481),  Route carried "under" structure: Interstate 55,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 55,  Facility Carried by Structure: CAMP McCAIN ROAD
Minimum Vertical Clearance: 5.91m (19.39ft),  Kilometerpoint: 24.510,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 41000550221984,  Location: 3.7 MI N SR 404 (Lat: 33.683689,  Lng: -89.813200),  Route carried "under" structure: Interstate 55,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 55,  Facility Carried by Structure: CAMP McCAIN ROAD
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 0.790,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Elliott, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.