Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ellenton, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 1,240ft / 378mTotal length
  • $177,000Total costs
  • 843,340Total average daily traffic
  • 97,821Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ellenton
  • No street view available for this location

New bridges in Ellenton, FL - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 271980-1989
Reconstructed bridges in Ellenton, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Ellenton, FL
Average Bridge Truck Traffic in Ellenton, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 57.1%Good
  • 28.6%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 64.3%Good
  • 35.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 85.7%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Excellent
  • 12.5%Very good
  • 62.5%Good
  • 12.5%Satisfactory
Find on map >>   Show street view

Structure Number: 130015,  Location: 1.8 MI E OF US-41/US-19 (Lat: 27.521778,  Lng: -82.532028),  Route carried "on" structure: US 301,  Year Built: 1945,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 33,500 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 58,122 (year 2042),  Design Load: H 10,  Features Intersected: MANAVISTA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.052,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.6m (54.5ft),  Skew: 29 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 130063,  Location: 2.0MI. S OF 97TH ST. EAST (Lat: 27.579822,  Lng: -82.513367),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Posted for load-capacity,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 3,771 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,543 (year 2040),  Design Load: HS 20,  Features Intersected: BUFFALO CANAL,  Facility Carried by Structure: BUFFALO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.760,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 130075,  Location: 2.0 MI NORTH OF US-301 (Lat: 27.556258,  Lng: -82.512039),  Route carried "on" structure: Interstate 75,  Year Built: 1981,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 42,750 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 74,171 (year 2042),  Design Load: HS 20,  Features Intersected: CSX R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.691,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 130076,  Location: 2.0 MI NORTH OF US-301 (Lat: 27.556553,  Lng: -82.511297),  Route carried "on" structure: Interstate 75,  Year Built: 1981,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 42,750 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 74,171 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.711,  Lanes on structure: 3,  Base Highway Network: Yes (Inventory Route: 130750,  Subroute: 40),  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 130089,  Location: 0.25 MI S OF I-275 (Lat: 27.574408,  Lng: -82.514581),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 10.49m (34.42ft),  Average Daily Traffic: 9,300 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,136 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: I-75,  Facility Carried by Structure: ERIE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.781,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 52.4m (171.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 13009,  Location: 3 MI NORTH OF US-301 (Lat: 27.583450,  Lng: -82.514656),  Route carried "on" structure: Interstate 275,  Year Built: 1981,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 21.59m (70.83ft),  Average Daily Traffic: 17,000 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 29,495 (year 2042),  Design Load: HL 93,  Features Intersected: I-75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.896,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 74.0m (242.8ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 130103,  Location: 3.5 MI NORTH OF SR-64 (Lat: 27.525294,  Lng: -82.506558),  Route carried "on" structure: Interstate 75,  Year Built: 1980,  Status: Open,  Structure Length: 116.58m (382.48ft),  Average Daily Traffic: 52,000 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 90,220 (year 2042),  Design Load: HS 20,  Features Intersected: US-301/MANATEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.599,  Lanes on structure: 3,  Lanes under structure: 11,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Navigation Control: Yes ( Vertical Clearance: 12.4m (40.7ft), Horizontal Clearance: 22.0m (72.2ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 41,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Excellent,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 130104,  Location: 3.5 MI NORTH OF SR-64 (Lat: 27.525408,  Lng: -82.506175),  Route carried "on" structure: Interstate 75,  Year Built: 1980,  Status: Open,  Structure Length: 116.58m (382.48ft),  Average Daily Traffic: 52,000 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 90,220 (year 2042),  Design Load: HS 20,  Features Intersected: US-301/ MANATEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.599,  Lanes on structure: 3,  Lanes under structure: 11,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Navigation Control: Yes ( Vertical Clearance: 12.2m (40.0ft), Horizontal Clearance: 23.2m (76.1ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 41,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 130107,  Location: 2.0 MI S OF I-275 (Lat: 27.546861,  Lng: -82.510894),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 7,000 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,145 (year 2042),  Design Load: HS 20,  Features Intersected: I-75 (SR-93),  Facility Carried by Structure: MENDOZA RD (37TH)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.674,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 130108,  Location: 800FT. SOUTH OF I-275 (Lat: 27.580025,  Lng: -82.514936),  Route carried "on" structure: Interstate 75,  Year Built: 1981,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 42,750 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 74,171 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BUFFALO CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.352,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.2m (82.7ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 25.2m (82.7ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 130109,  Location: 800FT. SOUTH OF I-275 (Lat: 27.579908,  Lng: -82.514456),  Route carried "on" structure: Interstate 75,  Year Built: 1981,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 42,750 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 74,171 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BUFFALO CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.342,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13011,  Location: 800FT. SOUTH OF I-275 (Lat: 27.579861,  Lng: -82.513917),  Route carried "on" structure: Ramp Interstate 275,  Year Built: 1981,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 17,000 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 29,495 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BUFFALO CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 130112,  Location: 0.6 MI EAST OF US-41 (Lat: 27.585383,  Lng: -82.515619),  Route carried "on" structure: Ramp Interstate 275,  Year Built: 1981,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 68.55m (224.90ft),  Average Daily Traffic: 9,100 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,788 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: I-75 AND I-275 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.587,  Lanes on structure: 1,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 13,  Length of Maximum Span: 76.5m (251.0ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 68.60m (225.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $97,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 130122,  Location: 1.0MI EAST OF US-41 (Lat: 27.585689,  Lng: -82.527336),  Route carried "on" structure: County highway 683,  Year Built: 1983,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 7,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,145 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: I-275/SR-93
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.010,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.0m (150.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $75,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $80,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 130131,  Location: 1.4MI S/O MOCCASIN WALLOW (Lat: 27.580769,  Lng: -82.527375),  Route carried "on" structure: County highway 683,  Year Built: 1984,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 11,587 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,103 (year 2040),  Design Load: HS 20,  Features Intersected: BUFFALO CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.500,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 130089,  Location: 0.25 MI S OF I-275 (Lat: 27.574408,  Lng: -82.514581),  Route carried "under" structure: Interstate 75,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 85,500 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-75,  Facility Carried by Structure: ERIE ROAD
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 22.735,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.4m (171.9ft)

Find on map >>   Show street view

Structure Number: 13009,  Location: 3 MI NORTH OF US-301 (Lat: 27.583450,  Lng: -82.514656),  Route carried "under" structure: Interstate 75,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 58,000 (year 2020),  Truck Traffic: 18%,  Features Intersected: I-75
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 23.749,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 74.0m (242.8ft)

Find on map >>   Show street view

Structure Number: 130103,  Location: 3.5 MI NORTH OF SR-64 (Lat: 27.525294,  Lng: -82.506558),  Route carried "under" structure: Other road ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 101 (year 2021),  Truck Traffic: 1%,  Features Intersected: US-301/MANATEE RIVER,  Facility Carried by Structure: I-75 SB (SR-93)
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 130103,  Location: 3.5 MI NORTH OF SR-64 (Lat: 27.525294,  Lng: -82.506558),  Route carried "under" structure: City street ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 1,440 (year 2021),  Truck Traffic: 2%,  Features Intersected: US-301/MANATEE RIVER,  Facility Carried by Structure: I-75 SB (SR-93)
Minimum Vertical Clearance: 5.73m (18.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 130103,  Location: 3.5 MI NORTH OF SR-64 (Lat: 27.525294,  Lng: -82.506558),  Route carried "under" structure: US 301,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 37,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: US-301/MANATEE RIVER,  Facility Carried by Structure: I-75 SB (SR-93)
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 6.759,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 130104,  Location: 3.5 MI NORTH OF SR-64 (Lat: 27.525408,  Lng: -82.506175),  Route carried "under" structure: Other road ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 101 (year 2021),  Truck Traffic: 1%,  Features Intersected: US-301/ MANATEE RIVER,  Facility Carried by Structure: I-75 NB (SR-93)
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 130104,  Location: 3.5 MI NORTH OF SR-64 (Lat: 27.525408,  Lng: -82.506175),  Route carried "under" structure: City street ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 1,440 (year 2021),  Truck Traffic: 2%,  Features Intersected: US-301/ MANATEE RIVER,  Facility Carried by Structure: I-75 NB (SR-93)
Minimum Vertical Clearance: 5.73m (18.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 130104,  Location: 3.5 MI NORTH OF SR-64 (Lat: 27.525408,  Lng: -82.506175),  Route carried "under" structure: US 301,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 37,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: US-301/ MANATEE RIVER,  Facility Carried by Structure: I-75 NB (SR-93)
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 6.799,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 130107,  Location: 2.0 MI S OF I-275 (Lat: 27.546861,  Lng: -82.510894),  Route carried "under" structure: Interstate 75,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 85,500 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-75 (SR-93),  Facility Carried by Structure: MENDOZA RD (37TH)
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 19.657,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 130112,  Location: 0.6 MI EAST OF US-41 (Lat: 27.585383,  Lng: -82.515619),  Route carried "under" structure: Ramp Interstate 275,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 18,000 (year 2020),  Truck Traffic: 7%,  Features Intersected: I-75 AND I-275 RAMPS
Minimum Vertical Clearance: 10.97m (35.99ft),  Kilometerpoint: 0.694,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 76.5m (251.0ft)

Find on map >>   Show street view

Structure Number: 130112,  Location: 0.6 MI EAST OF US-41 (Lat: 27.585383,  Lng: -82.515619),  Route carried "under" structure: Interstate 75,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 58,000 (year 2020),  Truck Traffic: 18%,  Features Intersected: I-75 AND I-275 RAMPS
Minimum Vertical Clearance: 7.25m (23.79ft),  Kilometerpoint: 24.032,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 76.5m (251.0ft)

Find on map >>   Show street view

Structure Number: 130112,  Location: 0.6 MI EAST OF US-41 (Lat: 27.585383,  Lng: -82.515619),  Route carried "under" structure: Ramp Interstate 275,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 17,000 (year 2020),  Truck Traffic: 7%,  Features Intersected: I-75 AND I-275 RAMPS
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 1.281,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 76.5m (251.0ft)

Find on map >>   Show street view

Structure Number: 130122,  Location: 1.0MI EAST OF US-41 (Lat: 27.585689,  Lng: -82.527336),  Route carried "under" structure: Interstate 275,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 54,000 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-275/SR-93,  Facility Carried by Structure: CR-683
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 2.382,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.0m (150.9ft)

Discuss Ellenton, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.