Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Delhi, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 131ft / 39.7mTotal length
  • $28,177,000Total costs
  • 26,031Total average daily traffic
  • 2,150Total average daily truck traffic
  • 29,051Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Delhi
  • No street view available for this location

New bridges in Delhi, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 41930-1939
  • 21940-1949
  • 21950-1959
  • 21970-1979
  • 41990-1999
  • 32000-2009
  • 32010-2019
Reconstructed bridges in Delhi, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
  • 12000-2009
  • 32010-2019
Average Bridge Daily Traffic in Delhi, NY
Average Bridge Truck Traffic in Delhi, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Excellent
  • 28.6%Very good
  • 14.3%Good
  • 14.3%Satisfactory
  • 19.0%Fair
  • 9.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Excellent
  • 19.0%Very good
  • 23.8%Good
  • 19.0%Satisfactory
  • 14.3%Fair
  • 9.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 19.0%Excellent
  • 14.3%Very good
  • 23.8%Good
  • 23.8%Satisfactory
  • 14.3%Fair
  • 4.8%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.8%Very good
  • 42.9%Good
  • 33.3%Satisfactory
  • 14.3%Fair
  • 4.8%Poor
Find on map >>   Show street view

Structure Number: 100775,  Location: 3.8 MI SW JCT RTS 10 +28 (Lat: 42.242942,  Lng: -74.964700),  Route carried "on" structure: State highway 10,  Year Built: 2017,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 3,177 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,314 (year 2040),  Design Load: HL 93,  Features Intersected: PLATNER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.893,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $747,000,  Roadway Improvement Cost: $438,000,  Total Project Cost: $1,185,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100776,  Location: 1.6 MI N JCT RTS 10 + 28 (Lat: 42.298939,  Lng: -74.902472),  Route carried "on" structure: State highway 10,  Year Built: 1936,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,842 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,921 (year 2040),  Features Intersected: FALLS MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 73.065,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $519,000,  Roadway Improvement Cost: $304,000,  Total Project Cost: $824,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100777,  Location: 2.2 MI NE JCT RTS 10 + 28 (Lat: 42.299497,  Lng: -74.892383),  Route carried "on" structure: State highway 10,  Year Built: 1936,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,842 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,921 (year 2040),  Design Load: H 20,  Features Intersected: ELK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 73.998,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $605,000,  Roadway Improvement Cost: $354,000,  Total Project Cost: $959,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101985,  Location: 4.8 MI SE JCT SH 28 & SH (Lat: 42.257914,  Lng: -74.862814),  Route carried "on" structure: State highway 28,  Year Built: 2000,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 1,710 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,726 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GLEN BURNIE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.894,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $476,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $755,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 101986,  Location: JCT SH 28 & W BR DELAWARE (Lat: 42.274769,  Lng: -74.916194),  Route carried "on" structure: State highway 28,  Year Built: 1941,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 2,526 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,549 (year 2040),  Design Load: H 20,  Features Intersected: W BR DELAWARE RVR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.231,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $2,422,000,  Roadway Improvement Cost: $1,418,000,  Total Project Cost: $3,840,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101987,  Location: JCT SH28 & W BR DELAWARE (Lat: 42.275142,  Lng: -74.916683),  Route carried "on" structure: State highway 28,  Year Built: 1941,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 2,526 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,549 (year 2040),  Design Load: H 20,  Features Intersected: W BR DELAWARE RVR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.150,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $2,455,000,  Roadway Improvement Cost: $1,438,000,  Total Project Cost: $3,893,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101988,  Location: 1.7 MI N JCT SH 28 & SH 1 (Lat: 42.300147,  Lng: -74.907875),  Route carried "on" structure: State highway 28,  Year Built: 1936,  Year Reconstructed: 1966,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,477 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,500 (year 2040),  Design Load: H 20,  Features Intersected: FALLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.400,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $735,000,  Roadway Improvement Cost: $430,000,  Total Project Cost: $1,166,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101989,  Location: 2.7 MI N JCT SH 28 & SH 1 (Lat: 42.313278,  Lng: -74.909728),  Route carried "on" structure: State highway 28,  Year Built: 1936,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,477 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,500 (year 2040),  Design Load: H 20,  Features Intersected: HONEST BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.977,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $626,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226305,  Location: 4.8 MI E OF DELANCEY (Lat: 42.215481,  Lng: -74.892033),  Route carried "on" structure: Other road ,  Year Built: 1975,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 14 (year 2039),  Features Intersected: BAGLEY BROOK,  Facility Carried by Structure: CHARLIE WOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $294,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $467,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226322,  Location: 1.5 M W OF DELHI (Lat: 42.270436,  Lng: -74.954603),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 221 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 309 (year 2039),  Design Load: HS 20,  Features Intersected: PEAKES BROOK,  Facility Carried by Structure: PEAKES BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 96.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $384,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $609,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226906,  Location: 1 MI N OF DELHI OFF SH 28 (Lat: 42.310775,  Lng: -74.909881),  Route carried "on" structure: ServiceOther road ,  Year Built: 1997,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 40 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 56 (year 2038),  Design Load: H 20,  Features Intersected: HONEST BROOK,  Facility Carried by Structure: EMERSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $438,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $694,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335221,  Location: 1 MILE NW OF FRASER (Lat: 42.255381,  Lng: -74.976508),  Route carried "on" structure: County highway ,  Year Built: 1953,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 523 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 732 (year 2036),  Design Load: HS 20,  Features Intersected: PLATNER BROOK,  Facility Carried by Structure: TREADWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.722,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $804,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335222,  Location: 2.2 MILES NW OF FRASER (Lat: 42.271106,  Lng: -74.986097),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 523 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 732 (year 2036),  Features Intersected: PLATNER BROOK,  Facility Carried by Structure: CR16 FRASR-TRDWEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.781,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $266,000,  Total Project Cost: $720,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335223,  Location: 0.5 MI N OF DELHI (Lat: 42.291439,  Lng: -74.930808),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 1,017 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,060 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SPRING VALLEY CREEK,  Facility Carried by Structure: DELHI-TREADWELL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,207,000,  Roadway Improvement Cost: $707,000,  Total Project Cost: $1,915,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 335224,  Location: .3 MI S OF GLEN WILD (Lat: 42.257956,  Lng: -74.927497),  Route carried "on" structure: Other road ,  Year Built: 1953,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 1,700 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,380 (year 2036),  Design Load: HS 20,  Features Intersected: LITT DELAWARE RVR,  Facility Carried by Structure: ARBOR HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.747,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $330,000,  Total Project Cost: $893,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335225,  Location: 1 MILE SW OF DELHI (Lat: 42.259983,  Lng: -74.928542),  Route carried "on" structure: Other road ,  Year Built: 1993,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 2,037 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,852 (year 2036),  Features Intersected: W BR DELAWARE RIVER,  Facility Carried by Structure: SHERWOODS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.1m (144.7ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $1,778,000,  Roadway Improvement Cost: $1,041,000,  Total Project Cost: $2,820,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335226,  Location: IN DELHI (Lat: 42.278386,  Lng: -74.912283),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 815 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,141 (year 2038),  Features Intersected: W BR DELAWARE RVR,  Facility Carried by Structure: BRIDGE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $1,773,000,  Roadway Improvement Cost: $1,038,000,  Total Project Cost: $2,812,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335227,  Location: 2 MI NE OF DELHI (Lat: 42.298281,  Lng: -74.879281),  Route carried "on" structure: Other road ,  Year Built: 1870,  Year Reconstructed: 2001,  Status: Posted for load,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 215 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 301 (year 2036),  Features Intersected: W BR DELAWARE RIVER,  Facility Carried by Structure: FITCHES BRIDGE RD
Minimum Vertical Clearance: 3.02m (9.91ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,257,000,  Roadway Improvement Cost: $736,000,  Total Project Cost: $1,993,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 335353,  Location: 1 MI S OF DELHI (Lat: 42.252425,  Lng: -74.900947),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 67 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 94 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: LITT DELAWARE RV,  Facility Carried by Structure: THOMPSON CROSS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $584,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 337073,  Location: .9 mi W Rt 16 (Lat: 42.256717,  Lng: -74.980317),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 143 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 200 (year 2038),  Features Intersected: WEST PLATNER BROOK,  Facility Carried by Structure: WEST PLATNER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $277,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 337074,  Location: .9 mi W Rt 16 (Lat: 42.258153,  Lng: -74.984364),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 143 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 200 (year 2038),  Features Intersected: WEST PLATNER BROOK,  Facility Carried by Structure: WEST PLATNER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $341,000 ( Estimate for 2021)
Discuss Delhi, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.