Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for East Pittsburgh, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 636ft / 194mTotal length
  • $24,850,000Total costs
  • 67,241Total average daily traffic
  • 3,850Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for East Pittsburgh
  • No street view available for this location

New bridges in East Pittsburgh, PA - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 61970-1979
  • 22010-2019
Reconstructed bridges in East Pittsburgh, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 42010-2019
Average Bridge Daily Traffic in East Pittsburgh, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 71.4%Good
  • 14.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 71.4%Very good
  • 14.3%Good
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Very good
  • 42.9%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 673,  Location: RT 30 OVER BESSEMER AVE (Lat: 40.394908,  Lng: -79.838653),  Route carried "on" structure: US 30,  Year Built: 1937,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 19,680 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 22,553 (year 2032),  Design Load: HL 93,  Features Intersected: OVER BESSEMER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.346,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $279,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 674,  Location: Westinghouse Bridge (Lat: 40.392700,  Lng: -79.836272),  Route carried "on" structure: US 30,  Year Built: 1931,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 46.45m (152.40ft),  Average Daily Traffic: 19,680 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 22,553 (year 2032),  Design Load: HS 20,  Features Intersected: LR1074,TURTLE CR,N&S RR,  Facility Carried by Structure: Westinghouse Brg
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.606,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 140.2m (460.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 46.50m (152.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $285,000,  Roadway Improvement Cost: $839,000,  Total Project Cost: $3,845,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1547,  Location: TriBoro Expressway (Lat: 40.394833,  Lng: -79.836828),  Route carried "on" structure: State highway ,  Year Built: 1974,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 22.49m (73.79ft),  Average Daily Traffic: 3,169 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,726 (year 2032),  Design Load: HS 20,  Features Intersected: BRADDOCK AVE,RAMP B,  Facility Carried by Structure: RAMP R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.658,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.50m (70.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $633,000,  Roadway Improvement Cost: $4,571,000,  Total Project Cost: $8,543,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1549,  Location: TriBoro Expressway (Lat: 40.395339,  Lng: -79.837019),  Route carried "on" structure: State highway ,  Year Built: 1974,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 35.27m (115.72ft),  Average Daily Traffic: 3,432 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,344 (year 2032),  Design Load: HS 20,  Features Intersected: UNION R R,  Facility Carried by Structure: RAMP R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.658,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Number Of Approach Spans: 1,  Length of Maximum Span: 37.8m (124.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 31.50m (103.35ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $881,000,  Total Project Cost: $4,038,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1635,  Location: TriBoro Expressway (Lat: 40.396667,  Lng: -79.838333),  Route carried "on" structure: Spur State highway ,  Year Built: 1974,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 36.33m (119.19ft),  Average Daily Traffic: 6,668 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,808 (year 2032),  Design Load: HS 20,  Features Intersected: NS RR,UNION RR,MAIN ST,  Facility Carried by Structure: RAMP S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.410,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 29 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 2,  Length of Maximum Span: 49.4m (162.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 40.20m (131.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $1,777,000,  Total Project Cost: $8,145,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48208,  Location: TriBoro Expressway (Lat: 40.393514,  Lng: -79.835389),  Route carried "on" structure: State highway ,  Year Built: 2013,  Status: Open,  Structure Length: 25.63m (84.09ft),  Average Daily Traffic: 3,169 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,988 (year 2032),  Design Load: HL 93,  Features Intersected: ELDER ST, TURTLE CRK, RR,  Facility Carried by Structure: RAMP T
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.658,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 2,  Length of Maximum Span: 63.1m (207.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48209,  Location: TriBoro Expressway (Lat: 40.393372,  Lng: -79.835078),  Route carried "on" structure: State highway ,  Year Built: 2013,  Status: Open,  Structure Length: 25.63m (84.09ft),  Average Daily Traffic: 3,432 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,344 (year 2032),  Design Load: HL 93,  Features Intersected: ELDER ST, TURTLE CRK, RR,  Facility Carried by Structure: RAMP T
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.658,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 2,  Length of Maximum Span: 61.3m (201.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 673,  Location: RT 30 OVER BESSEMER AVE (Lat: 40.394908,  Lng: -79.838653),  Route carried "under" structure: City street ,  Year Built: 1937,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2004),  Truck Traffic: 1%,  Features Intersected: OVER BESSEMER AVE,  Facility Carried by Structure: SR 0030 EB WB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 674,  Location: Westinghouse Bridge (Lat: 40.392700,  Lng: -79.836272),  Route carried "under" structure: State highway ,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 3,334 (year 2022),  Truck Traffic: 6%,  Features Intersected: LR1074,TURTLE CR,N&S RR,  Facility Carried by Structure: Westinghouse Brg
Minimum Vertical Clearance: 15.85m (52.00ft),  Kilometerpoint: 0.410,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 140.2m (460.0ft)

Find on map >>   Show street view

Structure Number: 674,  Location: Westinghouse Bridge (Lat: 40.392700,  Lng: -79.836272),  Route carried "under" structure: State highway ,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 3,334 (year 2022),  Truck Traffic: 6%,  Features Intersected: LR1074,TURTLE CR,N&S RR,  Facility Carried by Structure: Westinghouse Brg
Minimum Vertical Clearance: 15.85m (52.00ft),  Kilometerpoint: 0.410,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 140.2m (460.0ft)

Find on map >>   Show street view

Structure Number: 1547,  Location: TriBoro Expressway (Lat: 40.394833,  Lng: -79.836828),  Route carried "under" structure: Ramp State highway ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 143 (year 2022),  Truck Traffic: 7%,  Features Intersected: BRADDOCK AVE,RAMP B,  Facility Carried by Structure: RAMP R
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 1547,  Location: TriBoro Expressway (Lat: 40.394833,  Lng: -79.836828),  Route carried "under" structure: City street ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2000),  Truck Traffic: 7%,  Features Intersected: BRADDOCK AVE,RAMP B,  Facility Carried by Structure: RAMP R
Minimum Vertical Clearance: 10.84m (35.56ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 1635,  Location: TriBoro Expressway (Lat: 40.396667,  Lng: -79.838333),  Route carried "under" structure: City street ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 1997),  Truck Traffic: 5%,  Features Intersected: NS RR,UNION RR,MAIN ST,  Facility Carried by Structure: RAMP S
Minimum Vertical Clearance: 7.92m (25.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.4m (162.1ft)

Discuss East Pittsburgh, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.