Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Elgin, Nebraska (NE)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 49ft / 14.9mTotal length
  • 4,045Total average daily traffic
  • 477Total average daily truck traffic
  • 5,846Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Elgin
  • No street view available for this location

New bridges in Elgin, NE - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 11960-1969
  • 21970-1979
  • 31990-1999
  • 12000-2009
  • 22010-2019
  • 12020-2022
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Good
  • 83.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 66.7%Good
  • 16.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 33.3%Good
  • 16.7%Fair
  • 33.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Excellent
  • 20.0%Very good
  • 10.0%Good
  • 20.0%Fair
  • 30.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Excellent
  • 60.0%Very good
  • 20.0%Good
Find on map >>   Show street view

Structure Number: C00020021,  Location: 2.5N & 2E OF ELGIN (Lat: 42.024500,  Lng: -98.046800),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 75 (year 2003),  Average Future Daily Traffic: 100 (year 2038),  Design Load: HL 93,  Features Intersected: BLACKSNAKE CREEK,  Facility Carried by Structure: RD 523
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 42.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: C00020231,  Location: 3N OF ELGIN (Lat: 42.029700,  Lng: -98.084800),  Route carried "on" structure: County highway 23,  Year Built: 2001,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 80 (year 2003),  Average Future Daily Traffic: 136 (year 2038),  Features Intersected: WEST CEDAR CREEK,  Facility Carried by Structure: 521ST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: C000205805,  Location: 3N 1E OF ELGIN (Lat: 42.031000,  Lng: -98.064500),  Route carried "on" structure: County highway 58,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 15 (year 2003),  Average Future Daily Traffic: 25 (year 2038),  Features Intersected: WEST CEDAR CREEK,  Facility Carried by Structure: 842ND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 38.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: C000206005,  Location: SJCT N14/70 2N .8W (Lat: 42.016500,  Lng: -98.098900),  Route carried "on" structure: County highway 2560,  Year Built: 1970,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 185 (year 2011),  Average Future Daily Traffic: 185 (year 2038),  Features Intersected: WEST CEDAR CREEK,  Facility Carried by Structure: 841ST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.017,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: C000206005P,  Location: 2NE OF ELGIN (Lat: 42.010500,  Lng: -98.045300),  Route carried "on" structure: County highway P60,  Year Built: 1965,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 40 (year 2003),  Average Future Daily Traffic: 68 (year 2038),  Features Intersected: WEST CEDAR CREEK,  Facility Carried by Structure: 841ST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Poor,  Channel: Poor,  Operating Rating: 28.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: C000206805,  Location: 1S 3.5E OF ELGIN (Lat: 41.959300,  Lng: -98.017600),  Route carried "on" structure: County highway 7643,  Year Built: 1976,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 90 (year 1998),  Average Future Daily Traffic: 153 (year 2041),  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: 837TH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.403,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: C00020691,  Location: _ (Lat: 41.971553,  Lng: -98.027414),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 35 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 59 (year 2041),  Design Load: HL 93,  Features Intersected: CEDAR CREEK TRIB,  Facility Carried by Structure: 524TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.9m (9.5ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 93.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 80.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: C000216605,  Location: 1SW OF ELGIN (Lat: 41.973300,  Lng: -98.108300),  Route carried "on" structure: County highway 166,  Year Built: 1994,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 40 (year 2003),  Average Future Daily Traffic: 68 (year 2038),  Features Intersected: WEST CEDAR CREEK,  Facility Carried by Structure: TOWNSHIP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Culverts: Good,  Operating Rating: 43.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: S014 14865,  Location: 4N ELGIN (Lat: 42.034800,  Lng: -98.070600),  Route carried "on" structure: State highway 14,  Year Built: 1990,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 2,085 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,023 (year 2038),  Design Load: HS 20,  Features Intersected: WEST CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.923,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S070 19017,  Location: 1W ELGIN (Lat: 41.987600,  Lng: -98.097000),  Route carried "on" structure: State highway 70,  Year Built: 1993,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,390 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,016 (year 2038),  Design Load: HS 20,  Features Intersected: WEST CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.605,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 43.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: S070 19048L,  Location: JCT N14/N70 .3W (Lat: 41.987600,  Lng: -98.090900),  Route carried "on" structure: County highway P21,  Year Built: 2013,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 10 (year 2003),  Average Future Daily Traffic: 13 (year 2033),  Design Load: HL 93,  Features Intersected: WEST CEDAR CREEK,  Facility Carried by Structure: PRIVATE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 42.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Discuss Elgin, Nebraska (NE) on our hugely popular Nebraska forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.