Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dighton, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 56ft / 16.6mTotal length
  • $9,725,000Total costs
  • 51,561Total average daily traffic
  • 3,740Total average daily truck traffic
  • 124,605Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dighton
  • No street view available for this location

New bridges in Dighton, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11910-1919
  • 31930-1939
  • 51950-1959
  • 21960-1969
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Dighton, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Dighton, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 45.5%Good
  • 27.3%Satisfactory
  • 18.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 41.7%Good
  • 16.7%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 41.7%Good
  • 41.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 71.4%Good
  • 14.3%Satisfactory
  • 7.1%Fair
Find on map >>   Show street view

Structure Number: D080013L8MUNNBI,  Location: DIGHTON/SOMERSET LINE (Lat: 41.790911,  Lng: -71.124447),  Route carried "on" structure: City street ,  Year Built: 1938,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 2.24m (7.35ft),  Average Daily Traffic: 1,119 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,632 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: WATER BROAD COVE,  Facility Carried by Structure: HWY PLEASANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.6m (67.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 83.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $868,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,303,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: D080023L9MUNNBI,  Location: AT INT OF MUDDY COVE LN (Lat: 41.809533,  Lng: -71.119689),  Route carried "on" structure: City street ,  Year Built: 1914,  Year Reconstructed: 1949,  Status: Posted for load,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 1,271 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,317 (year 2031),  Features Intersected: WATER MUDDY COVE BROOK,  Facility Carried by Structure: HWY PLEASANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 22.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $432,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $649,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: D080053L7MUNNBI,  Location: .5 MI N OF MAIN ST (Lat: 41.823394,  Lng: -71.124639),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 2,200 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,001 (year 2031),  Design Load: H 20,  Features Intersected: WATER SEGREGANSET RIVER,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.120,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.1m (36.4ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $487,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $731,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D08006BJMMUNNBI,  Location: 0.2 MI W OF RT 138 (Lat: 41.825542,  Lng: -71.126933),  Route carried "on" structure: City street ,  Year Built: 2014,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 600 (year 2018),  Truck Traffic: 3%,  Design Load: HL 93,  Features Intersected: WATER SEGREGANSET RIVER,  Facility Carried by Structure: HWY BROOK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.416,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D080083LAMUNNBI,  Location: 1 MI.WEST OF ST.138 (Lat: 41.840031,  Lng: -71.142778),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1920,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 5,600 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,265 (year 2032),  Features Intersected: WATER SEGREGANSET RIVER,  Facility Carried by Structure: HWY CENTER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $538,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: D0801094NMUNNBI,  Location: 2.8 MI. S OF TAUNTON T.L. (Lat: 41.844864,  Lng: -71.157472),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,000 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 15,477 (year 2032),  Design Load: H 20,  Features Intersected: WATER SEGREGANSET RIVER,  Facility Carried by Structure: HWY WILLIAMS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.327,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $317,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: D0801372WMUNNBI,  Location: JUST WEST ST 138 (Lat: 41.855975,  Lng: -71.116000),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,263 (year 2033),  Design Load: HS 20,  Features Intersected: WATER THREE MILE RIVER,  Facility Carried by Structure: HWY OLD SMRST AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 74.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $662,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $994,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: D080143J9MUNNBI,  Location: WEST OF D08020 (3JA) (Lat: 41.864539,  Lng: -71.122025),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 4,108 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,108 (year 2031),  Design Load: H 20,  Features Intersected: WATER THREE MILE RIVER,  Facility Carried by Structure: HWY SPRING ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.075,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.2m (23.6ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $46,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $70,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D080153LDMUNNBI,  Location: .2 MI S OF MAIN ST (Lat: 41.813578,  Lng: -71.128592),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,600 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,369 (year 2032),  Design Load: H 20,  Features Intersected: WATER MUDDY COVE BROOK,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.042,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $406,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $610,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D080163WEDOTNBI,  Location: .1 MI.S OF MAIN ST (Lat: 41.811836,  Lng: -71.121556),  Route carried "on" structure: State highway 138,  Year Built: 1963,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 6,211 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,793 (year 2032),  Design Load: H 20,  Features Intersected: WATER MUDDY COVE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.364,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $95,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $143,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: D080183WDDOTNBI,  Location: 1.5 MI. N OF CENTER ST. (Lat: 41.855486,  Lng: -71.115444),  Route carried "on" structure: State highway 138,  Year Built: 1932,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 5,928 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,109 (year 2032),  Features Intersected: WATER THREE MILE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.305,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: December 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $885,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $1,328,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: D080203JAMUNNBI,  Location: @ TAUNTON TOWN LINE (Lat: 41.864411,  Lng: -71.121389),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 4,108 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,108 (year 2031),  Design Load: H 20,  Features Intersected: WATER THREE MILE RIVER,  Facility Carried by Structure: HWY SPRING ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 69.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2020,  Underwater Inspection Date: December 2020,  Bridge Improvement Cost: $68,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $103,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D080213J7MUNNBI,  Location: 1 MI SOUTH OF ST 44 (Lat: 41.866931,  Lng: -71.125294),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 4,244 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 17,372 (year 2032),  Design Load: HS 20,  Features Intersected: WATER THREE MILE RIVER,  Facility Carried by Structure: HWY WARNER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,740,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $2,611,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D080223LEMUNNBI,  Location: .2 MI W OF WILLIAM ST (Lat: 41.846289,  Lng: -71.164394),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 3,572 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,791 (year 2032),  Features Intersected: WATER SEGREGANSET RIVER,  Facility Carried by Structure: HWY HORTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.5m (8.2ft)

Condition: Channel: Fair,  Culverts: Fair,  Inventory Rating: 87.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $328,000 ( Estimate for 2022)
Discuss Dighton, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.